| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Apex Landscape & Irrigation, LLC | $1,641,518 | Low | -18% |
Engineer's estimate: $2,005,831.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Apex Landscape & Irrigation, LLC |
|---|---|---|---|---|---|
| 1 | Excavation (special) (110-7003) | CY | 3,308 | $100.00 | $25.00 |
| 2 | Furn & place topsoil (vehicle) (160-7007) | CY | 1,654 | $50.00 | $50.00 |
| 3 | Erosion control compost (vehicle) (161-7008) | CY | 2,874 | $32.00 | $50.00 |
| 4 | General use compost (vehicle) (161-7010) | CY | 1,441 | $34.00 | $47.50 |
| 5 | Block sodding (162-7002) | SY | 5,179 | $5.50 | $6.00 |
| 6 | Fertilizer (166-7001) | ACRE | 1.09 | $1,250.00 | $325.00 |
| 7 | Vegetative watering (168-7001) | TGL | 128 | $38.00 | $30.00 |
| 8 | Soil amend (type I) (192-7008) | SY | 25,894 | $0.45 | $1.40 |
| 9 | Plant bed preparation (type III) (192-7012) | SY | 25,894 | $1.25 | $3.75 |
| 10 | Plant material (15 gal) (tree) (192-7037) | EACH | 2,175 | $200.00 | $170.00 |
| 11 | Plant material (5 gal) (shrub) (192-7047) | EACH | 2,754 | $35.00 | $30.00 |
| 12 | Soil amend (type II) (192-7084) | SY | 25,894 | $0.50 | $2.30 |
| 13 | Landscape establish (193-7001) | MO | 12 | $9,500.00 | $12,000 |
| 14 | Landscape treat (type I) (193-7023) | EACH | 4,929 | $1.20 | $4.00 |
| 15 | Landscape treat (type II) (193-7024) | EACH | 4,929 | $1.25 | $0.50 |
| 16 | Landscape treat (type III) (193-7028) | EACH | 4,929 | $2.00 | $2.00 |
| 17 | Landscape treat (type IV) (193-7037) | CYC | 2 | $6,250.00 | $10,000 |
| 18 | Mobilization (500-7001) | LS | 1 | $175,337 | $171,000 |
| 19 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $8,500.00 | $30,000 |
| 20 | TMA (stationary) (505-7001) | DAY | 55 | $700.00 | $1.00 |
| 21 | TMA (mobile operation) (505-7003) | DAY | 75 | $700.00 | $1.00 |
| 22 | Construction exits (install) (type 3) (506-7022) | SY | 5,179 | $45.00 | $5.00 |
| 23 | Construction exits (remove) (506-7024) | SY | 5,179 | $25.00 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.