TxDOT contract A00214167 bid tabulation

PAVEMENT MARKINGS, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section). Let by Texas DOT on April 9, 2025, Kaufman, Dallas District. 5 bids received; low bid $640,311 by Traffic Highway Maintenance, LLC, -12% against the engineer's estimate of $730,017.

Owner
Texas DOT
Letting
09 APR 2025
Pay items
55
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Traffic Highway Maintenance, LLC$640,311Low-12%
2TRP Infrastructure Services, LLC$722,516+13%-1.0%
3Stripe-A-Zone, LLC$722,896+13%-1.0%
4The Confidence Group, Inc$775,409+21%+6.0%
5Striping Technology, L.P.$870,478+36%+19%
TxDOT contract A00214167: bids by rank

Engineer's estimate: $730,017.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Traffic Highway Maintenance, LLC2. TRP Infrastructure Services, LLC3. Stripe-A-Zone, LLC4. The Confidence Group, Inc5. Striping Technology, L.P.
1Mobilization (500-7001)LS1$35,000$20,000$55,000$80,000$70,000$40,000
2Barricades, signs and traffic handling (502-7001)MO5$1,000.00$3,125.00$6,750.00$1,000.00$2,500.00$2,000.00
3Portable changeable message sign (503-7001)DAY75$75.00$40.00$50.00$25.00$65.00$250.00
4TMA (stationary) (505-7001)DAY45$200.00$1.00$10.00$1.00$200.00$200.00
5TMA (mobile operation) (505-7003)DAY90$200.00$1.00$10.00$1.00$800.00$200.00
6Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH418$1.25$3.00$2.00$0.50$0.85$2.00
7Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF75$2.00$2.30$1.70$1.75$1.93$2.00
8Reflectorized pavement marking type I (W)6"(lane drop)(100MIL) (666-7012)LF50$2.00$2.00$1.30$0.95$2.32$2.00
9Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF239$3.00$3.20$1.85$1.55$3.00$2.00
10Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF36,020$1.00$1.00$0.90$0.90$1.14$0.93
11Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027)LF133$3.00$3.00$5.00$3.25$3.63$5.00
12Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF5,410$4.00$4.00$3.85$4.25$2.50$4.65
13Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF7,988$8.00$8.00$6.15$8.25$7.30$5.80
14Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH160$150.00$170.00$125.00$199.00$180.00$132.75
15Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH3$300.00$250.00$195.00$320.00$222.00$185.50
16Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051)EACH5$400.00$390.00$200.00$350.00$195.00$255.55
17Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH126$245.00$200.00$165.00$229.00$189.00$160.75
18Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081)EACH5$825.00$675.00$595.00$600.00$426.00$555.50
19Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH94$90.00$60.00$59.00$55.00$52.00$38.50
20Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114)LF50$3.00$3.00$2.00$0.95$1.81$2.00
21Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF1,570$4.00$4.00$3.90$6.95$3.80$4.70
22Pavement sler 8" (666-7348)LF50$0.25$0.25$0.27$0.50$0.83$2.00
23Pavement sler 12" (666-7350)LF4,965$0.65$0.65$0.80$1.00$1.00$2.00
24Pavement sler 24" (666-7352)LF7,388$1.45$1.45$1.45$2.00$1.60$3.00
25Pavement sler (arrow) (666-7353)EACH2$27.00$40.00$27.00$70.00$29.37$100.00
26Pavement sler (word) (666-7354)EACH2$36.00$50.00$33.00$70.00$38.00$150.00
27Pavement sler (double arrow) (666-7356)EACH1$55.00$82.00$39.00$70.00$48.00$150.00
28Pavement sler (uturn arrow) (666-7358)EACH1$75.00$92.00$40.00$70.00$24.00$150.00
29Pavement sler (RR crossing) (666-7364)EACH1$145.00$168.00$119.00$225.00$100.00$500.00
30Pavement sler (yld tri) (666-7365)EACH1$17.00$23.00$11.00$20.00$14.00$30.50
31Reflectorized pavement marker type I-A (672-7001)EACH45$6.00$6.00$3.60$4.95$5.95$7.00
32Reflectorized pavement marker type I-C (672-7002)EACH2,531$5.00$4.85$3.60$4.95$4.80$5.20
33Reflectorized pavement marker type I-R (672-7003)EACH25$5.00$30.00$9.80$30.00$5.00$7.00
34Reflectorized pavement marker type II-A-A (672-7004)EACH2,365$5.00$4.85$5.00$4.95$8.00$5.20
35Reflectorized pavement marker type II-C-R (672-7006)EACH9,562$5.00$4.85$5.00$5.50$6.00$5.20
36Eliminating existing PM & markers (8") (677-7004)LF50$3.00$1.70$1.00$1.50$1.87$3.00
37Eliminating existing PM & markers (12") (677-7006)LF8,465$3.00$2.00$1.70$2.25$1.75$3.00
38Eliminating existing PM & markers (24") (677-7008)LF3,683$4.00$3.00$2.85$3.50$3.75$3.50
39Eliminating existing PM & markers (arrow) (677-7009)EACH5$100.00$100.00$41.00$100.00$43.00$100.00
40Eliminating existing PM & markers (double arrow) (677-7010)EACH1$175.00$175.00$56.00$120.00$52.00$100.00
41Eliminating existing PM & markers (uturn arrow) (677-7012)EACH2$175.00$175.00$70.00$120.00$54.00$100.00
42Eliminating existing PM & markers (word) (677-7015)EACH5$135.00$140.00$47.00$100.00$49.00$100.00
43Eliminating existing PM & markers (RR crossing) (677-7019)EACH1$375.00$400.00$178.00$250.00$163.00$250.00
44Eliminating existing PM & markers (36")(yld tri) (677-7024)EACH3$77.00$75.00$34.00$25.00$18.00$25.00
45Pavement surface preparation for marking (8") (678-7004)LF50$0.10$0.35$0.09$0.50$1.19$1.00
46Pavement surface preparation for marking (12") (678-7006)LF4,990$0.15$0.01$0.28$0.75$0.35$1.00
47Pavement surface preparation for marking (24") (678-7008)LF6,360$0.40$0.01$0.50$1.00$0.87$1.00
48Pavement surface preparation for marking (arrow) (678-7009)EACH5$22.00$5.00$12.00$40.00$18.00$1.00
49Pavement surface preparation for marking (double arrow) (678-7010)EACH1$20.00$5.00$17.00$40.00$20.00$1.00
50Pavement surface preparation for marking (uturn arr) (678-7012)EACH1$19.00$5.00$17.00$40.00$17.00$1.00
51Pavement surface preparation for marking (word) (678-7016)EACH5$23.00$5.00$14.25$40.00$22.38$1.00
52Pavement surface preparation for marking (RR crossing) (678-7020)EACH1$50.00$5.00$55.00$75.00$78.00$100.00
53Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH3$15.00$5.00$5.00$5.00$20.00$1.00
54High friction surface treatment (3009-7001)SY12,884$25.00$22.00$27.00$21.75$21.42$34.50
55Preformed in-lane (trans) rumble strip (6024-7001)LF320$5.50$22.00$13.50$25.00$18.00$15.75
TxDOT contract A00214167: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy