PUMP STATION & DRAINAGE SYSTEM CLEANING, SH0146 (VARIOUS HWYS IN GALVESTON COUNTY to VARIOUS HWYS IN GALVESTON COUNTY). Let by Texas DOT on December 9, 2025, Galveston, Houston District. 6 bids received; low bid $255,900 by Xtreme Pro Cleaning LLC, -52% against the engineer's estimate of $534,678.
- Owner
- Texas DOT
- Letting
- 09 DEC 2025
- Pay items
- 18
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Xtreme Pro Cleaning LLC | $255,900 | Low | -52% |
| 2 | Pro-Pipe Services, LLC | $340,498 | +33% | -36% |
| 3 | Sweeping Corporation of America, LLC | $388,850 | +52% | -27% |
| 4 | Jackson Excavation, LLC | $430,700 | +68% | -19% |
| 5 | Aims Companies | $479,025 | +87% | -10% |
| 6 | Equix Integrity Southeast, Inc. | $486,100 | +90% | -9.0% |
Engineer's estimate: $534,678.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Xtreme Pro Cleaning LLC | 2. Pro-Pipe Services, LLC | 3. Sweeping Corporation of America, LLC | 4. Jackson Excavation, LLC | 5. Aims Companies | 6. Equix Integrity Southeast, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (callout) (500-7002) | EACH | 12 | $1,525.16 | $400.00 | $275.00 | $250.00 | $100.00 | $500.00 | $750.00 |
| 2 | TMA (mobile operation) (505-7003) | DAY | 50 | $141.17 | $100.00 | $125.00 | $425.00 | $100.00 | $975.00 | $80.00 |
| 3 | Drain inlet cleaning (764-7001) | EACH | 1,500 | $85.00 | $50.00 | $50.00 | $40.00 | $50.00 | $60.00 | $75.00 |
| 4 | Pump station well cleaning (764-7002) | EACH | 4 | $4.00 | $1,100.00 | $1,000.00 | $1,200.00 | $500.00 | $1,000.00 | $1,500.00 |
| 5 | Basket and inlet pipe cleaning (764-7003) | EACH | 4 | $1,932.23 | $200.00 | $650.00 | $75.00 | $500.00 | $475.00 | $650.00 |
| 6 | Sump cleaning (764-7005) | EACH | 4 | $400.00 | $200.00 | $455.00 | $75.00 | $100.00 | $300.00 | $750.00 |
| 7 | Storm sewer cleaning (pipe)(12"-18"diameter) (764-7007) | LF | 25,000 | $2.80 | $1.50 | $1.70 | $1.90 | $5.00 | $2.50 | $3.00 |
| 8 | Storm sewer cleaning (pipe)(19"-24"diameter) (764-7008) | LF | 22,000 | $3.00 | $1.80 | $2.00 | $2.35 | $5.00 | $2.70 | $3.00 |
| 9 | Storm sewer cleaning (pipe)(25"-30"diameter) (764-7009) | LF | 6,000 | $3.50 | $2.00 | $3.35 | $3.50 | $5.00 | $3.00 | $4.00 |
| 10 | Storm sewer cleaning (pipe)(31"-36"diameter) (764-7010) | LF | 3,000 | $7.00 | $3.00 | $3.75 | $4.00 | $4.00 | $3.50 | $6.00 |
| 11 | Storm sewer cleaning (pipe)(37"-42"diameter) (764-7011) | LF | 750 | $7.89 | $2.80 | $4.75 | $7.00 | $2.00 | $4.00 | $7.00 |
| 12 | Storm sewer cleaning (pipe)(43"-54"diameter) (764-7012) | LF | 200 | $12.00 | $3.25 | $6.75 | $15.00 | $3.00 | $4.25 | $8.00 |
| 13 | Storm sewer clean (box culvert) (<6 SF) (764-7015) | LF | 100 | $9.00 | $4.50 | $5.75 | $1.00 | $1.00 | $7.50 | $12.00 |
| 14 | Storm sewer clean (box culvert) (6-<12 SF) (764-7016) | LF | 5,000 | $10.50 | $4.50 | $8.35 | $12.00 | $5.00 | $11.00 | $10.50 |
| 15 | Storm sewer clean (box culvert)(12-<24 SF) (764-7017) | LF | 8,000 | $15.50 | $4.75 | $9.95 | $12.00 | $5.00 | $14.00 | $12.50 |
| 16 | Storm sewer clean (box culvert)(24-<48 SF) (764-7018) | LF | 100 | $33.50 | $10.00 | $9.95 | $12.00 | $2.00 | $18.00 | $18.00 |
| 17 | Storm sewer clean (box culvert)(48-<96 SF) (764-7019) | LF | 100 | $35.00 | $13.00 | $9.95 | $12.00 | $2.00 | $20.00 | $19.00 |
| 18 | Storm sewer (television inspection) (7000-7001) | LF | 500 | $3.81 | $2.00 | $1.70 | $0.50 | $1.00 | $2.75 | $3.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.