TxDOT contract A00216168 bid tabulation

PUMP STATION & DRAINAGE SYSTEM CLEANING, SH0146 (VARIOUS HWYS IN GALVESTON COUNTY to VARIOUS HWYS IN GALVESTON COUNTY). Let by Texas DOT on December 9, 2025, Galveston, Houston District. 6 bids received; low bid $255,900 by Xtreme Pro Cleaning LLC, -52% against the engineer's estimate of $534,678.

Owner
Texas DOT
Letting
09 DEC 2025
Pay items
18
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Xtreme Pro Cleaning LLC$255,900Low-52%
2Pro-Pipe Services, LLC$340,498+33%-36%
3Sweeping Corporation of America, LLC$388,850+52%-27%
4Jackson Excavation, LLC$430,700+68%-19%
5Aims Companies$479,025+87%-10%
6Equix Integrity Southeast, Inc.$486,100+90%-9.0%
TxDOT contract A00216168: bids by rank

Engineer's estimate: $534,678.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Xtreme Pro Cleaning LLC2. Pro-Pipe Services, LLC3. Sweeping Corporation of America, LLC4. Jackson Excavation, LLC5. Aims Companies6. Equix Integrity Southeast, Inc.
1Mobilization (callout) (500-7002)EACH12$1,525.16$400.00$275.00$250.00$100.00$500.00$750.00
2TMA (mobile operation) (505-7003)DAY50$141.17$100.00$125.00$425.00$100.00$975.00$80.00
3Drain inlet cleaning (764-7001)EACH1,500$85.00$50.00$50.00$40.00$50.00$60.00$75.00
4Pump station well cleaning (764-7002)EACH4$4.00$1,100.00$1,000.00$1,200.00$500.00$1,000.00$1,500.00
5Basket and inlet pipe cleaning (764-7003)EACH4$1,932.23$200.00$650.00$75.00$500.00$475.00$650.00
6Sump cleaning (764-7005)EACH4$400.00$200.00$455.00$75.00$100.00$300.00$750.00
7Storm sewer cleaning (pipe)(12"-18"diameter) (764-7007)LF25,000$2.80$1.50$1.70$1.90$5.00$2.50$3.00
8Storm sewer cleaning (pipe)(19"-24"diameter) (764-7008)LF22,000$3.00$1.80$2.00$2.35$5.00$2.70$3.00
9Storm sewer cleaning (pipe)(25"-30"diameter) (764-7009)LF6,000$3.50$2.00$3.35$3.50$5.00$3.00$4.00
10Storm sewer cleaning (pipe)(31"-36"diameter) (764-7010)LF3,000$7.00$3.00$3.75$4.00$4.00$3.50$6.00
11Storm sewer cleaning (pipe)(37"-42"diameter) (764-7011)LF750$7.89$2.80$4.75$7.00$2.00$4.00$7.00
12Storm sewer cleaning (pipe)(43"-54"diameter) (764-7012)LF200$12.00$3.25$6.75$15.00$3.00$4.25$8.00
13Storm sewer clean (box culvert) (<6 SF) (764-7015)LF100$9.00$4.50$5.75$1.00$1.00$7.50$12.00
14Storm sewer clean (box culvert) (6-<12 SF) (764-7016)LF5,000$10.50$4.50$8.35$12.00$5.00$11.00$10.50
15Storm sewer clean (box culvert)(12-<24 SF) (764-7017)LF8,000$15.50$4.75$9.95$12.00$5.00$14.00$12.50
16Storm sewer clean (box culvert)(24-<48 SF) (764-7018)LF100$33.50$10.00$9.95$12.00$2.00$18.00$18.00
17Storm sewer clean (box culvert)(48-<96 SF) (764-7019)LF100$35.00$13.00$9.95$12.00$2.00$20.00$19.00
18Storm sewer (television inspection) (7000-7001)LF500$3.81$2.00$1.70$0.50$1.00$2.75$3.50
TxDOT contract A00216168: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy