TxDOT contract A00218366 bid tabulation

REFLECTIVE PAVEMENT MARKINGS (LONG LINE), IH0045 (Various Highways in Montgomery County to Various Highways in Montgomery County). Let by Texas DOT on April 14, 2026, Montgomery, Houston District. 4 bids received; low bid $693,268 by TRP Infrastructure Services, LLC, -8.3% against the engineer's estimate of $755,901.

Owner
Texas DOT
Letting
14 APR 2026
Pay items
91
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1TRP Infrastructure Services, LLC$693,268Low-8.0%
2Stripe Lines, Inc.$733,170+6.0%-3.0%
3Batterson, LLP$734,142+6.0%-3.0%
4Interstate Barricades & Markings, Inc.$996,165+44%+32%
TxDOT contract A00218366: bids by rank

Engineer's estimate: $755,901.

Bid tabulation

LinePay itemUnitQuantityEstimate1. TRP Infrastructure Services, LLC2. Stripe Lines, Inc.3. Batterson, LLP4. Interstate Barricades & Markings, Inc.
1Mobilization (callout) (500-7002)EACH12$1,000.00$500.00$2,500.00$2,600.00$4,500.00
2Mobilization (emergency) (500-7033)EACH6$500.00$500.00$5,000.00$3,000.00$10,000
3TMA (stationary) (505-7001)DAY125$100.00$1.00$15.00$10.00$100.00
4TMA (mobile operation) (505-7003)DAY150$250.00$1.00$25.00$10.00$100.00
5Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF500$2.00$1.60$1.00$2.25$2.25
6Reflectorized pavement marking type I (W)8"(broken)(100MIL) (666-7015)LF150$5.00$1.72$1.00$1.85$3.25
7Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF150$2.00$1.72$1.00$1.85$3.25
8Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF4,500$1.00$1.50$0.92$0.95$2.00
9Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF7,500$3.00$3.50$3.25$3.00$4.00
10Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF7,500$6.00$7.00$5.55$6.00$8.00
11Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069)EACH20$500.00$412.00$150.00$355.00$500.00
12Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072)EACH20$500.00$438.00$150.00$550.00$1,000.00
13Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114)LF15,000$1.00$1.35$0.92$0.95$2.00
14Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF2,500$6.00$3.70$3.26$3.00$4.00
15Reflectorized pavement marking type I (Y)(island)(100MIL) (666-7129)SF1,000$4.00$3.31$3.26$3.00$8.00
16Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF25,000$1.00$0.85$1.25$0.90$2.50
17Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF2,500$1.00$0.85$1.50$0.90$2.50
18Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274)LF5,000$1.00$0.99$1.50$0.90$2.50
19Pavement sler 6" (666-7347)LF150,000$0.10$0.13$0.35$0.12$0.25
20Pavement sler 8" (666-7348)LF3,300$0.90$0.17$0.35$0.24$0.35
21Pavement sler 12" (666-7350)LF5,000$0.25$0.26$0.70$0.50$2.00
22Pavement sler 24" (666-7352)LF3,500$0.50$0.52$1.50$1.00$4.00
23Pavement sler (arrow) (666-7353)EACH125$26.00$4.00$25.00$10.00$85.00
24Pavement sler (word) (666-7354)EACH75$20.00$5.95$25.00$10.00$95.00
25Pavement sler (double arrow) (666-7356)EACH50$25.00$6.45$50.00$20.00$100.00
26Pavement sler (TPL arrow) (666-7357)EACH1$20.00$6.00$65.00$30.00$125.00
27Pavement sler (uturn arrow) (666-7358)EACH20$30.00$7.75$50.00$30.00$95.00
28Pavement sler (entr gore) (666-7361)EACH20$148.00$156.00$50.00$100.00$250.00
29Pavement sler (exit gore) (666-7362)EACH20$150.00$163.00$50.00$200.00$500.00
30Pavement sler (symbol) (666-7363)EACH5$9,540.00$13.52$50.00$35.00$100.00
31Pavement sler (RR crossing) (666-7364)EACH10$100.00$20.00$50.00$50.00$200.00
32Pavement sler (yld tri) (666-7365)EACH10$25.00$0.44$15.00$5.00$15.00
33Pavement sler (number) (666-7367)EACH10$11.00$1.12$15.00$5.00$15.00
34Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF30,000$0.80$0.66$0.70$0.58$0.85
35Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF26,400$0.95$0.61$0.70$0.58$0.85
36Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF15,000$0.50$0.66$0.70$0.58$0.85
37Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF30,000$0.65$0.61$0.70$0.58$0.85
38PRFB rumble strip (BLK)(1')(centerline) (668-7002)LF1,000$6.00$6.00$6.00$8.00$8.00
39Prefabricated PM type C (W)(arrow) (668-7091)EACH155$200.00$215.00$225.00$225.00$200.00
40Prefabricated PM type C (W)(double arrow) (668-7093)EACH250$300.00$300.00$275.00$325.00$260.00
41Prefabricated PM type C (W)(TPL arrow) (668-7095)EACH1$500.00$334.00$350.00$500.00$340.00
42Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH10$300.00$323.00$250.00$400.00$275.00
43Prefabricated PM type C (W)(number) (668-7102)EACH10$200.00$192.00$120.00$150.00$205.00
44Prefabricated PM type C (W)(word) (668-7103)EACH75$250.00$285.00$250.00$300.00$240.00
45Prefabricated PM type C (W)(RR crossing) (668-7108)EACH5$500.00$638.00$500.00$650.00$600.00
46Prefabricated PM type C (W)(symbol) (668-7109)EACH5$500.00$56.00$125.00$725.00$260.00
47Prefabricated PM type C (W)(18")(yld tri) (668-7110)EACH5$75.00$39.00$50.00$35.00$20.00
48Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH5$100.00$48.00$50.00$50.00$25.00
49Prefabricated PM type C (W)(bike arrow) (668-7113)EACH20$125.00$130.00$120.00$110.00$100.00
50Prefabricated PM type C (W)(bike symbol) (668-7115)EACH20$250.00$180.00$120.00$175.00$200.00
51Prefabricated PM type C (W)(bike word) (668-7116)EACH20$125.00$185.00$120.00$165.00$175.00
52Reflectorized pavement marker type I-C (672-7002)EACH2,000$5.00$4.75$6.00$5.50$5.00
53Reflectorized pavement marker type II-A-A (672-7004)EACH10,000$4.00$4.25$6.00$5.50$5.00
54Reflectorized pavement marker type II-C-R (672-7006)EACH10,000$4.00$4.25$6.00$5.50$5.00
55Eliminating existing PM & markers (6") (677-7002)LF250,000$0.25$0.35$0.25$0.35$0.30
56Eliminating existing PM & markers (8") (677-7004)LF7,900$0.85$0.69$0.60$0.82$0.40
57Eliminating existing PM & markers (12") (677-7006)LF16,000$1.00$1.35$0.85$1.00$1.00
58Eliminating existing PM & markers (24") (677-7008)LF4,500$2.00$3.00$0.92$1.50$2.00
59Eliminating existing PM & markers (arrow) (677-7009)EACH175$4.00$38.00$25.00$55.00$75.00
60Eliminating existing PM & markers (double arrow) (677-7010)EACH30$60.00$54.00$25.00$65.00$85.00
61Eliminating existing PM & markers (TPL arrow) (677-7011)EACH5$50.00$51.00$25.00$65.00$95.00
62Eliminating existing PM & markers (uturn arrow) (677-7012)EACH10$75.00$67.00$25.00$75.00$85.00
63Eliminating existing PM & markers (number) (677-7014)EACH5$40.00$30.00$25.00$50.00$82.00
64Eliminating existing PM & markers (word) (677-7015)EACH75$50.00$45.00$25.00$55.00$85.00
65Eliminating existing PM & markers (entr gore) (677-7016)EACH20$250.00$244.00$25.00$100.00$250.00
66Eliminating existing PM & markers (exit gore) (677-7017)EACH20$250.00$244.00$25.00$200.00$500.00
67Eliminating existing PM & markers (RR crossing) (677-7019)EACH5$185.00$155.00$25.00$350.00$300.00
68Eliminating existing PM & markers (symbol) (677-7020)EACH5$55.00$41.00$25.00$150.00$100.00
69Eliminating existing PM & markers (18")(yld tri) (677-7023)EACH5$30.00$18.00$25.00$35.00$10.00
70Eliminating existing PM & markers (36")(yld tri) (677-7024)EACH5$100.00$25.00$25.00$35.00$15.00
71Eliminating existing PM & marks (bike arrow) (677-7025)EACH20$39.00$35.00$25.00$35.00$50.00
72Eliminating existing PM & marks (bike symbol) (677-7027)EACH20$30.00$35.00$25.00$35.00$50.00
73Eliminating existing PM & marks (bike word) (677-7028)EACH20$39.00$35.00$25.00$35.00$50.00
74Pavement surface preparation for marking (6") (678-7002)LF200,000$0.01$0.03$0.01$0.01$0.01
75Pavement surface preparation for marking (8") (678-7004)LF4,000$0.20$0.40$0.02$0.10$0.02
76Pavement surface preparation for marking (12") (678-7006)LF7,500$0.50$0.50$0.05$0.25$0.03
77Pavement surface preparation for marking (24") (678-7008)LF1,750$0.45$0.75$0.12$0.50$0.06
78Pavement surface preparation for marking (arrow) (678-7009)EACH175$12.00$16.00$10.00$5.00$5.00
79Pavement surface preparation for marking (double arrow) (678-7010)EACH35$10.00$16.00$10.00$5.00$5.00
80Pavement surface preparation for marking (uturn arr) (678-7012)EACH10$15.00$16.00$10.00$5.00$5.00
81Pavement surface preparation for marking (number) (678-7015)EACH5$15.00$10.50$10.00$5.00$5.00
82Pavement surface preparation for marking (word) (678-7016)EACH125$13.50$13.25$10.00$5.00$5.00
83Pavement surface preparation for marking (entr gore) (678-7017)EACH10$65.00$123.00$10.00$25.00$5.00
84Pavement surface preparation for marking (exit gore) (678-7018)EACH10$65.00$123.00$10.00$25.00$5.00
85Pavement surface preparation for marking (RR crossing) (678-7020)EACH5$10.00$47.00$10.00$25.00$5.00
86Pavement surface preparation for marking (symbol) (678-7021)EACH5$16.25$12.20$10.00$25.00$5.00
87Pavement surface preparation for marking (18")(yld tri) (678-7022)EACH5$15.00$4.22$10.00$5.00$5.00
88Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH5$7.00$4.22$10.00$5.00$5.00
89Pavement surface preparation for marking (bike arrow) (678-7026)EACH20$10.00$11.00$10.00$5.00$5.00
90Pavement surface preparation for marking (bike symbol) (678-7028)EACH20$10.00$11.00$10.00$5.00$5.00
91Pavement surface preparation for marking (bike word) (678-7029)EACH20$11.00$11.00$10.00$5.00$5.00
TxDOT contract A00218366: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy