TxDOT contract A00219960 bid tabulation
PAVEMENT MARKINGS, IH0069 (Main St to Bennington). Let by Texas DOT on April 14, 2026, Harris, Houston District. 3 bids received; low bid $687,170 by Batterson, LLP, -22% against the engineer's estimate of $879,642.
- Owner
- Texas DOT
- Letting
- 14 APR 2026
- Pay items
- 41
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Batterson, LLP | $687,170 | Low | -22% |
| 2 | Stripe Lines, Inc. | $760,711 | +11% | -14% |
| 3 | TRP Infrastructure Services, LLC | $968,341 | +41% | +10% |
Engineer's estimate: $879,642.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Batterson, LLP | 2. Stripe Lines, Inc. | 3. TRP Infrastructure Services, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Mobilization (500-7001) | LS | 1 | $87,398 | $5,000.00 | $10,000 | $65,000 |
| 2 | Barricades, signs and traffic handling (502-7001) | MO | 1 | $45,000 | $1,500.00 | $85,000 | $85,000 |
| 3 | Portable changeable message sign (503-7001) | DAY | 30 | $149.56 | $150.00 | $150.00 | $50.00 |
| 4 | TMA (mobile operation) (505-7003) | DAY | 120 | $500.00 | $10.00 | $12.00 | $1.00 |
| 5 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 18 | $426.94 | $365.00 | $181.10 | $740.00 |
| 6 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 18 | $426.94 | $575.00 | $190.21 | $917.00 |
| 7 | Reflectorized pavement marking type III (W)(12")(solid) (666-7242) | LF | 9,000 | $3.00 | $2.00 | $7.75 | $4.25 |
| 8 | Reflectorized pavement marking type III (BLK)(6")(shadow) (666-7262) | LF | 85,500 | $0.61 | $0.85 | $0.71 | $0.65 |
| 9 | Pavement sler (arrow) (666-7353) | EACH | 73 | $20.00 | $15.00 | $42.26 | $23.00 |
| 10 | Pavement sler (word) (666-7354) | EACH | 67 | $20.00 | $15.00 | $43.03 | $30.00 |
| 11 | Pavement sler (double arrow) (666-7356) | EACH | 45 | $25.00 | $25.00 | $44.44 | $35.00 |
| 12 | Pavement sler (symbol) (666-7363) | EACH | 89 | $30.00 | $45.00 | $41.07 | $145.00 |
| 13 | Pavement sler (number) (666-7367) | EACH | 18 | $18.00 | $25.00 | $38.86 | $15.00 |
| 14 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 1,800 | $20.00 | $6.00 | $9.28 | $8.35 |
| 15 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 67 | $201.84 | $458.00 | $176.70 | $190.00 |
| 16 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 45 | $318.00 | $775.00 | $278.13 | $315.00 |
| 17 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 6 | $300.00 | $885.00 | $300.00 | $327.00 |
| 18 | Prefabricated PM type C (W)(number) (668-7102) | EACH | 18 | $223.51 | $245.00 | $78.63 | $268.00 |
| 19 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 67 | $290.90 | $508.00 | $231.37 | $285.00 |
| 20 | Prefabricated PM type C (multi)(shield) (668-7135) | EACH | 89 | $2,890.36 | $2,500.00 | $1,984.69 | $3,850.00 |
| 21 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 6,425 | $5.38 | $5.50 | $4.75 | $10.00 |
| 22 | Eliminating existing PM & markers (12") (677-7006) | LF | 9,000 | $1.08 | $1.50 | $0.85 | $1.45 |
| 23 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 67 | $42.89 | $45.00 | $57.00 | $40.00 |
| 24 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 45 | $48.00 | $45.00 | $83.00 | $50.00 |
| 25 | Eliminating existing PM & markers (number) (677-7014) | EACH | 18 | $40.43 | $45.00 | $35.00 | $35.00 |
| 26 | Eliminating existing PM & markers (word) (677-7015) | EACH | 67 | $47.62 | $45.00 | $57.00 | $40.00 |
| 27 | Eliminating existing PM & markers (entr gore) (677-7016) | EACH | 18 | $107.25 | $150.00 | $100.00 | $250.00 |
| 28 | Eliminating existing PM & markers (exit gore) (677-7017) | EACH | 18 | $85.28 | $300.00 | $100.00 | $325.00 |
| 29 | Eliminating existing PM & markers (shield) (677-7022) | EACH | 89 | $115.39 | $120.00 | $619.00 | $250.00 |
| 30 | Pavement surface preparation for marking (12") (678-7006) | LF | 9,000 | $0.61 | $0.05 | $0.25 | $0.25 |
| 31 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 67 | $10.08 | $5.00 | $19.51 | $10.00 |
| 32 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 45 | $15.61 | $5.00 | $19.51 | $15.00 |
| 33 | Pavement surface preparation for marking (number) (678-7015) | EACH | 18 | $32.76 | $5.00 | $17.92 | $15.00 |
| 34 | Pavement surface preparation for marking (word) (678-7016) | EACH | 67 | $13.32 | $5.00 | $19.51 | $13.50 |
| 35 | Pavement surface preparation for marking (entr gore) (678-7017) | EACH | 18 | $35.93 | $25.00 | $25.00 | $125.00 |
| 36 | Pavement surface preparation for marking (exit gore) (678-7018) | EACH | 18 | $37.73 | $25.00 | $25.00 | $150.00 |
| 37 | Pavement surface preparation for marking (shield) (678-7025) | EACH | 89 | $34.50 | $25.00 | $25.00 | $45.00 |
| 38 | Mltply PV MK W/wty (W) (6") (solid) (6065-7001) | LF | 56,250 | $0.84 | $0.63 | $0.78 | $0.65 |
| 39 | Mltply PV MK W/wty (W) (6") (broken) (6065-7002) | LF | 85,500 | $0.85 | $0.72 | $0.78 | $0.65 |
| 40 | Mltply PV MK W/wty (W) (6") (DOT) (6065-7003) | LF | 1,800 | $0.85 | $2.00 | $0.78 | $2.00 |
| 41 | Mltply PV MK W/wty (Y) (6") (solid) (6065-7004) | LF | 56,250 | $0.60 | $0.63 | $0.78 | $0.65 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 14, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.