TxDOT contract A00221431 bid tabulation

SPECIALTY MARKINGS, US0059 (Various Locations to District Wide). Let by Texas DOT on July 8, 2026, Angelina, Lufkin District. 1 bid received; low bid $201,805 by Stripe-A-Zone, LLC, -4.9% against the engineer's estimate of $212,150.

Owner
Texas DOT
Letting
08 JUL 2026
Pay items
20
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Stripe-A-Zone, LLC$201,805Low-5.0%
TxDOT contract A00221431: bids by rank

Engineer's estimate: $212,150.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Stripe-A-Zone, LLC
1Mobilization (callout) (500-7002)EACH3$3,000.00$5,000.00
2TMA (mobile operation) (505-7003)DAY80$200.00$1.00
3PRFB rumble strip (BLK)(4')(transverse) (668-7001)LF3,000$12.00$7.00
4Prefabricated PM type C (W)(18")(solid) (668-7088)LF1,000$10.00$9.00
5Prefabricated PM type C (W)(24")(solid) (668-7089)LF7,000$12.50$13.50
6Prefabricated PM type C (W)(arrow) (668-7091)EACH50$250.00$300.00
7Prefabricated PM type C (W)(double arrow) (668-7093)EACH20$300.00$400.00
8Prefabricated PM type C (W)(TPL arrow) (668-7095)EACH5$400.00$425.00
9Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH10$400.00$350.00
10Prefabricated PM type C (W)(LN reduct arrow) (668-7100)EACH10$425.00$500.00
11Prefabricated PM type C (W)(word) (668-7103)EACH30$275.00$360.00
12Prefabricated PM type C (W)(RR crossing) (668-7108)EACH10$450.00$650.00
13Eliminating existing PM & markers (18") (677-7007)LF700$1.25$1.00
14Eliminating existing PM & markers (24") (677-7008)LF4,000$1.50$1.50
15Eliminating existing PM & markers (arrow) (677-7009)EACH35$40.00$40.00
16Eliminating existing PM & markers (double arrow) (677-7010)EACH20$55.00$40.00
17Eliminating existing PM & markers (TPL arrow) (677-7011)EACH5$60.00$40.00
18Eliminating existing PM & markers (uturn arrow) (677-7012)EACH5$55.00$40.00
19Eliminating existing PM & markers (word) (677-7015)EACH20$50.00$40.00
20Eliminating existing PM & markers (RR crossing) (677-7019)EACH8$150.00$150.00
TxDOT contract A00221431: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy