TxDOT contract A00223224 bid tabulation
TRAFFIC SIGNAL MAINTENANCE, US0059 (Various Locations to District Wide). Let by Texas DOT on October 8, 2026, Angelina, Lufkin District. 3 bids received; low bid $269,625 by Select Maintenance, L.L.C., -4.5% against the engineer's estimate of $282,380.
- Owner
- Texas DOT
- Letting
- 08 OCT 2026
- Pay items
- 41
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Select Maintenance, L.L.C. | $269,625 | Low | -5.0% |
| 2 | Third Coast Services LLC | $363,318 | +35% | +29% |
| 3 | Traf-Tex, Inc. | $373,536 | +39% | +32% |
Engineer's estimate: $282,380.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Select Maintenance, L.L.C. | 2. Third Coast Services LLC | 3. Traf-Tex, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Mobilization (callout) (500-7002) | EACH | 6 | $500.00 | $3,100.00 | $1,504.36 | $775.00 |
| 2 | TMA (stationary) (505-7001) | DAY | 20 | $300.00 | $245.00 | $419.17 | $300.00 |
| 3 | Concrete sidewalks (4") (531-7001) | SY | 20 | $200.00 | $90.00 | $254.51 | $163.00 |
| 4 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 150 | $20.00 | $19.00 | $16.81 | $19.95 |
| 5 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 300 | $29.00 | $19.00 | $24.05 | $26.10 |
| 6 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 150 | $30.00 | $19.00 | $21.00 | $53.80 |
| 7 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 300 | $35.00 | $19.00 | $31.87 | $59.15 |
| 8 | Electrical conductor (no.8) bare (620-7007) | LF | 1,500 | $1.40 | $2.00 | $1.69 | $2.00 |
| 9 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,000 | $1.40 | $2.10 | $1.87 | $2.25 |
| 10 | Electrical conductor (no.6) insulated (620-7010) | LF | 300 | $2.50 | $2.50 | $2.39 | $2.80 |
| 11 | Ground box type D (162922)W/apron (624-7008) | EACH | 3 | $1,700.00 | $2,250.00 | $1,488.79 | $1,340.00 |
| 12 | Remove electrical services (628-7002) | EACH | 5 | $850.00 | $260.00 | $722.09 | $845.00 |
| 13 | Elc SRV type D 120/240 070(NS)SS(E)SP(O) (628-7191) | EACH | 3 | $9,000.00 | $8,500.00 | $10,845 | $8,650.00 |
| 14 | Elc SRV type T 120/240 000(NS)GS(N)TP(O) (628-7328) | EACH | 3 | $5,000.00 | $3,500.00 | $7,614.12 | $4,925.00 |
| 15 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 10 | $750.00 | $550.00 | $765.59 | $722.00 |
| 16 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 15 | $200.00 | $190.00 | $310.16 | $184.00 |
| 17 | Backplate W/reflectorized border(5 sec) (682-7038) | EACH | 15 | $250.00 | $200.00 | $320.49 | $204.00 |
| 18 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 30 | $180.00 | $185.00 | $279.18 | $170.00 |
| 19 | Traffic signal CBL (type A)(14 AWG)(2 conductor) (684-7028) | LF | 2,000 | $1.45 | $2.00 | $1.68 | $1.90 |
| 20 | Traffic signal CBL (type A)(14 AWG)(3 conductor) (684-7029) | LF | 1,000 | $1.75 | $2.00 | $1.90 | $2.10 |
| 21 | Traffic signal CBL (type A)(14 AWG)(4 conductor) (684-7030) | LF | 2,000 | $2.75 | $3.25 | $2.17 | $2.40 |
| 22 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 1,000 | $3.48 | $3.25 | $2.98 | $3.40 |
| 23 | Install RDSD flash beacon assembly (685-7001) | EACH | 1 | $5,000.00 | $6,350.00 | $7,855.60 | $6,289.00 |
| 24 | Ins traffic signal PL AM (S)STR(type B)lum (686-7008) | EACH | 2 | $9,000.00 | $9,000.00 | $10,142 | $8,975.00 |
| 25 | Removal of ground boxes (690-7006) | EACH | 5 | $300.00 | $250.00 | $144.86 | $838.00 |
| 26 | Install of span cable assembly (690-7018) | LF | 500 | $9.90 | $3.50 | $4.41 | $4.30 |
| 27 | Replace of signal head assembly (690-7025) | EACH | 50 | $500.00 | $277.00 | $1,336.55 | $1,371.00 |
| 28 | Replace of pedestrian push buttons (690-7031) | EACH | 8 | $700.00 | $130.00 | $1,720.84 | $1,458.00 |
| 29 | Install of FND for ground MNT cabinets (690-7036) | EACH | 2 | $3,000.00 | $2,200.00 | $4,109.23 | $3,573.00 |
| 30 | Replace of control cabinet(pole MNT) (690-7042) | EACH | 1 | $2,000.00 | $1,800.00 | $3,610.46 | $20,361 |
| 31 | Install of flasher cabinet (690-7046) | EACH | 1 | $2,500.00 | $2,700.00 | $1,805.25 | $1,868.00 |
| 32 | Replace of signal pole assembly (690-7052) | EACH | 2 | $3,800.00 | $14,000 | $902.63 | $2,067.00 |
| 33 | Removal of concrete foundations (690-7063) | EACH | 3 | $700.00 | $500.00 | $902.62 | $2,130.00 |
| 34 | Ins of traffic signal PL FND (30" dril SHFT) (690-7071) | LF | 33 | $400.00 | $335.00 | $339.97 | $334.00 |
| 35 | Ins of traffic signal PL FND (36" dril SHFT) (690-7072) | LF | 30 | $500.00 | $405.00 | $363.91 | $418.00 |
| 36 | Install pedestrian pole assembly (690-7087) | EACH | 3 | $2,000.00 | $1,750.00 | $3,368.40 | $3,768.00 |
| 37 | VIVDS cable (install) (690-7137) | LF | 1,500 | $2.00 | $2.02 | $4.02 | $4.00 |
| 38 | Replace bbu battery (690-7141) | EACH | 6 | $2,100.00 | $1,900.00 | $795.87 | $718.00 |
| 39 | Replace breakaway fuse holder (690-7220) | EACH | 50 | $125.00 | $75.00 | $338.05 | $232.00 |
| 40 | Bbu system (external battery cabinet) (6007-7001) | EACH | 2 | $7,500.00 | $7,600.00 | $10,002 | $12,411 |
| 41 | Cat 5 ethernet cable (6055-7001) | LF | 1,000 | $2.50 | $2.20 | $1.96 | $3.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 8, 2026. Compiled by Mirage Metrics.