TxDOT letting results, September 13, 2023

13 contracts let by Texas DOT on September 13, 2023, $1,986,571 in low bids, a median of 3 bidders per contract. On the 13 with an engineer's estimate, the low bid came in under it 11 times; median low bid -8.0% against the estimate.

Owner
Texas DOT
Contracts
13
Low bids, total
$1,986,571
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
09231815FM2728 Emulsion from KAUFMAN/ROCKWALL to MAINTENANCE SECTIONDallas District3Wright Asphalt Products Company LLC$262,200$264,300+1.0%-2.0%TxDOT
09231807IH0030 Aggregate from DALLAS COUNTY to MAINTENANCE SECTIONDallas District1Arcosa LWS, LLC$254,000-8.0%TxDOT
09231822IH0030 Winter weather material from VARIOUS LOCATIONS IN to DALLAS COUNTYDallas District3NSG Logistics, LLC$246,819$257,401+4.0%-14%TxDOT
09231808FM2728 Limestone rock asphalt from KAUFMAN/ROCKWALL to MAINTENANCE SECTIONDallas District2Vulcan Construction Materials, LLC$244,668$252,270+3.0%-4.0%TxDOT
09231806IH0030 Winter weather material from VARIOUS LOCATIONS IN to DALLAS COUNTYDallas District3United Salt Corporation$241,835$291,346+20%-14%TxDOT
09231814FM2728 Rock/riprap from KAUFMAN/ROCKWALL to MAINTENANCE SECTIONDallas District4Touchstone Resources, LLC$152,500$160,320+5.0%-11%TxDOT
09231817IH0035 Raised pavement markings from VARIOUS ROADWAYS IN DENTON to DENTON COUNTY MAINTENANCE SECTIONDallas District3Greenpak Solutions, Limited Liability Company$142,891$157,971+11%-14%TxDOT
09231810SH0031 Winter weather material from NAVARRO to MAINTENANCE SECTIONDallas District3United Salt Corporation$102,784$105,468+3.0%-13%TxDOT
09231809FM0876 Winter weather material from ELLIS to MAINTENANCE SECTIONDallas District3United Salt Corporation$93,759$105,090+12%-8.0%TxDOT
09231813FM2728 Asphaltic patching material from KAUFMAN/ROCKWALL to MAINTENANCE SECTIONDallas District1Waller County Asphalt Inc.$79,7760.0%TxDOT
09231821SH0031 Hydraulic cement from NAVARRO to NAVARRO COUNTY MAINTENANCE SECTIONDallas District4Touchstone Resources, LLC$71,500$76,313+7.0%-5.0%TxDOT
09231820SH0005 Winter weather material from COLLIN COUNTY to MAINTENANCE SECTIONDallas District3The Bargain Source$66,840$66,9960.0%-11%TxDOT
09231811SH0005 Rock/riprap from COLLIN COUNTY to MAINTENANCE SECTIONDallas District3Touchstone Resources, LLC$27,000$30,000+11%+50%TxDOT
TxDOT contracts let on September 13, 2023, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy