TxDOT letting results, November 26, 2024

10 contracts let by Texas DOT on November 26, 2024, $3,841,470 in low bids, a median of 2 bidders per contract. On the 10 with an engineer's estimate, the low bid came in under it 9 times; median low bid -19% against the estimate.

Owner
Texas DOT
Contracts
10
Low bids, total
$3,841,470
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
A00212785EMULSION, US0377 (VARIOUS to VARIOUS)Brownwood District2Wright Asphalt Products Company LLC$889,200$1,155,200+30%-4.0%TxDOT
A00212221TRAFFIC CONTROL SERVICES, US0290 (Various Highways in Waller County to Various Highways in Waller County)Houston District4Rhino Equity, LLC$567,100$713,250+26%-11%TxDOT
A00212529WINTER WEATHER MATERIAL, SH0118 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)El Paso District2NSG Logistics, LLC$420,329$871,882+107%-10%TxDOT
A00212174TRAFFIC CONTROL SERVICES, IH0020 (Various locations in the to Abilene Area)Abilene District2Awp Safety$418,500$582,801+39%-20%TxDOT
A00212175TRAFFIC CONTROL SERVICES, IH0020 (Various locations in the to Big Spring Area)Abilene District2Awp Safety$410,935$472,151+15%-27%TxDOT
A00207983FULL DEPTH CONCRETE REPAIR, SH0249 (0.20 miles South of Holderrieth Rd to .25 miles South of Holderrieth Rd)Houston District4Forde Construction Company, Inc.$345,227$447,887+30%-40%TxDOT
A00212239CLEANING AND SWEEPING HIGHWAYS, US0290 (Various Highways in Waller County to Various Highways in Waller County)Houston District4T & M Lawn-Fence Service, LLC$289,714$314,000+8.0%-20%TxDOT
A00212422TREE TRIMMING AND BRUSH REMOVAL, IH0020 (Various locations in to the Abilene District)Abilene District5S Fowler Services LLC$231,515$242,344+5.0%-27%TxDOT
A00212375ASPHALTIC PATCHING MATERIAL, US0054 (Various Locations to Various Locations)El Paso District1Touchstone Resources, LLC$189,750+10%TxDOT
A00212946EMULSION, US0190 (VARIOUS to VARIOUS)Brownwood District1Wright Asphalt Products Company LLC$79,200-18%TxDOT
TxDOT contracts let on November 26, 2024, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy