TxDOT letting results, January 28, 2025

9 contracts let by Texas DOT on January 28, 2025, $5,163,207 in low bids, a median of 2 bidders per contract. On the 8 with an engineer's estimate, the low bid came in under it 5 times; median low bid -1.0% against the estimate.

Owner
Texas DOT
Contracts
9
Low bids, total
$5,163,207
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
A00213200EMULSION, IH0010 (Various locations throughout to San Antonio District)San Antonio District1Ergon Asphalt & Emulsions, Inc.$765,400+8.0%TxDOT
A00213208LIMESTONE ROCK ASPHALT, US0181 (Various locations throughout Floresville to Maintenance Section)San Antonio District2Vulcan Construction Materials, LLC$747,885$781,541+5.0%-5.0%TxDOT
A00213204LIMESTONE ROCK ASPHALT, US0090 (Various locations throughout Uvalde to Maintenance Section)San Antonio District2Vulcan Construction Materials, LLC$716,967$734,598+2.0%+3.0%TxDOT
A00213207HOT MIX, IH0010 (Various locations in West Bexar to Maintenance Section)San Antonio District4Texas Materials Group, Inc.$660,800$756,400+14%-6.0%TxDOT
A00213210LIMESTONE ROCK ASPHALT, IH0035 (Various locations in Pearsall and Tilden to Maintenance Sections)San Antonio District2Vulcan Construction Materials, LLC$624,570$634,990+2.0%-2.0%TxDOT
A00213209LIMESTONE ROCK ASPHALT, IH0010 (Various locations throughout Kerrville to Maintenance Section)San Antonio District2Vulcan Construction Materials, LLC$615,540$629,300+2.0%-1.0%TxDOT
A00213206LIMESTONE ROCK ASPHALT, IH0035 (Various locations throughout Hondo to Maintenance Section)San Antonio District2Vulcan Construction Materials, LLC$490,320$508,740+4.0%0.0%TxDOT
A00213205HOT MIX, IH0010 (Various locations throughout Seguin to Maintenance Section)San Antonio District4Texas Materials Group, Inc.$301,000$304,000+1.0%-8.0%TxDOT
A00213378SWEEPING AND DEBRIS REMOVAL, US0087 (VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS)Amarillo District1E.V.G. Enterprise$240,725TxDOT
TxDOT contracts let on January 28, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.