TxDOT letting results, February 4, 2025
9 contracts let by Texas DOT on February 4, 2025, $6,489,937 in low bids, a median of 3 bidders per contract. On the 9 with an engineer's estimate, the low bid came in under it 6 times; median low bid -5.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 9
- Low bids, total
- $6,489,937
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00213307 | MOWING HIGHWAY RIGHT OF WAY, IH0010 (Various locations throughout Kerrville to Maintenance Section) | San Antonio District | 2 | USA DT Services, Inc. | $969,563 | $973,820 | 0.0% | +19% | TxDOT |
| A00213424 | MOWING HIGHWAY RIGHT OF WAY, US0090 (Various locations throughout Hondo to Maintenance Section) | San Antonio District | 3 | R&M Incorporated | $846,635 | $860,675 | +2.0% | -10% | TxDOT |
| A00213308 | MOWING HIGHWAY RIGHT OF WAY, IH0010 (Various locations throughout Boerne to Maintenance Section) | San Antonio District | 2 | R&M Incorporated | $806,187 | $855,023 | +6.0% | +20% | TxDOT |
| A00213681 | HOT MIX, IH0035 (Various locations in New Braunfels to Maintenance Section) | San Antonio District | 5 | Texas Materials Group, Inc. | $781,000 | $880,000 | +13% | -9.0% | TxDOT |
| A00213676 | AGGREGATE, IH0010 (Various locations throughout to San Antonio District) | San Antonio District | 4 | Vulcan Construction Materials, LLC | $763,932 | $767,140 | 0.0% | -5.0% | TxDOT |
| A00213411 | MOWING HIGHWAY RIGHT OF WAY, US0090 (Various locations throughout Uvalde to Maintenance Section) | San Antonio District | 4 | BK Field Operations LLC | $609,785 | $630,548 | +3.0% | -23% | TxDOT |
| A00213678 | LIMESTONE ROCK ASPHALT, IH0010 (Various locations throughout Boerne to Maintenance Section) | San Antonio District | 2 | Vulcan Construction Materials, LLC | $600,884 | $630,243 | +5.0% | -4.0% | TxDOT |
| A00213680 | HOT MIX, IH0010 (Various locations throughout East Bexar to Maintenance Section) | San Antonio District | 5 | Texas Materials Group, Inc. | $580,720 | $638,365 | +10% | -17% | TxDOT |
| A00213306 | MOWING HIGHWAY RIGHT OF WAY, SH0016 (Various locations throughout Bandera to Maintenance Section) | San Antonio District | 3 | USA DT Services, Inc. | $531,230 | $562,870 | +6.0% | +3.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.