TxDOT letting results, February 4, 2025

9 contracts let by Texas DOT on February 4, 2025, $6,489,937 in low bids, a median of 3 bidders per contract. On the 9 with an engineer's estimate, the low bid came in under it 6 times; median low bid -5.0% against the estimate.

Owner
Texas DOT
Contracts
9
Low bids, total
$6,489,937
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
A00213307MOWING HIGHWAY RIGHT OF WAY, IH0010 (Various locations throughout Kerrville to Maintenance Section)San Antonio District2USA DT Services, Inc.$969,563$973,8200.0%+19%TxDOT
A00213424MOWING HIGHWAY RIGHT OF WAY, US0090 (Various locations throughout Hondo to Maintenance Section)San Antonio District3R&M Incorporated$846,635$860,675+2.0%-10%TxDOT
A00213308MOWING HIGHWAY RIGHT OF WAY, IH0010 (Various locations throughout Boerne to Maintenance Section)San Antonio District2R&M Incorporated$806,187$855,023+6.0%+20%TxDOT
A00213681HOT MIX, IH0035 (Various locations in New Braunfels to Maintenance Section)San Antonio District5Texas Materials Group, Inc.$781,000$880,000+13%-9.0%TxDOT
A00213676AGGREGATE, IH0010 (Various locations throughout to San Antonio District)San Antonio District4Vulcan Construction Materials, LLC$763,932$767,1400.0%-5.0%TxDOT
A00213411MOWING HIGHWAY RIGHT OF WAY, US0090 (Various locations throughout Uvalde to Maintenance Section)San Antonio District4BK Field Operations LLC$609,785$630,548+3.0%-23%TxDOT
A00213678LIMESTONE ROCK ASPHALT, IH0010 (Various locations throughout Boerne to Maintenance Section)San Antonio District2Vulcan Construction Materials, LLC$600,884$630,243+5.0%-4.0%TxDOT
A00213680HOT MIX, IH0010 (Various locations throughout East Bexar to Maintenance Section)San Antonio District5Texas Materials Group, Inc.$580,720$638,365+10%-17%TxDOT
A00213306MOWING HIGHWAY RIGHT OF WAY, SH0016 (Various locations throughout Bandera to Maintenance Section)San Antonio District3USA DT Services, Inc.$531,230$562,870+6.0%+3.0%TxDOT
TxDOT contracts let on February 4, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy