TxDOT letting results, July 15, 2025
9 contracts let by Texas DOT on July 15, 2025, $4,011,405 in low bids, a median of 4 bidders per contract. On the 9 with an engineer's estimate, the low bid came in under it 5 times; median low bid -2.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 9
- Low bids, total
- $4,011,405
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00215084 | CONCRETE STRUCTURE REPAIR, US0059 (Various Highways in Fort Bend County to Various Highways in Fort Bend County) | Houston District | 2 | Isi Contracting, Inc. | $1,130,160 | $1,335,000 | +18% | +73% | TxDOT |
| A00216384 | MOWING HIGHWAY RIGHT OF WAY, IH0037 (VARIOUS to .) | Corpus Christi District | 4 | R&M Incorporated | $503,440 | $507,946 | +1.0% | -13% | TxDOT |
| A00216076 | AGGREGATE, US0181 (VARIOUS to .) | Corpus Christi District | 4 | Brauntex Materials, Inc. | $480,500 | $482,812 | 0.0% | -2.0% | TxDOT |
| A00214396 | REFLECTORIZED PAVEMENT MARKINGS & MARKERS, US0290 (VARIOUS HWYS IN WALLER COUNTY to VARIOUS HWYS IN WALLER COUNTY) | Houston District | 4 | The Confidence Group, Inc | $480,471 | $480,925 | 0.0% | -25% | TxDOT |
| A00216078 | FLEXIBLE BASE, US0181 (VARIOUS to .) | Corpus Christi District | 4 | Martin Marietta Materials, Inc. | $337,195 | $357,000 | +6.0% | -25% | TxDOT |
| A00214429 | CRACK SEAL, SH0123 (Various to Locations) | Corpus Christi District | 3 | D & M Contractors, LLC | $333,539 | $345,530 | +4.0% | +22% | TxDOT |
| A00214427 | CRACK SEAL, US0281 (Various to Locations) | Corpus Christi District | 3 | Fyl Enterprises, LLC | $312,800 | $348,696 | +11% | +10% | TxDOT |
| A00216077 | HOT-MIX COLD-LAID, US0181 (VARIOUS to .) | Corpus Christi District | 3 | Brauntex Materials, Inc. | $279,000 | $282,182 | +1.0% | 0.0% | TxDOT |
| A00216088 | FLEXIBLE BASE, US0181 (VARIOUS to .) | Corpus Christi District | 5 | Colorado Materials, LTD. | $154,300 | $157,000 | +2.0% | -6.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.