TxDOT letting results, August 12, 2025
14 contracts let by Texas DOT on August 12, 2025, $5,065,396 in low bids, a median of 3 bidders per contract. On the 14 with an engineer's estimate, the low bid came in under it 10 times; median low bid -18% against the estimate.
- Owner
- Texas DOT
- Contracts
- 14
- Low bids, total
- $5,065,396
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00217061 | HOT MIX, US0083 (VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS) | Amarillo District | 1 | Big Creek Sand & Gravel, Inc. | $614,500 | -2.0% | TxDOT | ||
| A00215308 | BASE REPAIR WITH SEAL COAT AND/OR OVERLAY, US 69 (Villa Rd to Campus St) | Beaumont District | 2 | Texas Materials Group, Inc. | $556,092 | $566,576 | +2.0% | +44% | TxDOT |
| A00215086 | REFLECTIVE PAVEMENT MARKINGS (LONG LINE), US 59 (Various Locations to Various Locations) | Houston District | 3 | Stripe Lines, Inc. | $535,400 | $691,100 | +29% | -44% | TxDOT |
| A00217092 | BRIDGE REPAIR, IH0010 (VARIOUS to VARIOUS) | Odessa District | 2 | Premier Contractors LLC | $520,679 | $659,875 | +27% | -24% | TxDOT |
| A00215119 | BRIDGE PREVENTATIVE MAINTENANCE, SH 225 (Bearle St to Bearle St) | Houston District | 6 | Premier Contractors LLC | $483,400 | $550,356 | +14% | +13% | TxDOT |
| A00210519 | WINTER WEATHER MATERIAL, SH0036 (Various to Various) | Bryan District | 1 | Touchstone Resources, LLC | $438,000 | +47% | TxDOT | ||
| A00216954 | SNOW AND ICE CONTROL, IH0027 (VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS) | Amarillo District | 2 | NSG Logistics, LLC | $374,785 | $450,000 | +20% | -6.0% | TxDOT |
| A00216062 | BRIDGE JOINT CLEANING AND SEALING, SH0031 (Various Bridges in to the Tyler District) | Tyler District | 8 | Scout 5 Construction LLC | $334,371 | $358,994 | +7.0% | -22% | TxDOT |
| A00215134 | BRIDGE PREVENTATIVE MAINTENANCE, SL0008 (SL 8 at Harwin Dr. to -Harwin Dr. at SL 8) | Houston District | 6 | Structural Integrity Group LLC | $280,600 | $280,889 | 0.0% | -32% | TxDOT |
| A00216171 | CRACK SEAL, US0385 (VARIOUS to VARIOUS) | Odessa District | 4 | Greenpak Solutions, Limited Liability Company | $274,434 | $303,302 | +11% | -16% | TxDOT |
| A00208005 | BRIDGE PREVENTATIVE MAINTENANCE, IH0045 (Richey Rd to Richey Rd) | Houston District | 6 | Premier Contractors LLC | $249,972 | $305,107 | +22% | -27% | TxDOT |
| A00217131 | SWEEPING AND DEBRIS REMOVAL, US0087 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 3 | J-Men Concrete Construction | $226,225 | $264,230 | +17% | -21% | TxDOT |
| A00216677 | ASPHALTIC PATCHING MATERIAL, SH0006 (Various to Various) | Bryan District | 3 | Waller County Asphalt Inc. | $136,752 | $150,000 | +10% | +5.0% | TxDOT |
| A00213922 | REFLECTORIZED PAVEMENT MARKINGS & MARKERS, US0084 (Various locations to in the Waco District) | Waco District | 4 | Stripe-A-Zone, LLC | $40,187 | $43,848 | +9.0% | -23% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.