TxDOT letting results, November 18, 2025
2 contracts let by Texas DOT on November 18, 2025, $432,394 in low bids, a median of 1.5 bidders per contract. On the 2 with an engineer's estimate, the low bid came in under it 2 times; median low bid -13% against the estimate.
- Owner
- Texas DOT
- Contracts
- 2
- Low bids, total
- $432,394
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00218136 | MOWING HIGHWAY RIGHT OF WAY, US0277 (Various to Various) | Laredo District | 2 | Abescape Group LLC | $241,954 | $248,712 | +3.0% | -18% | TxDOT |
| A00216675 | PAINT AND BEADS, US0083 (District Headquarters to District Headquarters) | Abilene District | 1 | Ennis-Flint, Inc. | $190,440 | -8.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.