TxDOT letting results, January 15, 2026

10 contracts let by Texas DOT on January 15, 2026, $3,046,941 in low bids, a median of 6.5 bidders per contract. On the 10 with an engineer's estimate, the low bid came in under it 9 times; median low bid -15% against the estimate.

Owner
Texas DOT
Contracts
10
Low bids, total
$3,046,941
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
A00219130BRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans)Childress District11Blacksmith Ventures LLC$576,246$636,381+10%-35%TxDOT
A00218339MOWING HIGHWAY RIGHT OF WAY, SH0056 (Various Roadways in to Fannin County)Paris District5Abescape Group LLC$380,479$394,132+4.0%-5.0%TxDOT
A00218389BRIDGE PREVENTATIVE MAINTENANCE, US0377 (VARIOUS LOCATIONS IN THE SAN ANGELO DIST to VARIOUS LOCATIONS IN THE SAN ANGELO DIST)San Angelo District10MPB, Inc.$365,527$380,404+4.0%-33%TxDOT
A00218340MOWING HIGHWAY RIGHT OF WAY, US0069 (Various Roadways in to Grayson County)Paris District7Anthony Services$346,572$354,028+2.0%-9.0%TxDOT
A00218131TRAFFIC CONTROL SERVICES, IH0020 (Various Locations to in the Abilene District)Abilene District2Barricades Unlimited$324,596$397,426+22%-22%TxDOT
A00218338MOWING HIGHWAY RIGHT OF WAY, US0082 (Various Roadways in to Red River County)Paris District6JLB Contracting LLC$304,809$311,604+2.0%-7.0%TxDOT
A00218640AGGREGATE, US0287 (Districtwide to Districtwide)Childress District1Volcanic Stone Co.$250,464+8.0%TxDOT
A00218135TRAFFIC CONTROL SERVICES, IH0020 (Various Locations to in the Abilene District)Abilene District2Awp Safety$222,761$243,971+10%-10%TxDOT
A00218284TREE TRIMMING, FM0121 (Various locations in to Grayson and Fannin County)Paris District8Rear Contractors LLC$191,462$222,440+16%-19%TxDOT
A00218283TREE REMOVAL, US0082 (Various locations in to Grayson and Fannin County)Paris District11Catocon, Inc.$84,025$88,080+5.0%-33%TxDOT
TxDOT contracts let on January 15, 2026, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy