TxDOT letting results, February 26, 2026

6 contracts let by Texas DOT on February 26, 2026, $2,464,639 in low bids, a median of 4 bidders per contract. On the 6 with an engineer's estimate, the low bid came in under it 6 times; median low bid -22% against the estimate.

Owner
Texas DOT
Contracts
6
Low bids, total
$2,464,639
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
A00218170MOWING HIGHWAY RIGHT OF WAY, US0084 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District4Abescape Group LLC$661,840$669,104+1.0%-15%TxDOT
A00219375MOWING HIGHWAY RIGHT OF WAY, US0062 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District4Bert Whitaker$528,456$642,301+22%-30%TxDOT
A00218171MOWING HIGHWAY RIGHT OF WAY, US0060 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District6MDCS, LLC$488,944$604,069+24%-34%TxDOT
A00218172MOWING HIGHWAY RIGHT OF WAY, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District3Abescape Group LLC$334,231$360,947+8.0%-14%TxDOT
A00219044MOWING HIGHWAY RIGHT OF WAY, US0087 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District6MDCS, LLC$276,820$298,522+8.0%-34%TxDOT
A00218173MOWING HIGHWAY RIGHT OF WAY, SL0289 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District2Abescape Group LLC$174,349$275,604+58%-14%TxDOT
TxDOT contracts let on February 26, 2026, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.