TxDOT letting results, May 26, 2026

4 contracts let by Texas DOT on May 26, 2026, $1,276,346 in low bids, a median of 4 bidders per contract. On the 4 with an engineer's estimate, the low bid came in under it 3 times; median low bid -12% against the estimate.

Owner
Texas DOT
Contracts
4
Low bids, total
$1,276,346
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
A00220136MOWING HIGHWAY RIGHT OF WAY, IH0035 (Various to Various)Laredo District1R&M Incorporated$632,346+19%TxDOT
A00221958ROCK/RIPRAP, US0069 (various to various)Beaumont District4Touchstone Resources, LLC$287,250$304,373+6.0%-15%TxDOT
A00222000ROCK/RIPRAP, SH0062 (various to various)Beaumont District4Touchstone Resources, LLC$211,750$239,693+13%-9.0%TxDOT
A00222037ROCK/RIPRAP, US0090 (various to various)Beaumont District4Touchstone Resources, LLC$145,000$160,353+11%-18%TxDOT
TxDOT contracts let on May 26, 2026, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy