Riprap (stone protection)(24 in) unit price, Texas

Low bidders on TxDOT contracts carried a median of $200.00 per CY for item 432-7045, riprap (stone protection)(24 in), over the 24 months to 19 NOV 2026, across 112 low bids. Half of all 856 bids fell between $190.00 and $281.95.

Owner
Texas DOT
Item
432-7045
Unit
CY
Latest letting
12 NOV 2026
$200.00Low bidder's median, per CY
$225.00Median of all bids, per CY
112Contracts in the window
$221.25Engineer's estimate, median per CY

By year of letting

Riprap (stone protection)(24 in), TxDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
202444$197.8329$275.00
20255959$210.00438$235.00
20265353$185.00418$215.00
Riprap (stone protection)(24 in), TxDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Riprap (stone protection)(24 in), TxDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Fort Worth District19$180.00132$190.00
Austin District10$225.00111$250.00
Tyler District15$200.00108$229.65
Dallas District12$185.0080$203.50
Lufkin District11$208.0078$225.00
Childress District6$210.0049$250.00
Paris District6$192.5049$189.00
Waco District6$192.5049$200.00
Brownwood District5$275.0047$275.00
San Antonio District3$225.0026$222.03
Houston District3$200.0026$275.00
Corpus Christi District3$185.0023$228.75
Riprap (stone protection)(24 in), TxDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Riprap (stone protection)(24 in), TxDOT: low bidder's median by quantity band
Quantity (CY)Low bidsLow-bid median
9 to 18428$241.68
199 to 43728$205.00
451.11 to 1,23928$185.00
1,266 to 31,21228$185.00
Riprap (stone protection)(24 in), TxDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest TxDOT contracts carrying Riprap (stone protection)(24 in)
LetContractDistrictQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
12 NOV 2026A00219681Dallas District1,231$180.00$245.00$200.006ROAD DOCTORS LLCTxDOT
28 OCT 2026A00223651Lufkin District1,490$232.00$228.50$250.008BLACKSMITH VENTURES LLCTxDOT
15 OCT 2026A00223685Paris District340$245.00$300.00$325.001112TWELVE ROAD AND BRIDGE LLCTxDOT
14 OCT 2026A00215965Dallas District143$200.00$297.50$210.006GARRET SHIELDS INFRASTRUCTURETxDOT
07 OCT 2026A00132124Lufkin District3,010$185.00$185.00$180.007LONGVIEW BRIDGE AND ROAD, LTD.TxDOT
07 OCT 2026A00222466Brownwood District100$275.00$275.00$200.009TAYLOR BRIDGE LLCTxDOT
07 OCT 2026A00064192San Antonio District312$45.00$223.60$315.008HUNTER INDUSTRIES, LTD.TxDOT
06 OCT 2026A00220460Brownwood District50$325.00$300.00$200.0011TAYLOR BRIDGE LLCTxDOT
03 SEP 2026A00207389Childress District594$210.00$225.00$210.007COPPELL CONSTRUCTION CO., INC.TxDOT
02 SEP 2026A00195348Paris District1,500$150.00$156.00$150.007HIGHWAY 19 CONSTRUCTION LLCTxDOT
06 AUG 2026A00192187Beaumont District1,239$220.00$222.50$185.006CASTILLO ARANDA LLCTxDOT
06 AUG 2026A00214454Fort Worth District320$180.00$180.00$196.008HODGES AND SON CONSTRUCTION COMPANY, INC.TxDOT
06 AUG 2026A00194392Lufkin District2,246$160.00$180.00$150.006THK CONSTRUCTION LLCTxDOT
05 AUG 2026A00132718Fort Worth District1,266$135.00$160.00$150.008FOUTSCO PAVING COMPANY, LLCTxDOT
05 AUG 2026A00007222Fort Worth District692$120.00$171.71n/a11INDUS ROAD & BRIDGE, INC.TxDOT
Latest TxDOT contracts carrying Riprap (stone protection)(24 in)

Filter this item by your own quantity, district and period, or check your price against it, in the TxDOT explorer.

How these prices were read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are TxDOT's own: this item is compared with TxDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.