VDOT contract C0000120523C01 bid tabulation

Fiber optic communication upgrades. Let by Virginia DOT on November 19, 2025, Prince William, Northern Virginia. 5 bids received; low bid $4,183,854 by Lumin8 Transportation Technologies, LLC.

Owner
Virginia DOT
Letting
19 NOV 2025
Pay items
49
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lumin8 Transportation Technologies, LLC$4,183,854Low
2VSL Electrical, Signing, Lighting LLC$4,378,605+5.0%
3B & B Signal Co., L.L.C.$4,783,684+14%
4Bryant-Ritter Electric Corporation$4,956,518+18%
5Ardent Company, LLC$5,252,500+26%
VDOT contract C0000120523C01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lumin8 Transportation Technologies, LLC2. VSL Electrical, Signing, Lighting LLC3. B & B Signal Co., L.L.C.4. Bryant-Ritter Electric Corporation5. Ardent Company, LLC
0001-0010Clearing and grubbing (301SD20-0001)LS1$25,179$61,108$135,000$50,000$250,000
0001-0020Erosion control mulch (303SD20-0019)SY2,711$1.00$19.50$50.00$7.00$1.00
0001-0030Check dam sediment retention roll 18" (303SD20-0024)EACH2$1,293.00$1,284.75$900.00$400.00$500.00
0001-0040Inlet protection type A (303SD20-0030)EACH2$1,099.00$832.25$900.00$313.00$250.00
0001-0050Inlet protection type B (303SD20-0031)EACH87$582.00$1,209.50$250.00$325.00$250.00
0001-0060Temp. silt fence type A (303SD20-0034)LF15,777$5.80$13.25$25.00$4.00$3.00
0001-0070Utility test pit unpaved (303SX20-0012)EACH166$321.00$751.00$750.00$440.00$400.00
0001-0080Utility test pit asphalt concrete (303SX20-0013)EACH50$744.00$1,435.75$1,750.00$1,125.00$500.00
0001-0090NS BRG. conduit system B609 (419SX20-0008)LS1$174,215$150,000$190,000$167,500$350,000
0001-0100Hydr. cement conc. sidewalk 4" (504SD20-0003)SY28$233.00$251.00$1,165.00$315.00$100.00
0001-0110Salvage EX. guardrail (505SD20-0001)LF50$52.00$62.50$130.00$63.00$55.00
0001-0120Install salv. guardrail (505SD20-0004)LF50$65.00$77.50$200.00$218.00$105.00
0001-0130Guardrail GR-10 (505SD20-0040)LF50$103.00$122.75$330.00$250.00$205.00
0001-0140High visibility fence, 4 feet (507SD20-0027)LF1,500$11.30$16.25$6.50$19.00$2.00
0001-0150NS modify exist. junction box (510SX20-0031)EACH28$602.00$1,705.75$1,380.00$3,125.00$250.00
0001-0160NS modify exist. communication chamber (510SX20-0031)EACH17$512.00$1,875.75$2,750.00$4,066.00$500.00
0001-0170NS remove exist. (fiber optic cable) (510SX20-0039)LF3,190$2.30$4.00$2.00$5.50$2.00
0001-0180NS remove exist. CCTV cabinet (510SX20-0040)EACH3$617.00$2,809.00$1,450.00$6,474.00$250.00
0001-0190NS relocate exist. CCTV equipment (510SX20-0042)EACH3$233.00$3,188.25$2,900.00$7,141.00$250.00
0001-0200Temporary sign (512SD20-0014)SF544$85.00$30.50$150.00$44.00$20.00
0001-0210Truck mounted attenuator (512SD20-0023)HR1,584$261.00$60.75$105.00$62.00$20.00
0001-0220Group 2 channelizing devices (512SD20-0024)DAY894$1.60$8.50$5.00$38.00$0.50
0001-0230Port.changeable mess. sign (512SD20-0025)HR1,584$26.90$16.50$20.00$56.00$5.00
0001-0240Electronic arrow board (512SD20-0026)HR1,584$79.00$12.75$13.50$31.00$2.00
0001-0250Portable temporary rumble strip array (512SP20-0001)DAY30$794.00$2,077.75$850.00$300.00$100.00
0001-0260Mobilization (513SD20-0001)LS1$186,443$125,000$280,000$307,135$2,505,700
0001-0270Construction surveying constr. (517SD20-0001)LS1$19,396$128,153$115,000$93,750$150,000
0001-0280Temporary seed (603SD20-0002)LB200$29.10$33.75$50.00$63.00$2.00
0001-0290Rolled erosion CTRL product EC-3 type 1 (606SD20-0005)SY1,500$11.60$18.75$4.00$6.00$1.00
0001-03008 conductor cable egc (700SD20-0148)LF26,045$1.00$4.75$2.50$4.00$2.50
0001-0310Junction box JB-R2 (700SD20-0176)EACH1$10,461$5,897.50$5,350.00$13,125$2,595.50
0001-0320Junction box JB-S3 (700SD20-0179)EACH67$3,180.00$3,405.25$2,400.00$6,875.00$2,000.00
0001-0330Junction box JB-S4 (700SD20-0180)EACH11$7,091.00$7,607.50$9,100.00$11,250$5,000.00
0001-0340Conduit metal 2" (700SD20-0187)LF325$25.90$82.00$135.00$63.00$20.00
0001-0350Trench excavation eci-1 (700SD20-0197)LF10,845$23.80$59.00$33.00$17.00$15.00
0001-0360NS communication equip. (fiber optic delineator marker) (801SX20-0001)EACH81$213.00$233.75$550.00$938.00$70.00
0001-0370NS communication equip. managed traffic signal field ethernet router (mtsfer) (801SX20-0001)EACH24$17,318$4,456.75$4,000.00$9,951.00$5,500.00
0001-0380NS communication equip. armored fiber optic cable (12 strand) (801SX20-0003)LF2,590$2.60$10.50$2.50$22.00$7.00
0001-0390NS communication equip. armored fiber optic cable (48 strand) (801SX20-0003)LF56,975$2.68$8.50$7.00$7.50$5.00
0001-0400Pre-terminated fiber patch panel (808SD20-0005)EACH20$2,259.00$2,640.25$2,700.00$6,142.00$2,000.00
0001-0410Underground splice enclosure (808SD20-0006)EACH21$1,745.00$3,011.75$5,900.00$4,790.00$2,300.00
0001-0420Fiber distribution center (808SD20-0007)EACH2$3,215.00$3,800.50$10,050$7,128.00$5,000.00
0001-0430MANAGED FIELD ETHERNET SWITCH Gbps (809SD20-0002)EACH7$17,318$2,727.50$2,500.00$9,986.00$2,500.00
0001-0440DIST.SFP MODULE 1Gbps, LC, SHORT HAUL (809SD20-0005)EACH48$781.00$550.25$1,050.00$1,491.00$750.00
0001-0450SFP MODULE 1 Gbps, LC, SHORT HAUL (810SD20-0006)EACH8$781.00$550.25$1,050.00$1,635.00$750.00
0001-0460Bored ITS conduit HDPE 2" (812SD20-0002)LF1,290$31.40$66.00$63.50$63.00$30.00
0001-0470ITS conduit HDPE 2" (812SD20-0007)LF50$28.40$4.75$85.00$93.00$15.00
0001-0480NS bored ITS conduit HDPE (bored innerduct HDPE (type B, 7- way) (27/20MM) (812SX20-0005)LF13,325$65.90$63.00$60.00$62.50$30.00
0001-0490NS ITS conduit HDPE direct-bury innerduct HDPE (type B, 7- way) (27/20MM) (812SX20-0008)LF10,485$41.30$8.00$31.50$45.50$25.00
VDOT contract C0000120523C01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy