VDOT contract C0000128172N01 bid tabulation
On-call guardrail upgrades. Let by Virginia DOT on March 25, 2026, Staunton, Culpeper. 1 bid received; low bid $919,445 by Makco, Incorporated.
- Owner
- Virginia DOT
- Letting
- 25 MAR 2026
- Pay items
- 45
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Makco, Incorporated | $919,445 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Makco, Incorporated |
|---|---|---|---|---|
| 0001-0010 | Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003) | TON | 1,200 | $60.00 |
| 0001-0020 | Machining shoulders (305SP20-0005) | LF | 1,600 | $5.00 |
| 0001-0030 | Railing texas T-6 maint. (410SD20-0032) | LF | 50 | $100.00 |
| 0001-0040 | Guardrail GR-MGS1 (505SD20-0011) | LF | 1,000 | $38.00 |
| 0001-0050 | Guardrail GR-MGS1A (505SD20-0012) | LF | 50 | $48.00 |
| 0001-0060 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 50 | $48.00 |
| 0001-0070 | Radial guardrail GR-MGS1 (505SD20-0014) | LF | 50 | $42.00 |
| 0001-0080 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 85 | $4,750.00 |
| 0001-0090 | Guardrail end anchorage GR-MGS3 (505SD20-0018) | EACH | 25 | $1,250.00 |
| 0001-0100 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 60 | $1,500.00 |
| 0001-0110 | Guardrail GR-8 NCHRP 350 TL-3 (505SD20-0020) | LF | 100 | $35.00 |
| 0001-0120 | Guardrail GR-8A NCHRP 350 TL-3 (505SD20-0022) | LF | 100 | $40.00 |
| 0001-0130 | Guardrail GR-8B NCHRP 350 TL-3 (505SD20-0024) | LF | 100 | $50.00 |
| 0001-0140 | Guardrail terminal GR-6 NCHRP 350 (505SD20-0027) | LF | 200 | $120.00 |
| 0001-0150 | Guardrail terminal GR-11 (505SD20-0029) | EACH | 4 | $1,225.00 |
| 0001-0160 | Guardrail GR-2 (505SD20-0030) | LF | 500 | $37.50 |
| 0001-0170 | Guardrail GR-2A (505SD20-0033) | LF | 50 | $47.50 |
| 0001-0180 | Alt.breakaway cable term. GR-9 (505SD20-0038) | EACH | 4 | $4,500.00 |
| 0001-0190 | Guardrail GR-10 (505SD20-0040) | LF | 100 | $45.00 |
| 0001-0200 | Fixed object attach. GR- foa-1 TY. I (505SD20-0045) | EACH | 2 | $2,750.00 |
| 0001-0210 | Fixed object attach. GR- foa-1 TY. II (505SD20-0046) | EACH | 2 | $750.00 |
| 0001-0220 | Fixed object attach. GR- foa-2 TY. I (505SD20-0053) | EACH | 2 | $2,750.00 |
| 0001-0230 | Fixed object attach. GR- foa-2 TY. II (505SD20-0054) | EACH | 2 | $750.00 |
| 0001-0240 | Guardrail beam (505SD20-0071) | LF | 100 | $30.00 |
| 0001-0250 | Remove existing guardrail (505SD20-0073) | LF | 3,000 | $10.00 |
| 0001-0260 | Guardrail, thrie beam (505SD20-0074) | LF | 50 | $40.00 |
| 0001-0270 | W beam end sect rounded (505SP20-0005) | EACH | 4 | $50.00 |
| 0001-0280 | NS hand dig guardrail post utilities (505SX20-0001) | EACH | 25 | $400.00 |
| 0001-0290 | NS guardrail asymmetrical thrie beam transition (505SX20-0004) | EACH | 4 | $500.00 |
| 0001-0300 | NS guardrail GR-MGS2 end terminal site preparation 4' moderate (505SX20-0004) | EACH | 45 | $750.00 |
| 0001-0310 | NS guardrail GR-MGS2 end terminal site preparation, 6' moderate (505SX20-0004) | EACH | 20 | $750.00 |
| 0001-0320 | NS guardrail GR-MGS2 end terminal site preparation, minor (505SX20-0004) | EACH | 20 | $750.00 |
| 0001-0330 | NS guardrail post leave- out (505SX20-0004) | EACH | 50 | $150.00 |
| 0001-0340 | Truck mounted attenuator (512SD20-0023) | HR | 600 | $30.00 |
| 0001-0350 | Group 2 channelizing devices (512SD20-0024) | DAY | 500 | $10.00 |
| 0001-0360 | Port.changeable mess. sign (512SD20-0025) | HR | 600 | $5.00 |
| 0001-0370 | Electronic arrow board (512SD20-0026) | HR | 600 | $5.00 |
| 0001-0380 | Flagger service (512SD20-0027) | HR | 600 | $30.00 |
| 0001-0390 | Portable temporary rumble strip array (512SP20-0001) | DAY | 60 | $1.00 |
| 0001-0400 | NS mobilization on-call task order greater than $40,000 (edinburg residency) (513SX20-0001) | EACH | 2 | $1.00 |
| 0001-0410 | NS mobilization on-call task order greater than $40,000 (harrisonburg residency) (513SX20-0001) | EACH | 2 | $1.00 |
| 0001-0420 | NS mobilization on-call task order greater than $40,000 (lexington residency) (513SX20-0001) | EACH | 1 | $1.00 |
| 0001-0430 | NS mobilization on-call task order less than $40,000 (edinburg residency) (513SX20-0001) | EACH | 2 | $1.00 |
| 0001-0440 | NS mobilization on-call task order less than $40,000 (harrisonburg residency) (513SX20-0001) | EACH | 2 | $1.00 |
| 0001-0450 | NS mobilization on-call task order less than $40,000 (lexington residency) (513SX20-0001) | EACH | 1 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of March 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.