VDOT contract C0000128578N01 bid tabulation

On-call mash guardrail improvements. Let by Virginia DOT on April 22, 2026, Northern Va, Northern Virginia. 3 bids received; low bid $334,563 by L. S. Lee, Inc..

Owner
Virginia DOT
Letting
22 APR 2026
Pay items
33
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1L. S. Lee, Inc.$334,563Low
2Long Fence Company, Inc.$360,740+8.0%
3Makco, Incorporated$665,565+99%
VDOT contract C0000128578N01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. L. S. Lee, Inc.2. Long Fence Company, Inc.3. Makco, Incorporated
0001-0010Temp. silt fence type A (303SD20-0034)LF400$0.50$3.00$10.00
0001-0020Borrow excavation (305SD20-0001)CY10$25.00$100.00$200.00
0001-0030Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003)TON500$85.00$70.00$100.00
0001-0040Machining shoulders (305SP20-0005)LF3,610$1.00$5.00$15.00
0001-0050Manual shoulders restoration (305SP20-0006)LF65$5.00$20.00$25.00
0001-0060NS saw cut H.C.C. items (full depth) (502SX20-0010)LF130$20.00$45.00$50.00
0001-0070Remove EX. guardrail terminal (505SD20-0009)EACH30$400.00$650.00$1,500.00
0001-0080Guardrail GR-MGS1 (505SD20-0011)LF780$37.50$30.00$50.00
0001-0090Guardrail GR-MGS1A (505SD20-0012)LF50$50.00$45.00$60.00
0001-0100Guardrail terminal GR- MGS2 (505SD20-0017)EACH25$3,300.00$3,900.00$6,000.00
0001-0110Guardrail end anchorage GR-MGS3 (505SD20-0018)EACH10$1,600.00$1,800.00$2,000.00
0001-0120Guardrail height transition GR-MGS4 (505SD20-0019)EACH15$2,500.00$1,000.00$2,000.00
0001-0130Guardrail GR-2 (505SD20-0030)LF82$29.00$27.00$50.00
0001-0140Guardrail GR-10 (505SD20-0040)LF44$55.00$55.00$60.00
0001-0150Fixed object attach. GR- foa-3 TY. I (505SD20-0047)EACH1$2,800.00$2,900.00$4,000.00
0001-0160Bull nose barrier (505SD20-0067)EACH1$7,500.00$11,500$15,000
0001-0170Remove existing guardrail (505SD20-0073)LF3,540$3.00$4.50$20.00
0001-0180NS SP. des. GR.BR.attach BR-GR -20E (505SX20-0044)EACH2$9,500.00$9,000.00$7,500.00
0001-0190NS guardrail GR-11 (505SX20-0057)LF35$72.00$125.00$160.00
0001-0200NS guardrail post leave out (505SX20-0058)EACH50$65.00$75.00$250.00
0001-0210NS guardrail terminal site prep. (4-FT moderate) (505SX20-0058)EACH2$1,000.00$650.00$2,500.00
0001-0220NS guardrail terminal site prep. (6-FT moderate) (505SX20-0058)EACH2$1,000.00$900.00$2,500.00
0001-0230NS guardrail terminal site prep. (minor) (505SX20-0058)EACH5$1,000.00$650.00$2,500.00
0001-0240Truck mounted attenuator (512SD20-0023)HR220$0.01$20.00$50.00
0001-0250Group 2 channelizing devices (512SD20-0024)DAY100$0.01$0.01$20.00
0001-0260Port.changeable mess. sign (512SD20-0025)HR120$3.00$15.00$20.00
0001-0270Electronic arrow board (512SD20-0026)HR220$0.01$15.00$20.00
0001-0280Flagger service (512SD20-0027)HR135$45.00$40.00$50.00
0001-0290Portable temporary rumble strip array (512SP20-0001)DAY4$50.00$250.00$1,000.00
0001-0300NS utilities hand dig and install guardrail post (520SX20-0013)EACH110$300.00$175.00$500.00
0001-0310Sign post STP-1, 2", 14 gauge (700SD20-0034)LF60$25.00$250.00$150.00
0001-0320Conc. found. STP-1, TY. D (700SD20-0041)EACH2$1,000.00$750.00$5,000.00
0001-0330Sign panel (701SD20-0001)SF18$150.00$200.00$200.00
VDOT contract C0000128578N01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of April 22, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy