VDOT contract C0000128694N01 bid tabulation
On call - guardrail hits repair. Let by Virginia DOT on May 27, 2026, Bland, Buchanan, Dickenson, Grayson, Lee, Russell, Scott,, Bristol. 3 bids received; low bid $1,064,408 by Nickelston Industries, Inc..
- Owner
- Virginia DOT
- Letting
- 27 MAY 2026
- Pay items
- 52
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Nickelston Industries, Inc. | $1,064,408 | Low |
| 2 | L. S. Lee, Inc. | $1,844,458 | +73% |
| 3 | Makco, Incorporated | $1,901,050 | +79% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Nickelston Industries, Inc. | 2. L. S. Lee, Inc. | 3. Makco, Incorporated |
|---|---|---|---|---|---|---|
| 0001-0010 | Utility test pit unpaved (303SX20-0012) | EACH | 10 | $1,000.00 | $1,000.00 | $500.00 |
| 0001-0020 | Utility test pit asphalt concrete (303SX20-0013) | EACH | 10 | $40.00 | $1,500.00 | $600.00 |
| 0001-0030 | Aggr. base matl. TY. I no. 21A (308SD20-0011) | TON | 50 | $40.00 | $130.00 | $140.00 |
| 0001-0040 | Railing texas T-6 const. (410SD20-0004) | LF | 25 | $100.00 | $550.00 | $250.00 |
| 0001-0050 | Remove EX. guardrail terminal (505SD20-0009) | EACH | 80 | $0.01 | $1,500.00 | $1,500.00 |
| 0001-0060 | Guardrail GR-MGS1 (505SD20-0011) | LF | 2,500 | $42.00 | $36.50 | $50.00 |
| 0001-0070 | Guardrail GR-MGS1A (505SD20-0012) | LF | 200 | $50.00 | $48.50 | $60.00 |
| 0001-0080 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 100 | $60.00 | $42.00 | $60.00 |
| 0001-0090 | Radial guardrail GR-MGS1 (505SD20-0014) | LF | 300 | $43.00 | $55.00 | $55.00 |
| 0001-0100 | Radial guardrail GR- MGS1, 9' post (505SD20-0016) | LF | 100 | $62.00 | $60.00 | $65.00 |
| 0001-0110 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 60 | $4,000.00 | $4,300.00 | $5,500.00 |
| 0001-0120 | Guardrail end anchorage GR-MGS3 (505SD20-0018) | EACH | 20 | $2,100.00 | $2,200.00 | $2,500.00 |
| 0001-0130 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 40 | $2,000.00 | $1,575.00 | $2,500.00 |
| 0001-0140 | Guardrail terminal GR-6 NCHRP 350 (505SD20-0027) | LF | 25 | $80.00 | $250.00 | $200.00 |
| 0001-0150 | Guardrail terminal GR-11 (505SD20-0029) | EACH | 10 | $1,800.00 | $1,400.00 | $2,500.00 |
| 0001-0160 | Guardrail GR-2 (505SD20-0030) | LF | 3,000 | $22.00 | $35.00 | $50.00 |
| 0001-0170 | Guardrail GR-2 8' post (505SD20-0032) | LF | 150 | $23.00 | $41.00 | $60.00 |
| 0001-0180 | Guardrail GR-2A (505SD20-0033) | LF | 75 | $26.00 | $50.00 | $60.00 |
| 0001-0190 | Rad. guardrail GR-2 (505SD20-0034) | LF | 400 | $26.00 | $50.00 | $55.00 |
| 0001-0200 | Guardrail GR-10 (505SD20-0040) | LF | 25 | $25.00 | $65.00 | $60.00 |
| 0001-0210 | Fixed object attach. GR- foa-1 TY. I (505SD20-0045) | EACH | 3 | $4,000.00 | $4,200.00 | $4,000.00 |
| 0001-0220 | Fixed object attach. GR- foa-2 TY. I (505SD20-0053) | EACH | 3 | $3,000.00 | $4,200.00 | $4,000.00 |
| 0001-0230 | Fixed object attach. GR- foa-5 (505SD20-0055) | EACH | 5 | $4,500.00 | $5,600.00 | $4,500.00 |
| 0001-0240 | Median barrier MB-3 (505SD20-0059) | LF | 1,000 | $30.00 | $75.00 | $75.00 |
| 0001-0250 | Guardrail beam (505SD20-0071) | LF | 2,000 | $44.00 | $80.00 | $40.00 |
| 0001-0260 | Remove existing guardrail (505SD20-0073) | LF | 15,000 | $0.01 | $12.00 | $10.00 |
| 0001-0270 | W beam end sect rounded (505SP20-0005) | EACH | 8 | $50.00 | $125.00 | $100.00 |
| 0001-0280 | W beam backup plate (505SP20-0006) | EACH | 10 | $10.00 | $35.00 | $40.00 |
| 0001-0290 | Radial guardrail beam (505SP20-0007) | LF | 200 | $44.00 | $98.00 | $45.00 |
| 0001-0300 | Wood, conc., or steel post (505SP20-0010) | EACH | 300 | $70.00 | $175.00 | $150.00 |
| 0001-0310 | Offset block (505SP20-0012) | EACH | 300 | $10.00 | $35.00 | $50.00 |
| 0001-0320 | Drill hole (505SP20-0014) | EACH | 30 | $100.00 | $900.00 | $250.00 |
| 0001-0330 | Realign post (505SP20-0015) | EACH | 100 | $10.00 | $25.00 | $50.00 |
| 0001-0340 | Bent plate or S3X5.7 steel post GR-8 (505SP20-0033) | EACH | 7 | $100.00 | $350.00 | $200.00 |
| 0001-0350 | NS hand dig guardrail post hand dig guardrail post (505SX20-0001) | EACH | 25 | $40.00 | $550.00 | $500.00 |
| 0001-0360 | NS guardrail post N-cap (505SX20-0004) | EACH | 200 | $20.00 | $55.00 | $200.00 |
| 0001-0370 | NS guardrail median barrier terminal (505SX20-0058) | EACH | 5 | $13,000 | $14,000 | $15,000 |
| 0001-0380 | NS guardrail post leave out (505SX20-0058) | EACH | 10 | $100.00 | $110.00 | $200.00 |
| 0001-0390 | NS guardrail remove median barrier terminal (505SX20-0058) | EACH | 5 | $1.00 | $1,500.00 | $2,000.00 |
| 0001-0400 | NS guardrail terminal site prep (minor) (505SX20-0058) | EACH | 4 | $350.00 | $1,800.00 | $2,500.00 |
| 0001-0410 | NS guardrail terminal site prep 4' (mod) (505SX20-0058) | EACH | 4 | $450.00 | $1,800.00 | $2,500.00 |
| 0001-0420 | NS guardrail terminal site prep 6' (mod) (505SX20-0058) | EACH | 4 | $450.00 | $1,800.00 | $2,500.00 |
| 0001-0430 | NS impact attenuator maintenance and repair training (505SX20-0070) | EACH | 1 | $100.00 | $5,000.00 | $1,000.00 |
| 0001-0440 | Impact atten.ser. TY. 1 TL- 3, >=40 MPH (512SD20-0007) | EACH | 2 | $30,000 | $52,000 | $45,000 |
| 0001-0450 | Impact atten.ser. TY. I TL-2, <40 MPH (512SD20-0008) | EACH | 2 | $28,000 | $38,000 | $40,000 |
| 0001-0460 | Truck mounted attenuator (512SD20-0023) | HR | 350 | $0.01 | $0.01 | $50.00 |
| 0001-0470 | Group 2 channelizing devices (512SD20-0024) | DAY | 100 | $0.01 | $0.01 | $10.00 |
| 0001-0480 | Electronic arrow board (512SD20-0026) | HR | 350 | $0.01 | $0.01 | $10.00 |
| 0001-0490 | Flagger service (512SD20-0027) | HR | 400 | $0.01 | $85.00 | $50.00 |
| 0001-0500 | Portable temporary rumble strip array (512SP20-0001) | DAY | 15 | $1.00 | $200.00 | $500.00 |
| 0001-0510 | Emergency mobilization (513SX20-0002) | EACH | 15 | $3,500.00 | $6,500.00 | $4,500.00 |
| 0001-0520 | Guardrail delineator (702SD20-0001) | EACH | 35 | $20.00 | $35.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of May 27, 2026. Compiled by Mirage Metrics.