VDOT contract C000125173N01C bid tabulation
Clear zone improvements - guardrail. Let by Virginia DOT on September 23, 2026, Spotsylvania, Fredericksburg. 2 bids received; low bid $1,986,600 by L. S. Lee, Inc..
- Owner
- Virginia DOT
- Letting
- 23 SEP 2026
- Pay items
- 25
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | L. S. Lee, Inc. | $1,986,600 | Low |
| 2 | Makco, Incorporated | $1,991,335 | 0.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. L. S. Lee, Inc. | 2. Makco, Incorporated |
|---|---|---|---|---|---|
| 0001-0010 | Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003) | TON | 500 | $84.00 | $125.00 |
| 0001-0020 | Machining shoulders (305SP20-0005) | LF | 26,675 | $4.00 | $4.00 |
| 0001-0030 | Guardrail GR-MGS1 (505SD20-0011) | LF | 11,575 | $32.00 | $35.00 |
| 0001-0040 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 15,100 | $42.00 | $45.00 |
| 0001-0050 | Radial guardrail GR-MGS1 (505SD20-0014) | LF | 50 | $52.00 | $40.00 |
| 0001-0060 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 37 | $3,825.00 | $4,500.00 |
| 0001-0070 | Guardrail end anchorage GR-MGS3 (505SD20-0018) | EACH | 37 | $1,700.00 | $1,500.00 |
| 0001-0080 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 1 | $1,150.00 | $1,500.00 |
| 0001-0090 | Remove existing guardrail (505SD20-0073) | LF | 16,095 | $4.15 | $8.00 |
| 0001-0100 | NS hand dig guardrail post and install (505SX20-0001) | EACH | 420 | $475.00 | $150.00 |
| 0001-0110 | NS SP. des. GR.BR.attach BR-GR BRGR-17E (505SX20-0044) | EACH | 2 | $4,650.00 | $4,850.00 |
| 0001-0120 | NS SP. des. GR.BR.attach BR-GR BRGR-1A (505SX20-0044) | EACH | 4 | $10,600 | $5,000.00 |
| 0001-0130 | NS guardrail height transition GR-MGS4 with 9' post (505SX20-0058) | EACH | 7 | $1,800.00 | $1,750.00 |
| 0001-0140 | NS guardrail terminal site prep. (4-FT moderate) (505SX20-0058) | EACH | 15 | $1,500.00 | $1,000.00 |
| 0001-0150 | NS guardrail terminal site prep. (6-FT moderate) (505SX20-0058) | EACH | 1 | $1,500.00 | $1,000.00 |
| 0001-0160 | NS guardrail terminal site prep. (minor) (505SX20-0058) | EACH | 21 | $1,500.00 | $1,000.00 |
| 0001-0170 | Maintenance of traffic (project wide) (512SP20-0002) | LS | 1 | $76,991 | $100,000 |
| 0001-0180 | Mobilization (513SD20-0001) | LS | 1 | $117,700 | $100,000 |
| 0001-0190 | Relocate EX. 1 post GRND mount SGN panel (700SD20-0012) | EACH | 11 | $150.00 | $750.00 |
| 0001-0200 | Relocate EX. 2 post GRND mount SGN panel (700SD20-0013) | EACH | 1 | $150.00 | $1,450.00 |
| 0001-0210 | Sign post STP-1, 2 3/16", 10 gauge (700SD20-0035) | LF | 6 | $200.00 | $75.00 |
| 0001-0220 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 72 | $120.00 | $75.00 |
| 0001-0230 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 70 | $110.00 | $75.00 |
| 0001-0240 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 7 | $2,000.00 | $1,500.00 |
| 0001-0250 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 5 | $2,200.00 | $2,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of September 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.