VDOT contract CM826LMB127494 bid tabulation
2026 latex modified- primary/secondary. Let by Virginia DOT on November 19, 2025, Augusta, Rockbridge, Rockingham, Staunton. 2 bids received; low bid $4,533,663 by Slurry Pavers, Inc..
- Owner
- Virginia DOT
- Letting
- 19 NOV 2025
- Pay items
- 30
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Slurry Pavers, Inc. | $4,533,663 | Low |
| 2 | Superior Paving Corporation | $5,331,047 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Slurry Pavers, Inc. | 2. Superior Paving Corporation |
|---|---|---|---|---|---|
| 0001-0010 | Flexible latex modified emulsion treatment, (type B) (312SP20-0007) | TON | 8,318.49 | $354.13 | $435.00 |
| 0001-0020 | Crack sealant/filler type A (322SD20-0001) | LB | 97,000 | $3.32 | $3.30 |
| 0001-0030 | Flagger service (512SD20-0027) | HR | 3,791 | $37.00 | $36.00 |
| 0001-0040 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 1,852 | $3.65 | $4.00 |
| 0001-0050 | Eradicate nonlinear PVMT MRKG (512SD20-0043) | SF | 19,830 | $2.20 | $2.50 |
| 0001-0060 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 419,150 | $0.18 | $0.17 |
| 0001-0070 | Temp. PVMT MRKG TY. A, 6" (512SD20-0047) | LF | 248,500 | $0.20 | $0.20 |
| 0001-0080 | Temp. PVMT MRKG TY. A, 12" (512SD20-0049) | LF | 2,032 | $1.63 | $1.65 |
| 0001-0090 | Temp. PVMT. symb. MRKG SNGL turn arrow TY. A (512SD20-0052) | EACH | 400 | $27.00 | $30.00 |
| 0001-0100 | Temp. PVMT. symb. MRKG R/R crossing TY. A (512SD20-0053) | EACH | 4 | $80.00 | $85.00 |
| 0001-0110 | NS maintenance of traffic MOT for upc 125218 (512SP20-0002) | LS | 1 | $35,400 | $185,000 |
| 0001-0120 | NS maintenance of traffic MOT for upc 127494 (512SP20-0002) | LS | 1 | $166,625 | $188,500 |
| 0001-0130 | NS temp. PVMT MRKG temp. double turn arrow (512SX20-0006) | EACH | 4 | $78.00 | $100.00 |
| 0001-0140 | NS temp. PVMT MRKG temp. lane reduction arrow (512SX20-0006) | EACH | 4 | $78.00 | $100.00 |
| 0001-0150 | NS temp. PVMT MRKG temp. school zone - 10' (512SX20-0006) | EACH | 6 | $78.00 | $100.00 |
| 0001-0160 | Type A PVMT line MRKG 4" (704SD20-0001) | LF | 67,400 | $0.22 | $0.22 |
| 0001-0170 | Type A PVMT line MRKG 6" (704SD20-0002) | LF | 10,900 | $0.24 | $0.25 |
| 0001-0180 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 351,950 | $0.76 | $0.76 |
| 0001-0190 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 237,800 | $0.81 | $0.81 |
| 0001-0200 | Type B class I PVMT line MRKG 12" (704SD20-0009) | LF | 370 | $3.86 | $4.00 |
| 0001-0210 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 2,196 | $12.45 | $13.00 |
| 0001-0220 | Type B class VI contrast PVMT line MRKG 4" (704SD20-0030) | LF | 800 | $9.30 | $10.00 |
| 0001-0230 | Type B class VI contrast PVMT line MRKG 6" (704SD20-0031) | LF | 650 | $9.30 | $10.00 |
| 0001-0240 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 1,437 | $102.00 | $68.00 |
| 0001-0250 | PVMT MSG. mark. R/R crossing TY. B, CL. II (704SD20-0042) | EACH | 2 | $438.00 | $500.00 |
| 0001-0260 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 200 | $300.00 | $300.00 |
| 0001-0270 | DBL turn arr.thru/LT or RT TY B, CL II (704SD20-0051) | EACH | 2 | $385.00 | $500.00 |
| 0001-0280 | Symb MRKG lane reduction arr TY B CL II (704SD20-0060) | EACH | 6 | $385.00 | $500.00 |
| 0001-0290 | Symb MRKG helmeted bicyclist TY B CL II (704SD20-0102) | EACH | 2 | $385.00 | $500.00 |
| 0001-0300 | PVMT MSG. mark.“school” TY B, CL II, 10' (704SD20-0124) | EACH | 3 | $450.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.