Connection to drainage structure unit price, Washington

Low bidders on WSDOT contracts carried a median of $1,785.00 per EACH for connection to drainage structure, over the 24 months to 07 OCT 2026, across 1 low bids. Half of all 5 bids fell between $2,972.66 and $5,300.00.

Owner
Washington State DOT
Item
No code published
Unit
EACH
Latest letting
15 JUL 2026
$1,785.00Low bidder's median, per EACH
$3,000.00Median of all bids, per EACH
1Contracts in the window
$1,500.00Engineer's estimate, median per EACH

By year of letting

Connection to drainage structure, WSDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
200011$500.006$625.00
200166$500.0032$500.00
200244$450.0024$500.00
200388$420.0049$500.00
200499$400.0053$500.00
200533$1,000.0017$600.00
200644$800.0022$675.00
200766$750.0039$800.00
200833$500.0022$550.00
200965$750.0044$750.00
201077$500.0056$522.50
201166$550.0035$525.00
201266$687.5041$600.00
201388$471.4340$1,000.00
201444$612.5020$725.00
201522$930.7711$1,111.54
201677$1,200.0049$1,100.00
201788$1,425.0033$1,032.00
201955$800.0020$1,125.00
202033$1,100.0017$1,250.00
202177$1,700.0030$1,835.00
202233$700.006$1,450.00
202344$2,765.5014$2,150.00
202611$1,785.005$3,000.00
Connection to drainage structure, WSDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By region

Connection to drainage structure, WSDOT: unit prices by region, all lettings
RegionLow bidsLow-bid medianAll bidsMedian, all bids
NWR region78$628.88464$746.25
OR region10$550.0067$600.00
SWR region7$500.0057$650.00
ER region8$1,350.0034$1,150.00
NCR region9$1,250.0031$1,000.00
SCR region6$1,642.5025$1,300.00
Connection to drainage structure, WSDOT: unit prices by region, all lettings

Regions with at least three low bids, over all lettings.

By quantity

Connection to drainage structure, WSDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 230$1,005.77
2 to 330$775.00
3 to 730$750.00
7 to 3930$500.00
Connection to drainage structure, WSDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest WSDOT contracts carrying Connection to drainage structure
LetContractRegionQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
15 JUL 2026XE3755SCR region1$1,785.00$3,000.00$1,500.005INTERWEST CONSTRUCTION, INC.WSDOT
01 MAR 2023009935NWR region6$2,731.00$2,100.00$1,000.005FABER CONSTRUCTION CORP.WSDOT
23 FEB 2023009925ER region4$2,800.00$1,900.00$2,000.002MAX J. KUNEY COMPANYWSDOT
23 FEB 2023009934NCR region3$1,250.00$630.00$1,400.003CENTRAL WASHINGTON ASPHALT, INC.INTERSTATE CONCRETE & ASPHALTWSDOT
01 FEB 2023009921NCR region1$5,350.00$3,600.00$1,400.004JOHANSEN CONSTRUCTION COMPANY,WSDOT
16 MAR 2022009782Region 92$700.00$1,050.00$2,000.002LAKESIDE INDUSTRIES, INC.WSDOT
02 MAR 2022009762NWR region1$2,400.00$2,400.00$1,500.003MIDMOUNTAIN CONTRACTORS, INC.WSDOT
12 JAN 2022009758NWR region2$650.00$650.00$1,000.001AWARD CONSTRUCTION, INC.WSDOT
21 APR 2021009662NWR region1$2,930.00$2,465.00$1,500.004SCARSELLA BROS., INC.WSDOT
07 APR 2021009668NWR region2$1,700.00$1,800.00$500.005INTERWEST CONSTRUCTION, INC.WSDOT
24 MAR 2021009636OR region7$2,000.00$1,850.00$750.004GRAHAM CONTRACTING, LTD.WSDOT
24 MAR 2021009664SWR region1$650.00$1,000.00$5,000.003MCDONALD EXCAVATING, INC.WSDOT
24 MAR 2021009656NWR region8$600.00$1,285.00$2,100.004MARSHBANK CONSTRUCTION, INC.WSDOT
03 FEB 2021009625SCR region3$1,300.00$1,009.50$1,250.008SCARSELLA BROS., INC.WSDOT
03 FEB 2021009632SCR region1$3,221.40$2,360.70$1,000.002MORENO & NELSON CONSTRUCTIONWSDOT
Latest WSDOT contracts carrying Connection to drainage structure

Filter this item by your own quantity, region and period, or check your price against it, in the WSDOT explorer.

How these prices were read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are WSDOT's own: this item is compared with WSDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy