WisDOT contract 20250114005 bid tabulation
Ft Atkinson - Palmyra; First Street to STH 59 (STH 106, Jefferson County Ft. Atkinson - Palmyra). Let by Wisconsin DOT on January 14, 2025, Jefferson. 3 bids received; low bid $269,911 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 55
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $269,911 | Low |
| 2 | Rock Road Companies, Inc. | $304,246 | +13% |
| 3 | Stark Pavement Corporation | $339,413 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Rock Road Companies, Inc. | 3. Stark Pavement Corporation |
|---|---|---|---|---|---|---|
| 1 | Removing asphaltic surface (204.0110) | SY | 20 | $45.00 | $60.93 | $85.00 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 120 | $4.00 | $6.75 | $11.00 |
| 3 | Removing asphaltic surface milling (204.0120) | SY | 5,650 | $3.70 | $4.57 | $5.00 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 120 | $42.90 | $24.37 | $144.75 |
| 5 | Prepare foundation for asphaltic paving (project) 01. 3576-01-75 (211.0101) | EACH | 1 | $1,175.00 | $0.01 | $1,075.00 |
| 6 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 6 | $720.00 | $319.99 | $445.05 |
| 7 | Finishing roadway (project) 01. 3576-01-75 (213.0100) | EACH | 1 | $950.00 | $8,175.06 | $500.00 |
| 8 | Base aggregate dense 3/4-inch (305.0110) | TON | 240 | $15.00 | $37.97 | $68.00 |
| 9 | Tack coat (455.0605) | GAL | 400 | $2.30 | $4.21 | $3.00 |
| 10 | Incentive density HMA pavement (460.2000) | DOL | 420 | $1.00 | $1.00 | $1.00 |
| 11 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 650 | $84.45 | $120.12 | $91.10 |
| 12 | Asphaltic surface (465.0105) | TON | 10 | $255.00 | $302.68 | $325.00 |
| 13 | Asphaltic surface patching (465.0110) | TON | 120 | $255.00 | $144.98 | $230.00 |
| 14 | Concrete sidewalk 4-inch (602.0405) | SF | 1,760 | $10.04 | $7.78 | $14.50 |
| 15 | Curb ramp detectable warning field yellow (602.0505) | SF | 130 | $46.35 | $77.52 | $55.00 |
| 16 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 42 | $77.25 | $88.36 | $65.00 |
| 17 | Maintenance and repair of haul roads (project) 01. 3576-01-75 (618.0100) | EACH | 1 | $1.00 | $0.01 | $100.00 |
| 18 | Mobilization (619.1000) | EACH | 1 | $27,350 | $27,500 | $61,900 |
| 19 | Water (624.0100) | MGAL | 3.60 | $0.01 | $0.01 | $100.00 |
| 20 | Topsoil (625.0100) | SY | 95 | $25.75 | $32.51 | $10.00 |
| 21 | Silt fence (628.1504) | LF | 100 | $5.15 | $6.50 | $0.50 |
| 22 | Silt fence maintenance (628.1520) | LF | 200 | $0.26 | $0.33 | $0.01 |
| 23 | Mobilizations erosion control (628.1905) | EACH | 3 | $257.50 | $325.06 | $100.00 |
| 24 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $309.00 | $390.07 | $25.00 |
| 25 | Erosion mat urban class I type A (628.2006) | SY | 95 | $2.58 | $3.25 | $10.00 |
| 26 | Inlet protection type B (628.7010) | EACH | 3 | $61.80 | $78.01 | $80.00 |
| 27 | Fertilizer type B (629.0210) | CWT | 0.60 | $206.00 | $260.05 | $100.00 |
| 28 | Seeding mixture no. 40 (630.0140) | LB | 2 | $51.50 | $65.01 | $90.00 |
| 29 | Seed water (630.0500) | MGAL | 2 | $103.00 | $130.02 | $1.00 |
| 30 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 4 | $103.00 | $130.02 | $150.00 |
| 31 | Moving signs type II (638.2102) | EACH | 4 | $103.00 | $130.02 | $90.00 |
| 32 | Removing small sign supports (638.3000) | EACH | 4 | $51.50 | $65.01 | $25.00 |
| 33 | Field office type B (642.5001) | EACH | 1 | $7,500.00 | $5,000.00 | $4,500.00 |
| 34 | Traffic control drums (643.0300) | DAY | 1,250 | $1.03 | $0.65 | $0.25 |
| 35 | Traffic control signs (643.0900) | DAY | 1,700 | $2.58 | $0.46 | $1.00 |
| 36 | Traffic control signs PCMS (643.1050) | DAY | 14 | $41.20 | $32.51 | $75.00 |
| 37 | Temporary marking line paint 6- inch (643.3165) | LF | 4,010 | $1.65 | $0.91 | $0.55 |
| 38 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 740 | $3.09 | $3.90 | $1.75 |
| 39 | Traffic control (643.5000) | EACH | 1 | $5,356.00 | $17,287 | $4,000.00 |
| 40 | Temporary pedestrian surface matting (644.1440) | SF | 1,710 | $2.21 | $3.51 | $2.50 |
| 41 | Temporary pedestrian detectable warning field (644.1605) | SF | 200 | $7.98 | $15.60 | $10.00 |
| 42 | Temporary pedestrian barricade (644.1810) | LF | 850 | $4.12 | $5.53 | $2.50 |
| 43 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 7,300 | $1.52 | $1.92 | $2.15 |
| 44 | Construction staking resurfacing reference (650.8000) | LF | 1,930 | $0.37 | $0.47 | $0.36 |
| 45 | Construction staking curb ramps (650.9000) | EACH | 15 | $206.00 | $260.05 | $200.00 |
| 46 | Construction staking sidewalk (project) 01. 3576-01-75 (650.9500) | EACH | 1 | $1,030.00 | $1,300.23 | $1,000.00 |
| 47 | Construction staking supplemental control (project) 01. 3576-01-75 (650.9911) | EACH | 1 | $1,030.00 | $1,300.23 | $1,000.00 |
| 48 | Sawing asphalt (690.0150) | LF | 440 | $2.06 | $2.20 | $1.25 |
| 49 | Sawing concrete (690.0250) | LF | 55 | $4.12 | $3.25 | $2.25 |
| 50 | Incentive iri ride (740.0440) | DOL | 1,460 | $1.00 | $1.00 | $1.00 |
| 51 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 |
| 52 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 |
| 53 | Special 01. adjusting water valves (SPV.0060) | EACH | 4 | $250.00 | $345.92 | $1,500.00 |
| 54 | Special 02. temporary fence (SPV.0060) | EACH | 1 | $1,236.00 | $1,560.27 | $2,000.00 |
| 55 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 1,060 | $13.95 | $9.49 | $12.20 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.