WisDOT contract 20250114007 bid tabulation

C of Sun Prairie, N. Thompson Road; CTH C to West Main Street (LOC STR, Dane County City of Sun Prairie, N. Thompson Road). Let by Wisconsin DOT on January 14, 2025, Dane. 5 bids received; low bid $2,786,338 by Payne and Dolan, Inc.

Owner
Wisconsin DOT
Letting
14 JAN 2025
Pay items
107
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Payne and Dolan, Inc$2,786,338Low
2Rock Road Companies, Inc.$3,070,995+10%
3Tri-County Paving, Inc.$3,078,577+10%
4Lalonde Contractors Incorporated$3,174,146+14%
5Zignego Company, Inc.$3,284,844+18%
WisDOT contract 20250114007: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Payne and Dolan, Inc2. Rock Road Companies, Inc.3. Tri-County Paving, Inc.4. Lalonde Contractors Incorporated5. Zignego Company, Inc.
1Removing concrete pavement (204.0100)SY168$16.80$19.00$16.80$13.89$20.00
2Removing asphaltic surface (204.0110)SY51,650$1.89$0.50$3.44$3.78$1.89
3Removing gutter (204.0140)LF300$5.00$6.00$5.00$6.26$20.00
4Removing curb & gutter (204.0150)LF10,990$3.30$7.50$3.30$6.26$10.00
5Removing concrete sidewalk (204.0155)SY1,595$16.80$10.00$16.80$10.90$10.00
6Removing manholes (204.0210)EACH1$1,341.00$750.00$1,341.00$1,200.00$750.00
7Removing inlets (204.0220)EACH22$835.00$750.00$835.00$950.00$500.00
8Removing storm sewer (size) 01. 12-inch (204.0245)LF455$57.80$32.00$57.80$45.00$20.00
9Removing storm sewer (size) 02. 15-inch (204.0245)LF67$57.80$34.00$57.80$53.00$20.00
10Removing storm sewer (size) 03. 18-inch (204.0245)LF72$57.80$36.00$57.80$55.00$20.00
11Sealing pipes (204.0280)EACH1$610.00$500.00$610.00$550.00$750.00
12Excavation common (205.0100)CY1,790$31.00$20.00$27.25$30.00$30.00
13Prepare foundation for asphaltic paving (project) 01. 3996-00-31 (211.0101)EACH1$79,200$125,000$85,000$25,475$1.00
14Finishing roadway (project) 01. 3996-00-31 (213.0100)EACH1$1,500.00$7,502.06$40,000$3,008.00$1,000.00
15Base aggregate dense 1 1/4-inch (305.0120)TON3,700$19.30$23.00$23.90$23.68$30.00
16Select crushed material (312.0110)TON1,130$18.70$20.00$25.40$19.83$30.00
17Drilled tie bars (416.0610)EACH228$10.59$10.59$10.59$13.88$30.00
18Tack coat (455.0605)GAL2,354$0.01$3.00$2.75$0.01$0.01
19Incentive density HMA pavement (460.2000)DOL8,450$1.00$1.00$1.00$1.00$1.00
20HMA pavement 3 MT 58-28 S (460.6223)TON7,910$65.00$75.87$68.50$65.00$65.00
21HMA pavement 4 MT 58-28 S (460.6224)TON5,280$68.20$79.87$72.75$68.20$68.20
22Asphaltic surface (465.0105)TON300$80.00$115.00$89.60$80.00$80.00
23Concrete collars for pipe (520.8000)EACH2$660.00$500.00$660.00$800.00$1,000.00
24Concrete curb & gutter 18-inch type D (601.0407)LF70$44.96$44.96$44.96$51.94$70.00
25Concrete curb & gutter 30-inch type A (601.0409)LF32$58.90$58.90$58.90$53.80$70.00
26Concrete curb & gutter 30-inch type D (601.0411)LF9,445$23.47$23.47$23.47$30.44$47.00
27Concrete curb pedestrian (601.0600)LF38$57.31$57.31$57.31$52.22$70.00
28Concrete sidewalk 4-inch (602.0405)SF1,040$4.07$4.07$4.07$8.09$8.50
29Concrete sidewalk 6-inch (602.0415)SF25,635$6.56$6.56$6.56$9.35$10.21
30Curb ramp detectable warning field natural patina (602.0515)SF1,090$49.06$49.06$49.06$40.59$50.00
31Curb ramp detectable warning field radial natural patina (602.0615)SF432.39$58.95$58.95$58.95$56.18$75.00
32Concrete driveway 6-inch (602.0810)SY259$59.04$59.04$59.04$83.95$100.00
33Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF310$135.60$70.00$135.60$140.00$141.00
34Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF26$160.00$80.00$160.00$139.00$146.00
35Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF35$175.90$90.00$175.90$146.00$154.00
36Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF26$234.00$140.00$234.00$226.00$196.00
37Manhole covers type J (611.0530)EACH3$1,170.00$1,000.00$1,170.00$770.00$801.00
38Catch basins 4-FT diameter (611.1004)EACH5$3,370.00$3,100.00$3,370.00$4,286.00$4,900.00
39Catch basins 6-FT diameter (611.1006)EACH2$7,500.00$7,000.00$7,500.00$8,576.00$8,000.00
40Manholes 4-FT diameter (611.2004)EACH3$3,370.00$3,100.00$3,370.00$4,130.00$4,800.00
41Inlets 2.5X3-FT (611.3253)EACH19$2,925.00$3,200.00$2,925.00$3,798.00$4,200.00
42Adjusting manhole covers (611.8110)EACH54$575.00$950.00$575.00$841.00$850.00
43Adjusting inlet covers (611.8115)EACH35$535.00$1,400.00$535.00$841.00$850.00
44Insulation board polystyrene (inch) 01. 2-inch (612.0902.S)SY8$84.40$50.00$84.40$46.00$50.00
45Mobilization (619.1000)EACH1$63,000$160,221$110,000$162,974$144,000
46Water (624.0100)MGAL40$0.01$300.00$70.00$54.40$50.00
47Topsoil (625.0100)SY6,420$9.80$10.00$9.40$11.35$8.00
48Mobilizations erosion control (628.1905)EACH6$100.00$100.00$1.00$225.00$225.00
49Mobilizations emergency erosion control (628.1910)EACH3$100.00$100.00$1.00$225.00$225.00
50Erosion mat class I type A (628.2002)SY5,840$4.00$4.00$3.00$1.08$1.08
51Inlet protection type C (628.7015)EACH100$65.00$65.00$60.00$58.00$58.00
52Fertilizer type B (629.0210)CWT4$250.00$250.00$150.00$85.00$85.00
53Seeding mixture no. 40 (630.0140)LB107$30.00$30.00$15.00$12.75$12.75
54Seed water (630.0500)MGAL34$100.00$100.00$50.00$50.00$50.00
55Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH56$180.00$180.00$210.00$215.00$215.00
56Posts tubular steel 2X2-inch X 16- FT (634.0816)EACH4$200.00$200.00$215.00$220.00$220.00
57Signs type II reflective H (637.2210)SF284.50$19.50$19.50$28.00$20.00$20.00
58Signs type II reflective F (637.2230)SF27.25$21.00$21.00$30.00$23.00$23.00
59Moving signs type II (638.2102)EACH77$100.00$100.00$100.00$95.00$95.00
60Removing signs type II (638.2602)EACH12$35.00$35.00$50.00$28.00$28.00
61Removing small sign supports (638.3000)EACH12$35.00$35.00$50.00$28.00$28.00
62Moving small sign supports (638.4000)EACH32$100.00$100.00$50.00$80.00$80.00
63Field office type C (642.5201)EACH1$3,500.00$12,000$20,000$15,968$10,000
64Traffic control drums (643.0300)DAY4,815$0.20$0.20$0.20$0.20$0.20
65Traffic control barricades type III (643.0420)DAY7,853$0.25$0.35$0.25$0.35$0.35
66Traffic control warning lights type A (643.0705)DAY13,849$0.06$0.09$0.06$0.09$0.09
67Traffic control arrow boards (643.0800)DAY5$40.00$100.00$40.00$100.00$100.00
68Traffic control signs (643.0900)DAY13,607$0.21$0.25$0.21$0.25$0.25
69Traffic control covering signs type II (643.0920)EACH6$112.00$30.00$112.00$30.00$30.00
70Traffic control signs fixed message (643.1000)SF26.50$15.50$16.00$15.50$16.00$16.00
71Traffic control signs PCMS (643.1050)DAY42$45.00$69.00$45.00$69.00$69.00
72Temporary marking removable mask out tape 12-inch (643.3990)LF300$7.00$5.00$7.00$5.00$5.00
73Traffic control (643.5000)EACH1$14,585$5,500.00$20,585$5,500.00$5,500.00
74Marking line epoxy 4-inch (646.1020)LF45,310$0.40$0.40$0.40$0.65$0.65
75Marking line epoxy 8-inch (646.3020)LF435$1.00$1.00$1.00$1.30$1.30
76Marking arrow epoxy (646.5020)EACH96$172.25$172.25$172.25$200.00$200.00
77Marking symbol epoxy (646.5220)EACH95$161.15$161.15$161.15$230.00$230.00
78Marking stop line epoxy 18-inch (646.6120)LF735$14.00$14.00$14.00$13.00$13.00
79Marking yield line epoxy 18-inch (646.6220)EACH71$32.95$32.95$32.95$60.00$60.00
80Marking diagonal epoxy 12-inch (646.7120)LF150$13.45$13.45$13.45$9.00$9.00
81Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,845$13.00$13.00$13.00$10.00$10.00
82Marking curb epoxy (646.8120)LF40$6.60$6.60$6.60$8.00$8.00
83Marking island nose epoxy (646.8220)EACH3$259.50$259.50$259.50$250.00$250.00
84Construction staking storm sewer (650.4000)EACH30$215.00$215.00$215.00$215.00$150.00
85Construction staking base (650.5000)LF9,270$0.85$0.85$0.85$0.85$0.75
86Construction staking curb gutter and curb & gutter (650.5500)LF11,385$0.82$0.82$0.82$0.82$1.50
87Construction staking resurfacing reference (650.8000)LF9,270$0.18$0.18$0.18$0.18$0.10
88Construction staking curb ramps (650.9000)EACH98$215.00$215.00$215.00$215.00$200.00
89Construction staking sidewalk (project) 01. 3996-00-31 (650.9500)EACH1$2,300.00$2,300.00$2,300.00$2,300.00$2,000.00
90Construction staking supplemental control (project) 01. 3996-00-31 (650.9911)EACH1$1,800.00$1,800.00$1,800.00$1,800.00$4,000.00
91Sawing asphalt (690.0150)LF2,405$1.15$1.39$1.75$1.15$1.39
92Sawing concrete (690.0250)LF1,445$2.25$2.25$2.35$2.25$2.00
93Incentive compressive strength concrete pavement (715.0720)DOL1,000$1.00$1.00$1.00$1.00$1.00
94Incentive iri ride (740.0440)DOL7,000$1.00$1.00$1.00$1.00$1.00
95On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00$5.00$5.00$5.00
96On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,320$5.00$5.00$5.00$5.00$5.00
97Special 01. reconnect storm sewer laterals (SPV.0060)EACH1$1,684.00$1,500.00$1,684.00$2,983.00$1,000.00
98Special 02. adjusting water valve boxes (SPV.0060)EACH30$340.00$250.00$340.00$396.30$800.00
99Special 03. inlet covers type D (SPV.0060)EACH26$1,795.00$1,500.00$1,795.00$995.00$920.00
100Special 04. dynamic speed display sign assembly solar powered (SPV.0060)EACH4$5,000.00$5,000.00$5,580.00$5,000.00$5,000.00
101Special 05. rectangular rapid flashing beacon (RRFB) single light bar system (SPV.0060)EACH8$8,000.00$8,000.00$9,951.00$8,000.00$8,000.00
102Special 06. rectangular rapid flashing beacon (RRFB) double light bar system (SPV.0060)EACH4$8,500.00$8,500.00$10,890$8,500.00$8,500.00
103Special 07. rectangular rapid flashing beacon (RRFB) trombone system (SPV.0060)EACH2$17,500$17,500$16,465$17,500$17,500
104Special 08. marked raised crosswalk epoxy (SPV.0060)EACH4$318.25$318.25$318.25$500.00$500.00
105Special 01. concrete curb & gutter 36-inch special (SPV.0090)LF1,800$35.58$35.58$35.58$47.07$50.00
106Special 02. marking crosswalk epoxy block style 18-inch (SPV.0090)LF1,495$22.75$22.75$22.75$12.50$12.50
107Special 01. raised concrete crosswalk (SPV.0180)SY161$105.24$105.24$105.24$221.15$161.00
WisDOT contract 20250114007: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy