| 1 | Grubbing (201.0205) | STA | 7 | $1,180.80 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 2 | $364.85 |
| 3 | Removing concrete pavement (204.0100) | SY | 2,325 | $6.73 |
| 4 | Removing asphaltic surface (204.0110) | SY | 1,711 | $5.26 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 6,919 | $7.96 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 309,804 | $2.02 |
| 7 | Removing guardrail (204.0165) | LF | 6,420 | $1.75 |
| 8 | Abandoning inlets (204.0260) | EACH | 1 | $570.28 |
| 9 | Sealing pipes (204.0280) | EACH | 1 | $570.28 |
| 10 | Removing (item description) 01. removing concrete headwall (204.9060.S) | EACH | 1 | $841.06 |
| 11 | Removing (item description) 02. removing inlet cover (204.9060.S) | EACH | 1 | $681.82 |
| 12 | Excavation common (205.0100) | CY | 7,925 | $7.99 |
| 13 | Borrow (208.0100) | CY | 3,236 | $11.42 |
| 14 | Prepare foundation for asphaltic paving (project) 01. 7605-06-62 (211.0101) | EACH | 1 | $15,000 |
| 15 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 1,598 | $18.85 |
| 16 | Finishing roadway (project) 01. 7605-06-62 (213.0100) | EACH | 1 | $15,000 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 4,720 | $33.49 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 8,610 | $21.25 |
| 19 | Tack coat (455.0605) | GAL | 22,603 | $2.45 |
| 20 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $10,000 |
| 21 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 45,823 | $89.63 |
| 22 | Asphaltic surface (465.0105) | TON | 5,575 | $103.82 |
| 23 | Asphaltic surface patching (465.0110) | TON | 50 | $322.18 |
| 24 | Asphaltic surface driveways and field entrances (465.0120) | TON | 698 | $147.49 |
| 25 | Asphaltic surface temporary (465.0125) | TON | 1,388 | $111.43 |
| 26 | Asphaltic flumes (465.0315) | SY | 24 | $427.36 |
| 27 | Asphaltic rumble strips, shoulder (465.0520) | LF | 164,942 | $0.12 |
| 28 | Asphaltic rumble strips, centerline (465.0560) | LF | 62,310 | $0.17 |
| 29 | Concrete collars for pipe (520.8000) | EACH | 1 | $749.35 |
| 30 | Culvert pipe reinforced concrete class III 60-inch (522.0160) | LF | 16 | $442.77 |
| 31 | Apron endwalls for culvert pipe reinforced concrete 60-inch (522.1060) | EACH | 1 | $4,622.96 |
| 32 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 105 | $161.84 |
| 33 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 4 | $1,566.66 |
| 34 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 252 | $64.11 |
| 35 | Steel thrie beam structure approach (614.0200) | LF | 82.52 | $85.00 |
| 36 | Steel plate beam guard class A (614.0305) | LF | 25 | $25.00 |
| 37 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 4 | $3,203.00 |
| 38 | MGS guardrail 3 (614.2300) | LF | 1,453 | $24.53 |
| 39 | MGS guardrail 3 K (614.2330) | LF | 3,162.50 | $36.00 |
| 40 | MGS guardrail short radius (614.2350) | LF | 48 | $25.00 |
| 41 | MGS thrie beam transition (614.2500) | LF | 315 | $85.00 |
| 42 | MGS guardrail terminal eat (614.2610) | EACH | 25 | $3,203.00 |
| 43 | MGS guardrail short radius terminal (614.2630) | EACH | 1 | $1,953.00 |
| 44 | Maintenance and repair of haul roads (project) 01. 7605-06-62 (618.0100) | EACH | 1 | $8,500.00 |
| 45 | Mobilization (619.1000) | EACH | 1 | $546,922 |
| 46 | Water (624.0100) | MGAL | 130 | $52.53 |
| 47 | Salvaged topsoil (625.0500) | SY | 20,000 | $1.25 |
| 48 | Silt fence (628.1504) | LF | 16,121 | $1.50 |
| 49 | Silt fence maintenance (628.1520) | LF | 16,121 | $0.03 |
| 50 | Mobilizations erosion control (628.1905) | EACH | 7 | $133.00 |
| 51 | Mobilizations emergency erosion control (628.1910) | EACH | 7 | $193.00 |
| 52 | Erosion mat class I type B (628.2004) | SY | 17,670 | $0.95 |
| 53 | Erosion mat urban class I type B (628.2008) | SY | 2,500 | $2.25 |
| 54 | Temporary ditch checks (628.7504) | LF | 250 | $7.00 |
| 55 | Culvert pipe checks (628.7555) | EACH | 5 | $25.00 |
| 56 | Rock bags (628.7570) | EACH | 636 | $6.33 |
| 57 | Fertilizer type B (629.0210) | CWT | 12.60 | $90.00 |
| 58 | Seeding mixture no. 20 (630.0120) | LB | 900 | $6.53 |
| 59 | Seeding temporary (630.0200) | LB | 288 | $4.83 |
| 60 | Seed water (630.0500) | MGAL | 1,233 | $3.00 |
| 61 | Markers culvert end (633.5200) | EACH | 2 | $78.00 |
| 62 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 9 | $95.00 |
| 63 | Signs type II reflective H (637.2210) | SF | 51.30 | $25.00 |
| 64 | Signs type II reflective F (637.2230) | SF | 5.60 | $30.00 |
| 65 | Moving signs type II (638.2102) | EACH | 17 | $100.00 |
| 66 | Removing signs type II (638.2602) | EACH | 1 | $50.00 |
| 67 | Removing small sign supports (638.3000) | EACH | 1 | $50.00 |
| 68 | Moving small sign supports (638.4000) | EACH | 13 | $100.00 |
| 69 | Field office type B (642.5001) | EACH | 1 | $11,000 |
| 70 | Traffic control drums (643.0300) | DAY | 4,835 | $0.25 |
| 71 | Traffic control barricades type III (643.0420) | DAY | 255 | $1.76 |
| 72 | Traffic control warning lights type A (643.0705) | DAY | 510 | $0.18 |
| 73 | Traffic control warning lights type C (643.0715) | DAY | 1,030 | $0.17 |
| 74 | Traffic control signs (643.0900) | DAY | 8,442 | $0.46 |
| 75 | Traffic control covering signs type II (643.0920) | EACH | 16 | $39.03 |
| 76 | Traffic control signs fixed message (643.1000) | SF | 60 | $20.60 |
| 77 | Traffic control signs PCMS (643.1050) | DAY | 28 | $33.65 |
| 78 | Temporary marking line paint 6- inch (643.3165) | LF | 225,913 | $0.24 |
| 79 | Temporary marking line removable tape 6-inch (643.3180) | LF | 11,074 | $1.67 |
| 80 | Temporary marking line paint 10- inch (643.3265) | LF | 786 | $0.42 |
| 81 | Temporary marking line removable tape 10-inch (643.3280) | LF | 296 | $3.26 |
| 82 | Traffic control (643.5000) | EACH | 1 | $25,006 |
| 83 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 258,545 | $1.25 |
| 84 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 4,625 | $2.25 |
| 85 | Marking arrow epoxy (646.5020) | EACH | 42 | $290.00 |
| 86 | Marking word epoxy (646.5120) | EACH | 11 | $300.00 |
| 87 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $1,900.00 |
| 88 | Marking stop line epoxy 18-inch (646.6120) | LF | 232 | $16.00 |
| 89 | Marking diagonal epoxy 12-inch (646.7120) | LF | 2,250 | $7.50 |
| 90 | Marking chevron epoxy 12-inch (646.7320) | LF | 47 | $16.00 |
| 91 | Marking corrugated median epoxy (646.8020) | SF | 788 | $7.00 |
| 92 | Marking island nose epoxy (646.8220) | EACH | 4 | $325.00 |
| 93 | Marking removal line 4-inch (646.9000) | LF | 16,607 | $0.25 |
| 94 | Marking removal line 8-inch (646.9100) | LF | 1,070 | $0.90 |
| 95 | Marking removal special marking (646.9300) | EACH | 18 | $90.00 |
| 96 | Locating no-passing zones (648.0100) | MI | 15.69 | $175.00 |
| 97 | Construction staking subgrade (650.4500) | LF | 4,006 | $1.00 |
| 98 | Construction staking base (650.5000) | LF | 4,006 | $0.50 |
| 99 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 252 | $2.00 |
| 100 | Construction staking pipe culverts (650.6000) | EACH | 3 | $300.00 |
| 101 | Construction staking resurfacing reference (650.8000) | LF | 82,841 | $0.08 |
| 102 | Construction staking supplemental control (project) 01. 7605-06-62 (650.9911) | EACH | 1 | $1,000.00 |
| 103 | Construction staking slope stakes (650.9920) | LF | 4,006 | $0.75 |
| 104 | Sawing asphalt (690.0150) | LF | 17,176 | $1.08 |
| 105 | Incentive iri ride (740.0440) | DOL | 63,080 | $1.00 |
| 106 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,500 | $5.00 |
| 107 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,520 | $5.00 |
| 108 | Special 01. incentive density PWL HMA pavement (SPV.0055) | DOL | 30,445 | $1.00 |
| 109 | Special 02. incentive air voids HMA pavement (SPV.0055) | DOL | 33,660 | $1.00 |
| 110 | Special 03. incentive density HMA pavement longitudinal joints (SPV.0055) | DOL | 33,136 | $1.00 |
| 111 | Special 01. landmark reference monuments special (SPV.0060) | EACH | 2 | $500.00 |
| 112 | Special 02. adjusting water valves (SPV.0060) | EACH | 2 | $837.13 |
| 113 | Special 03. adjusting sanitary manhole covers (SPV.0060) | EACH | 1 | $663.81 |
| 114 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 15,818 | $4.95 |
| 115 | Special 01. salvaged asphaltic pavement base (SPV.0195) | TON | 7,968 | $21.36 |