WisDOT contract 20250114018 bid tabulation

2225-00-73. Let by Wisconsin DOT on January 14, 2025, Milwaukee. 6 bids received; low bid $4,946,007 by Stark Pavement Corporation.

Owner
Wisconsin DOT
Letting
14 JAN 2025
Pay items
176
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Stark Pavement Corporation$4,946,007Low
2Zignego Company, Inc.$4,986,103+1.0%
3Vinton Construction Company$5,121,805+4.0%
4Rock Road Companies, Inc.$5,214,706+5.0%
5Lalonde Contractors Incorporated$5,396,679+9.0%
6Payne and Dolan, Inc$5,898,747+19%
WisDOT contract 20250114018: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Stark Pavement Corporation2. Zignego Company, Inc.3. Vinton Construction Company4. Rock Road Companies, Inc.5. Lalonde Contractors Incorporated6. Payne and Dolan, Inc
1CPM progress schedule (108.4400)EACH1$6,000.00$1,000.00$4,000.00$0.01$4,940.00$5,335.00
2Grubbing (201.0205)STA9$249.00$249.00$249.00$320.00$249.00$268.92
3Grubbing (201.0220)ID28$11.95$11.95$11.95$10.00$11.95$12.91
4Removing small pipe culverts (203.0100)EACH5$400.00$350.00$166.00$166.00$400.00$179.28
5Removing concrete pavement (204.0100)SY1,653$12.00$1.00$0.01$0.01$15.46$1.00
6Removing asphaltic surface butt joints (204.0115)SY653$11.00$11.00$4.80$4.80$11.00$33.56
7Removing asphaltic surface milling (204.0120)SY49,576$3.98$3.98$1.00$1.00$3.98$4.25
8Removing curb & gutter (204.0150)LF4$125.00$100.00$20.00$20.00$41.92$21.60
9Removing concrete sidewalk (204.0155)SY121$26.50$20.00$27.00$27.00$15.95$29.16
10Removing masonry (204.0185)CY86$60.00$30.00$125.00$125.00$92.94$135.00
11Removing concrete bases (204.0195)EACH1$500.00$1,000.00$1,000.00$1,000.00$929.67$1,080.00
12Removing manholes (204.0210)EACH6$500.00$400.00$341.00$341.00$500.00$368.28
13Removing inlets (204.0220)EACH18$450.00$405.00$217.50$217.50$450.00$234.90
14Removing storm sewer (size) 01. 10-inch (204.0245)LF167$15.00$10.00$13.00$13.00$15.00$14.04
15Removing storm sewer (size) 02. 12-inch (204.0245)LF664$15.00$11.00$13.25$13.25$15.00$14.31
16Removing storm sewer (size) 03. 15-inch (204.0245)LF74$15.00$12.00$13.50$13.50$15.00$14.58
17Removing storm sewer (size) 04. 18-inch (204.0245)LF128$15.00$13.00$18.25$18.25$15.00$19.71
18Removing storm sewer (size) 05. 21-inch (204.0245)LF147$15.00$14.00$19.00$19.00$15.00$20.52
19Removing storm sewer (size) 06. 24-inch (204.0245)LF83$15.00$15.00$23.75$23.75$15.00$25.65
20Removing storm sewer (size) 07. 30-inch (204.0245)LF45$15.00$16.00$26.00$26.00$15.00$28.08
21Removing (item description) 01. removing decorative headwalls (204.9060.S)EACH18$500.00$50.00$100.00$100.00$500.00$108.00
22Excavation common (205.0100)CY2,459$25.00$29.00$49.97$49.97$45.20$53.97
23Backfill granular grade 1 (209.1100)CY180$30.00$50.00$25.00$25.00$66.70$27.00
24Prepare foundation for asphaltic paving (project) 01. 2225-00-73 (211.0101)EACH1$4,000.00$4,000.00$64,807$73,933$4,000.00$92,500
25Finishing roadway (project) 01. 2225-00-73 (213.0100)EACH1$2,000.00$1,000.00$5,000.00$15,721$3,808.00$4,000.00
26Base aggregate dense 3/4-inch (305.0110)TON2,002$24.00$0.01$42.50$42.50$33.28$45.90
27Base aggregate dense 1 1/4-inch (305.0120)TON1,051$27.00$20.00$35.30$35.30$24.23$45.00
28Shaping shoulders (305.0500)STA277$15.00$150.00$57.00$26.33$92.63$100.00
29Base aggregate open-graded (310.0110)TON915$41.00$52.00$40.25$40.25$40.10$43.47
30Breaker run (311.0110)TON2,070$24.00$11.00$31.20$31.20$24.03$33.70
31Tack coat (455.0605)GAL9,078$3.00$3.00$3.52$3.52$3.00$2.30
32Incentive density HMA pavement (460.2000)DOL15,024$1.00$1.00$1.00$1.00$1.00$1.00
33HMA pavement 3 LT 58-28 S (460.5223)TON8,527$78.60$78.60$77.92$77.92$78.60$94.25
34HMA pavement 4 LT 58-28 S (460.5224)TON5,869$78.60$78.60$83.92$83.92$78.60$91.25
35Asphaltic surface (465.0105)TON81$136.40$136.40$231.29$231.29$136.40$345.00
36Asphaltic surface driveways and field entrances (465.0120)TON130$136.40$136.40$184.78$184.78$136.40$345.00
37Concrete collars for pipe (520.8000)EACH32$500.00$750.00$462.50$462.50$500.00$499.50
38Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH1$1,100.00$1,500.00$1,078.00$1,078.00$1,100.00$1,164.24
39Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629)EACH1$2,000.00$2,000.00$1,797.00$1,797.00$2,000.00$1,940.76
40Concrete curb type D (601.0110)LF76$45.00$100.00$50.00$49.53$59.59$54.00
41Concrete curb & gutter 30-inch type D (601.0411)LF176$45.00$75.00$50.00$29.44$56.50$54.00
42Concrete sidewalk 5-inch (602.0410)SF5,749$12.00$13.00$9.00$6.70$10.32$9.72
43Curb ramp detectable warning field natural patina (602.0515)SF468$53.00$50.00$45.00$49.06$41.98$48.60
44Curb ramp detectable warning field radial natural patina (602.0615)SF301$62.00$75.00$55.00$61.62$54.46$59.40
45Riprap medium (606.0200)CY6$120.00$300.00$250.00$250.00$280.60$270.00
46Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF753$90.00$105.00$78.00$78.00$90.00$84.24
47Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF468$95.00$110.00$84.00$84.00$95.00$90.72
48Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF92$110.00$120.00$86.50$86.50$110.00$93.42
49Storm sewer pipe reinforced concrete class III 21-inch (608.0321)LF60$130.00$135.00$104.00$104.00$130.00$112.32
50Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF17$170.00$150.00$109.50$109.50$170.00$118.26
51Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF249$90.00$105.00$78.00$78.00$90.00$84.24
52Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF107$95.00$120.00$84.00$84.00$95.00$90.72
53Storm sewer pipe reinforced concrete class IV 21-inch (608.0421)LF108$130.00$100.00$105.00$105.00$130.00$113.40
54Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 29X45-inch (608.2329)LF35$240.00$350.00$250.00$250.00$240.00$270.00
55Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424)LF301$190.00$305.00$213.00$213.00$190.00$230.04
56Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (608.2429)LF100$240.00$325.00$275.00$275.00$240.00$297.00
57Manhole covers type J (611.0530)EACH3$750.00$450.00$496.00$496.00$750.00$535.68
58Manhole covers type J-special (611.0535)EACH5$1,500.00$450.00$535.00$535.00$1,500.00$577.80
59Inlet covers type C (611.0612)EACH3$760.00$449.00$516.00$516.00$760.00$557.28
60Inlet covers type MS (611.0642)EACH30$700.00$485.00$505.00$505.00$700.00$545.40
61Manholes 4-FT diameter (611.2004)EACH10$2,700.00$2,100.00$3,474.00$3,474.00$2,700.00$3,751.92
62Manholes 5-FT diameter (611.2005)EACH1$4,650.00$2,200.00$5,396.00$5,396.00$4,650.00$5,827.68
63Manholes 6-FT diameter (611.2006)EACH5$6,200.00$2,400.00$6,290.00$6,290.00$6,200.00$6,793.20
64Manholes 7-FT diameter (611.2007)EACH2$8,500.00$3,000.00$7,440.00$7,440.00$8,500.00$8,035.20
65Manholes 5X5-FT (611.2055)EACH1$4,750.00$10,500$6,597.50$6,597.50$4,750.00$7,125.30
66Inlets 4-FT diameter (611.3004)EACH3$2,700.00$2,500.00$2,900.00$2,900.00$2,700.00$3,132.00
67Inlets median 1 grate (611.3901)EACH18$2,800.00$2,600.00$3,193.00$3,193.00$2,800.00$3,448.44
68Inlets median 2 grate (611.3902)EACH11$3,000.00$2,900.00$3,730.50$3,730.50$3,000.00$4,028.94
69Pipe underdrain 6-inch (612.0106)LF3,282$2.80$14.50$3.65$3.65$25.00$3.94
70Pipe underdrain unperforated 6- inch (612.0206)LF172$8.00$50.00$12.65$12.65$25.00$13.66
71Underdrain trench (612.0600)LF172$30.00$50.00$0.01$0.01$25.00$0.01
72Apron endwalls for underdrain reinforced concrete 6-inch (612.0806)EACH20$185.00$1,000.00$156.25$156.25$220.00$168.75
73Fence safety (616.0700.S)LF600$1.00$1.00$1.00$3.90$1.00$1.08
74Maintenance and repair of haul roads (project) 01. 2225-00-73 (618.0100)EACH1$1,000.00$1.00$0.01$0.01$1.00$1,500.00
75Mobilization (619.1000)EACH1$132,000$679,000$370,000$393,938$409,162$287,000
76Dust control surface treatment (623.0200)SY7,085$0.20$0.01$0.01$0.10$0.01$0.25
77Water (624.0100)MGAL42$20.00$50.00$0.01$0.01$54.40$0.01
78Topsoil (625.0100)SY9,226$4.49$4.49$4.49$10.50$4.49$4.85
79Mulching (627.0200)SY9,226$0.01$0.01$0.01$0.32$0.01$0.01
80Erosion bales (628.1104)EACH41$0.50$0.50$0.50$11.50$0.50$0.54
81Silt fence (628.1504)LF1,113$2.15$2.15$2.15$1.75$2.15$2.32
82Silt fence maintenance (628.1520)LF1,113$0.10$0.10$0.10$0.04$0.10$0.11
83Mobilizations erosion control (628.1905)EACH4$100.00$100.00$100.00$200.00$100.00$108.00
84Mobilizations emergency erosion control (628.1910)EACH4$1.00$1.00$1.00$75.00$1.00$1.08
85Erosion mat urban class I type B (628.2008)SY9,226$1.99$1.99$1.99$1.98$1.99$2.15
86Inlet protection type A (628.7005)EACH24$1.00$1.00$1.00$77.50$1.00$1.08
87Inlet protection type B (628.7010)EACH119$70.00$70.00$70.00$39.50$70.00$75.60
88Temporary ditch checks (628.7504)LF214$9.00$9.00$9.00$11.50$9.00$9.72
89Culvert pipe checks (628.7555)EACH436$0.10$0.10$0.10$18.00$0.10$0.11
90Rock bags (628.7570)EACH100$1.00$1.00$1.00$11.50$1.00$1.08
91Fertilizer type B (629.0210)CWT11$80.00$80.00$80.00$77.90$80.00$86.40
92Seeding mixture no. 40 (630.0140)LB172$12.85$12.85$12.85$8.75$12.85$13.88
93Seeding temporary (630.0200)LB68$3.00$3.00$3.00$7.00$3.00$3.24
94Seed water (630.0500)MGAL59$30.00$30.00$30.00$10.00$30.00$32.40
95Posts wood 4X6-inch X 18-FT (634.0618)EACH6$140.00$140.00$140.00$115.00$140.00$151.20
96Posts tubular steel 2X2-inch X 18- FT (634.0818)EACH74$240.00$240.00$240.00$245.00$240.00$259.20
97Signs type II reflective H (637.2210)SF380.27$21.00$21.00$21.00$20.99$21.00$22.68
98Signs type II reflective F (637.2230)SF390.86$23.00$23.00$23.00$24.50$23.00$24.84
99Moving signs type II (638.2102)EACH7$59.00$59.00$59.00$95.00$59.00$63.72
100Removing signs type II (638.2602)EACH71$20.00$20.00$20.00$20.50$20.00$21.60
101Removing small sign supports (638.3000)EACH71$20.00$20.00$20.00$21.00$20.00$21.60
102Field office type B (642.5001)EACH1$13,500$20,000$15,000$22,500$16,068$30,000
103Traffic control drums (643.0300)DAY87,334$0.12$0.12$0.12$0.12$0.12$0.22
104Traffic control barricades type III (643.0420)DAY9,587$0.60$0.60$0.60$0.60$0.60$0.76
105Traffic control warning lights type A (643.0705)DAY19,173$0.10$0.10$0.10$0.10$0.10$0.11
106Traffic control signs (643.0900)DAY36,840$0.40$0.40$0.40$0.40$0.40$0.38
107Traffic control covering signs type II (643.0920)EACH10$50.00$50.00$50.00$50.00$50.00$43.20
108Traffic control signs fixed message (643.1000)SF257$18.50$18.50$18.50$18.50$18.50$21.60
109Traffic control signs PCMS (643.1050)DAY28$30.00$30.00$30.00$30.00$30.00$32.40
110Traffic control (643.5000)EACH1$23,369$23,369$23,369$23,369$23,369$42,784
111Geotextile type DF schedule A (645.0111)SY4,365$1.60$4.00$2.00$2.00$5.00$2.16
112Geotextile type HR (645.0120)SY33$5.00$10.00$10.00$10.00$11.62$10.80
113Geogrid type SR (645.0220)SY850$3.20$5.00$3.00$3.00$2.97$3.24
114Marking line epoxy 4-inch (646.1020)LF36,244$0.65$0.65$0.65$0.65$0.65$0.70
115Marking line epoxy 8-inch (646.3020)LF1,039$1.30$1.30$1.30$1.30$1.30$1.40
116Marking arrow epoxy (646.5020)EACH15$220.00$220.00$220.00$220.00$220.00$237.60
117Marking outfall epoxy (646.5520)EACH22$65.00$65.00$65.00$65.00$65.00$70.20
118Marking stop line epoxy 18-inch (646.6120)LF622$13.00$13.00$13.00$13.00$13.00$14.04
119Marking diagonal epoxy 12-inch (646.7120)LF851$9.50$9.50$9.50$9.50$9.50$10.26
120Marking crosswalk epoxy transverse line 6-inch (646.7420)LF656$10.50$10.50$10.50$10.50$10.50$11.34
121Marking crosswalk epoxy block style 24-inch (646.7520)LF798$17.50$17.50$17.50$17.50$17.50$18.90
122Construction staking storm sewer (650.4000)EACH48$115.00$115.00$115.00$115.00$115.00$124.20
123Construction staking subgrade (650.4500)LF3,337$0.01$0.01$0.01$0.01$0.01$0.01
124Construction staking base (650.5000)LF3,337$0.01$1.25$1.25$0.01$0.01$1.35
125Construction staking curb gutter and curb & gutter (650.5500)LF251$1.25$1.25$1.25$1.25$1.25$1.35
126Construction staking resurfacing reference (650.8000)LF13,817$0.15$0.15$0.15$0.15$0.15$0.16
127Construction staking curb ramps (650.9000)EACH55$125.00$125.00$125.00$125.00$125.00$135.00
128Construction staking supplemental control (project) 01. 2225-00-73 (650.9911)EACH1$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00$2,700.00
129Construction staking slope stakes (650.9920)LF3,337$0.70$0.70$0.70$0.70$0.70$0.76
130Sawing asphalt (690.0150)LF13,013$1.39$1.39$1.39$1.56$1.75$1.51
131Sawing concrete (690.0250)LF4,023$3.50$3.50$3.50$2.50$5.00$6.05
132Incentive iri ride (740.0440)DOL5,234$1.00$1.00$1.00$1.00$1.00$1.00
133On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,000$5.00$5.00$5.00$5.00$5.00$5.00
134On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,400$5.00$5.00$5.00$5.00$5.00$5.00
135Special 01. temporary pedestrian crossings (SPV.0060)EACH20$6,320.00$806.89$2,800.00$2,800.00$5,230.42$8,695.36
136Special 02. utility line opening (SPV.0060)EACH24$950.00$0.01$925.00$925.00$1,200.00$999.00
137Special 03. concrete base special (SPV.0060)EACH1$3,283.50$3,283.50$2,700.00$3,283.50$2,700.00$3,546.18
138Special 31. pipe connection to existing structure (SPV.0060)EACH5$600.00$650.00$855.00$855.00$600.00$923.40
139Special 32. manhole covers special (SPV.0060)EACH8$800.00$400.00$503.00$503.00$800.00$543.24
140Special 33. inlet covers special (SPV.0060)EACH5$780.00$300.00$484.00$484.00$780.00$522.72
141Special 40. hydrant assembly with 6-inch gate valve (SPV.0060)EACH27$8,650.00$8,100.00$11,330$11,330$8,650.00$12,236
142Special 41. 8-inch gate valve and valve box (SPV.0060)EACH14$2,750.00$2,500.00$3,055.00$3,055.00$2,750.00$3,299.40
143Special 42. 12-inch gate valve and valve box (SPV.0060)EACH24$7,100.00$4,500.00$7,000.00$7,000.00$7,100.00$7,560.00
144Special 43. 1.25-inch corporation stop (SPV.0060)EACH42$630.00$650.00$1,974.00$1,974.00$630.00$2,131.92
145Special 44. 1.5-inch corporation stop (SPV.0060)EACH1$600.00$750.00$2,161.50$2,161.50$600.00$2,334.42
146Special 45. 2-inch corporation stop (SPV.0060)EACH1$725.00$850.00$2,307.00$2,307.00$725.00$2,491.56
147Special 46. 1.25-inch curb box (SPV.0060)EACH42$380.00$350.00$1,743.00$1,743.00$380.00$1,882.44
148Special 47. 1.5-inch curb box (SPV.0060)EACH1$500.00$400.00$1,530.00$1,530.00$500.00$1,652.40
149Special 48. 2-inch curb box (SPV.0060)EACH1$650.00$500.00$1,671.00$1,671.00$650.00$1,804.68
150Special 49. cap and abandon existing water main (SPV.0060)EACH21$2,000.00$1,500.00$333.35$333.35$2,000.00$360.02
151Special 50. adjusting sanitary manhole (SPV.0060)EACH6$900.00$425.00$1,368.00$1,368.00$900.00$1,477.44
152Special 51. adjusting water valve boxes (SPV.0060)EACH10$800.00$150.00$475.00$475.00$800.00$513.00
153Special 61. RRFB system STH 32 NB at barnett LN assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
154Special 62. RRFB system STH 32 SB at holly CT assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
155Special 63. RRFB system STH 32 NB at green tree RD assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
156Special 64. RRFB system STH 32 SB at green tree RD assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
157Special 65. RRFB system STH 32 NB at bridge LN assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
158Special 66. RRFB system STH 32 SB at bridge LN assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
159Special 67. RRFB system STH 32 NB at beach DR assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
160Special 68. RRFB system STH 32 SB at beach DR assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
161Special 69. RRFB system STH 32 NB at fox LN assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
162Special 70. RRFB system STH 32 SB at fox LN assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
163Special 71. RRFB system STH 32 NB at dean RD assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
164Special 72. RRFB system STH 32 SB at dean RD assembly (SPV.0060)EACH1$10,053$10,053$10,053$10,053$10,053$10,857
165Special 01. pavement cleanup project 2225-00-73 (SPV.0075)HRS40$250.00$250.00$250.00$250.00$250.00$250.00
166Special 01. concrete ditch bottoms (SPV.0090)LF99$75.00$100.00$75.00$110.63$67.53$64.80
167Special 31. pipe underdrain exploration (SPV.0090)LF100$25.00$50.00$10.60$10.60$25.00$11.45
168Special 32. storm sewer lateral exploation (SPV.0090)LF100$25.00$50.00$10.60$10.60$25.00$11.45
169Special 40. hydrant lead 6-inch (SPV.0090)LF490$100.00$105.00$80.25$80.25$100.00$86.67
170Special 41. PVC water main 6-inch (SPV.0090)LF166$340.00$110.00$224.00$224.00$340.00$241.92
171Special 42. PVC water main 8-inch (SPV.0090)LF1,761$150.00$145.00$196.00$196.00$150.00$211.68
172Special 43. PVC water main 12- inch (SPV.0090)LF2,435$270.00$155.00$229.50$229.50$270.00$247.86
173Special 44. HDPE water service 1.25-inch (SPV.0090)LF1,668$115.00$105.00$38.00$38.00$115.00$41.04
174Special 45. HDPE water service 1. 5-inch (SPV.0090)LF26$120.00$135.00$47.50$47.50$120.00$51.30
175Special 46. HDPE water service 2- inch (SPV.0090)LF55$140.00$150.00$69.75$69.75$140.00$75.33
176Special 01. management of solid waste (SPV.0195)TON125$135.00$100.00$150.00$150.00$134.44$162.00
WisDOT contract 20250114018: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way