WisDOT contract 20250114040 bid tabulation

C Hudson, 11th St & 11th St S; Coulee Rd to Wisconsin St (LOC STR, St Croix County C Hudson, 11th St & 11th St S). Let by Wisconsin DOT on January 14, 2025, St Croix. 5 bids received; low bid $1,573,356 by A-1 Excavating LLC.

Owner
Wisconsin DOT
Letting
14 JAN 2025
Pay items
123
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1A-1 Excavating LLC$1,573,356Low
2Total Excavating and Grading LLC$1,574,3440.0%
3McCabe Construction, Inc.$1,597,284+2.0%
4Pember Companies, Inc.$1,614,580+3.0%
5Haas Sons, Inc.$1,689,679+7.0%
WisDOT contract 20250114040: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. A-1 Excavating LLC2. Total Excavating and Grading LLC3. McCabe Construction, Inc.4. Pember Companies, Inc.5. Haas Sons, Inc.
1Clearing (201.0105)STA8$500.00$980.00$1,500.00$1,375.00$850.00
2Grubbing (201.0205)STA8$1,300.00$660.00$1,030.00$425.00$1,250.00
3Removing concrete pavement (204.0100)SY150$18.00$14.00$9.00$1.90$20.00
4Removing curb & gutter (204.0150)LF5,620$3.50$4.50$5.00$4.60$4.50
5Removing concrete sidewalk (204.0155)SY100$16.00$6.50$11.25$15.20$20.00
6Removing manholes (204.0210)EACH5$700.00$485.00$550.00$610.00$650.00
7Removing inlets (204.0220)EACH9$500.00$350.00$235.00$455.00$650.00
8Removing storm sewer (size) 01. 12-inch (204.0245)LF247$18.00$12.00$20.00$17.35$35.00
9Excavation common (205.0100)CY5,551$18.00$9.00$19.00$29.60$14.93
10Prepare foundation for asphaltic paving (project) 01. 8999-00-87 (211.0101)EACH1$15,000$28,000$25,000$42,650$25,600
11Prepare foundation for base aggregate (211.0500)STA34$440.00$450.00$215.00$330.00$236.00
12Finishing roadway (project) 01. 8999-00-87 (213.0100)EACH1$1,000.00$1,100.00$3,000.00$500.00$1.00
13Base aggregate dense 3/4-inch (305.0110)TON20$29.00$19.00$28.00$35.25$40.00
14Base aggregate dense 1 1/4-inch (305.0120)TON235$22.00$17.00$21.00$40.50$30.00
15Tack coat (455.0605)GAL670$3.50$3.70$3.30$3.45$3.30
16Incentive density HMA pavement (460.2000)DOL2,010$1.00$1.00$1.00$1.00$1.00
17HMA pavement 5 LT 58-34 S (460.5245)TON430$125.00$133.00$120.00$126.00$120.00
18HMA pavement 3 MT 58-28 S (460.6223)TON1,620$104.00$109.00$97.97$102.80$97.91
19HMA pavement 5 MT 58-34 H (460.6445)TON1,080$120.00$128.00$115.68$121.45$115.68
20Asphaltic surface driveways and field entrances (465.0120)TON40$190.00$196.00$176.59$185.40$176.59
21Concrete curb & gutter 18-inch type D (601.0407)LF20$75.00$24.00$70.00$34.45$34.45
22Concrete curb & gutter 30-inch type D (601.0411)LF5,775$20.00$20.00$18.75$18.75$18.75
23Concrete curb pedestrian (601.0600)LF101$50.00$24.00$45.00$33.25$33.25
24Concrete sidewalk 4-inch (602.0405)SF4,180$9.00$6.35$8.25$5.95$5.95
25Concrete sidewalk 6-inch (602.0415)SF690$9.50$12.40$8.80$8.50$8.50
26Curb ramp detectable warning field yellow (602.0505)SF258$58.00$78.00$55.00$52.80$52.80
27Curb ramp detectable warning field radial yellow (602.0605)SF92.52$73.00$78.00$70.00$61.60$61.60
28Concrete driveway 6-inch (602.0810)SY379$77.00$85.00$74.00$70.60$70.60
29Concrete driveway 7-inch (602.0815)SY123$79.00$99.00$75.50$90.40$90.40
30Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF47$98.00$70.00$75.00$70.85$98.00
31Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF20$98.00$70.00$85.00$70.85$98.00
32Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF225$84.00$78.00$75.00$75.90$103.50
33Manhole covers type J (611.0530)EACH6$1,000.00$600.00$900.00$1,020.00$1,200.00
34Inlet covers type H (611.0624)EACH11$1,250.00$825.00$900.00$1,010.00$1,050.00
35Manholes 4-FT diameter (611.2004)EACH3$3,200.00$3,100.00$3,100.00$3,115.00$3,800.00
36Manholes 5-FT diameter (611.2005)EACH1$5,600.00$4,800.00$5,000.00$4,800.00$5,400.00
37Manholes 6-FT diameter (611.2006)EACH2$13,100$7,300.00$6,800.00$7,100.00$7,900.00
38Inlets 4-FT diameter (611.3004)EACH1$3,500.00$3,100.00$3,150.00$3,135.00$3,800.00
39Inlets 2X3-FT (611.3230)EACH10$2,000.00$1,860.00$2,000.00$2,120.00$2,700.00
40Adjusting manhole covers (611.8110)EACH6$600.00$485.00$675.00$735.00$1,250.00
41Adjusting inlet covers (611.8115)EACH5$600.00$485.00$500.00$775.00$1,250.00
42Insulation board polystyrene (inch) 01. 4-inch (612.0902.S)SY25$60.00$85.00$41.00$61.70$44.50
43Maintenance and repair of haul roads (project) 01. 8999-00-87 (618.0100)EACH1$100.00$1,100.00$1.00$500.00$1.00
44Mobilization (619.1000)EACH1$112,000$115,000$115,000$99,500$251,505
45Water (624.0100)MGAL94.30$35.00$36.00$42.00$75.00$60.00
46Topsoil (625.0100)SY3,200$6.00$5.25$10.00$13.20$7.94
47Silt fence (628.1504)LF2,200$1.85$1.95$1.75$1.85$1.75
48Silt fence maintenance (628.1520)LF2,200$0.01$0.02$0.01$0.01$0.01
49Mobilizations erosion control (628.1905)EACH6$105.00$115.00$100.00$100.00$100.00
50Mobilizations emergency erosion control (628.1910)EACH3$53.00$100.00$50.00$50.00$50.00
51Erosion mat urban class I type B (628.2008)SY2,000$1.80$1.90$1.70$1.80$1.70
52Soil stabilizer type A (628.6505)ACRE0.35$8,000.00$8,400.00$7,600.00$7,975.00$7,600.00
53Inlet protection type A (628.7005)EACH29$105.00$115.00$100.00$100.00$100.00
54Inlet protection type C (628.7015)EACH18$46.00$50.00$43.00$45.00$43.00
55Tracking pads (628.7560)EACH2$100.00$1,700.00$2,500.00$1,400.00$500.00
56Fertilizer type B (629.0210)CWT3$126.00$130.00$120.00$125.00$120.00
57Seeding mixture no. 40 (630.0140)LB55$19.00$20.00$17.50$18.40$17.50
58Seeding temporary (630.0200)LB80$3.00$3.30$3.00$3.00$3.00
59Seed water (630.0500)MGAL165$0.01$0.02$0.01$0.01$0.01
60Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH14$265.00$280.00$251.00$265.00$251.00
61Posts tubular steel 2X2-inch X 16- FT (634.0816)EACH13$285.00$300.00$269.00$270.00$269.00
62Posts tubular steel 2X2-inch X 18- FT (634.0818)EACH4$300.00$315.00$285.00$300.00$285.00
63Signs type II reflective H (637.2210)SF155.38$17.00$17.70$15.90$16.75$15.90
64Signs type II reflective F (637.2230)SF103$20.00$21.10$18.95$19.85$18.95
65Moving signs type II (638.2102)EACH1$80.00$83.50$75.00$78.80$75.00
66Removing signs type II (638.2602)EACH74$16.00$16.70$15.00$15.80$15.00
67Removing small sign supports (638.3000)EACH37$16.00$16.70$15.00$15.80$15.00
68Moving small sign supports (638.4000)EACH1$80.00$83.50$75.00$80.00$75.00
69Field office type B (642.5001)EACH1$9,000.00$15,500$10,000$9,500.00$26,800
70Traffic control barricades type II (643.0410)DAY330$0.50$1.15$0.30$0.30$0.30
71Traffic control barricades type III (643.0420)DAY650$0.70$1.70$0.55$0.60$0.55
72Traffic control warning lights type A (643.0705)DAY1,620$0.10$0.30$0.08$0.10$0.08
73Traffic control signs (643.0900)DAY10,860$0.50$0.55$0.43$0.45$0.43
74Traffic control signs fixed message (643.1000)SF36$11.50$22.25$10.90$11.55$10.90
75Traffic control (643.5000)EACH1$5,500.00$4,100.00$1,975.00$5,000.00$4,475.00
76Marking line grooved wet ref epoxy 4-inch (646.1040)LF5,850$2.10$2.20$1.99$2.10$1.99
77Marking line epoxy 10-inch (646.4020)LF125$3.75$4.00$3.50$3.70$3.50
78Marking arrow epoxy (646.5020)EACH4$375.00$390.00$350.00$370.00$350.00
79Marking word epoxy (646.5120)EACH16$325.00$332.00$299.00$320.00$299.00
80Marking stop line epoxy 18-inch (646.6120)LF62$20.00$20.00$18.00$19.10$18.00
81Marking crosswalk epoxy transverse line 6-inch (646.7420)LF480$15.00$15.50$14.00$14.75$14.00
82Marking crosswalk epoxy block style 24-inch (646.7520)LF300$20.00$21.15$19.00$20.20$19.00
83Marking curb epoxy (646.8120)LF400$8.00$7.80$7.00$7.40$7.00
84Construction staking storm sewer (650.4000)EACH17$205.00$225.00$200.00$210.00$200.00
85Construction staking subgrade (650.4500)LF1,790$0.01$1.00$0.01$0.75$1.50
86Construction staking base (650.5000)LF3,334$0.55$1.00$0.50$0.55$0.50
87Construction staking curb gutter and curb & gutter (650.5500)LF5,930$1.00$1.00$0.80$0.90$0.80
88Construction staking resurfacing reference (650.8000)LF1,542$0.10$0.25$0.10$0.10$0.10
89Construction staking curb ramps (650.9000)EACH25$55.00$60.00$50.00$50.00$50.00
90Construction staking sidewalk (project) 01. 8999-00-87 (650.9500)EACH1$1,100.00$3,500.00$1,000.00$1,050.00$1,000.00
91Construction staking supplemental control (project) 01. 8999-00-87 (650.9911)EACH1$1,100.00$1,100.00$1,000.00$1,050.00$1,000.00
92Construction staking slope stakes (650.9920)LF3,334$0.90$1.00$0.75$0.85$0.75
93Sawing asphalt (690.0150)LF1,069$2.00$2.00$1.95$2.35$1.95
94Sawing concrete (690.0250)LF365$4.00$3.25$2.95$3.35$2.95
95Incentive iri ride (740.0440)DOL1,262.88$1.00$1.00$1.00$1.00$1.00
96On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS800$5.00$5.00$5.00$5.00$5.00
97On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00$5.00
98Special 01. adjust frame & ring casting (SPV.0060)EACH12$600.00$500.00$750.00$945.00$1,000.00
99Special 02. salvaged and install hydrant and valve box (SPV.0060)EACH2$3,250.00$1,800.00$3,100.00$2,700.00$2,650.00
100Special 03. remove gate valve & box (SPV.0060)EACH4$300.00$400.00$130.00$150.00$700.00
101Special 04. connect to existing water main (SPV.0060)EACH2$2,950.00$1,600.00$2,250.00$2,600.00$6,050.00
102Special 05. 45° bend 8-inch (SPV.0060)EACH4$1,250.00$800.00$550.00$835.00$1,000.00
103Special 06. gate valve 8-inch (SPV.0060)EACH4$3,850.00$3,800.00$3,000.00$3,535.00$3,850.00
104Special 07. tee 8-inch X 6-inch (SPV.0060)EACH3$1,700.00$1,200.00$850.00$1,190.00$1,550.00
105Special 08. hydrant (SPV.0060)EACH1$6,675.00$6,500.00$5,850.00$6,600.00$6,650.00
106Special 09. gate valve 6-inch (SPV.0060)EACH1$2,850.00$2,800.00$2,350.00$2,665.00$3,000.00
107Special 10. curb stop 1-inch (SPV.0060)EACH33$440.00$775.00$350.00$530.00$575.00
108Special 11. corp stop 1-inch (SPV.0060)EACH33$300.00$300.00$185.00$350.00$350.00
109Special 12. watermain testing (SPV.0060)EACH1$1,500.00$5,500.00$4,200.00$1,700.00$3,000.00
110Special 13. temporary water (SPV.0060)EACH1$10,000$10,200$15,500$17,050$32,000
111Special 14. adjusting water valve (SPV.0060)EACH12$250.00$250.00$275.00$195.00$775.00
112Special 15. connect to existing storm sewer (SPV.0060)EACH15$1,500.00$650.00$1,150.00$1,010.00$725.00
113Special 16. remove, salvage, and reinstall modular block retaining wall (SPV.0060)EACH1$1,500.00$1,580.00$1,420.00$1,490.00$2,670.00
114Special 17. street name sign (SPV.0060)EACH20$140.00$150.00$133.00$140.00$133.00
115Special 18. remove block (SPV.0060)EACH1$1,500.00$830.00$750.00$785.00$750.00
116Special 01. remove watermain (SPV.0090)LF1,321$8.00$7.00$15.00$5.70$12.00
117Special 02. remove water service (SPV.0090)LF783$8.00$9.00$1.00$3.85$5.00
118Special 03. ductile iron water main 8-inch (SPV.0090)LF1,299$86.00$80.00$94.00$92.50$101.00
119Special 04. ductile iron water main 6-inch (SPV.0090)LF44$82.00$90.00$75.00$82.00$86.00
120Special 05. copper pipe 1-inch (SPV.0090)LF783$70.00$45.00$100.00$64.05$122.00
121Special 06. concrete valley gutter (SPV.0090)LF96$40.00$72.00$38.00$38.40$38.40
122Special 01. pulverized base (SPV.0195)TON4,810$18.00$27.50$21.00$13.00$0.01
123Special 02. pulverized base (SPV.0195)TON1,205$18.00$27.50$27.00$18.00$0.01
WisDOT contract 20250114040: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy