WisDOT contract 20250114040 bid tabulation
C Hudson, 11th St & 11th St S; Coulee Rd to Wisconsin St (LOC STR, St Croix County C Hudson, 11th St & 11th St S). Let by Wisconsin DOT on January 14, 2025, St Croix. 5 bids received; low bid $1,573,356 by A-1 Excavating LLC.
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 123
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A-1 Excavating LLC | $1,573,356 | Low |
| 2 | Total Excavating and Grading LLC | $1,574,344 | 0.0% |
| 3 | McCabe Construction, Inc. | $1,597,284 | +2.0% |
| 4 | Pember Companies, Inc. | $1,614,580 | +3.0% |
| 5 | Haas Sons, Inc. | $1,689,679 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A-1 Excavating LLC | 2. Total Excavating and Grading LLC | 3. McCabe Construction, Inc. | 4. Pember Companies, Inc. | 5. Haas Sons, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 8 | $500.00 | $980.00 | $1,500.00 | $1,375.00 | $850.00 |
| 2 | Grubbing (201.0205) | STA | 8 | $1,300.00 | $660.00 | $1,030.00 | $425.00 | $1,250.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 150 | $18.00 | $14.00 | $9.00 | $1.90 | $20.00 |
| 4 | Removing curb & gutter (204.0150) | LF | 5,620 | $3.50 | $4.50 | $5.00 | $4.60 | $4.50 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 100 | $16.00 | $6.50 | $11.25 | $15.20 | $20.00 |
| 6 | Removing manholes (204.0210) | EACH | 5 | $700.00 | $485.00 | $550.00 | $610.00 | $650.00 |
| 7 | Removing inlets (204.0220) | EACH | 9 | $500.00 | $350.00 | $235.00 | $455.00 | $650.00 |
| 8 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 247 | $18.00 | $12.00 | $20.00 | $17.35 | $35.00 |
| 9 | Excavation common (205.0100) | CY | 5,551 | $18.00 | $9.00 | $19.00 | $29.60 | $14.93 |
| 10 | Prepare foundation for asphaltic paving (project) 01. 8999-00-87 (211.0101) | EACH | 1 | $15,000 | $28,000 | $25,000 | $42,650 | $25,600 |
| 11 | Prepare foundation for base aggregate (211.0500) | STA | 34 | $440.00 | $450.00 | $215.00 | $330.00 | $236.00 |
| 12 | Finishing roadway (project) 01. 8999-00-87 (213.0100) | EACH | 1 | $1,000.00 | $1,100.00 | $3,000.00 | $500.00 | $1.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 20 | $29.00 | $19.00 | $28.00 | $35.25 | $40.00 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 235 | $22.00 | $17.00 | $21.00 | $40.50 | $30.00 |
| 15 | Tack coat (455.0605) | GAL | 670 | $3.50 | $3.70 | $3.30 | $3.45 | $3.30 |
| 16 | Incentive density HMA pavement (460.2000) | DOL | 2,010 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 17 | HMA pavement 5 LT 58-34 S (460.5245) | TON | 430 | $125.00 | $133.00 | $120.00 | $126.00 | $120.00 |
| 18 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 1,620 | $104.00 | $109.00 | $97.97 | $102.80 | $97.91 |
| 19 | HMA pavement 5 MT 58-34 H (460.6445) | TON | 1,080 | $120.00 | $128.00 | $115.68 | $121.45 | $115.68 |
| 20 | Asphaltic surface driveways and field entrances (465.0120) | TON | 40 | $190.00 | $196.00 | $176.59 | $185.40 | $176.59 |
| 21 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 20 | $75.00 | $24.00 | $70.00 | $34.45 | $34.45 |
| 22 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 5,775 | $20.00 | $20.00 | $18.75 | $18.75 | $18.75 |
| 23 | Concrete curb pedestrian (601.0600) | LF | 101 | $50.00 | $24.00 | $45.00 | $33.25 | $33.25 |
| 24 | Concrete sidewalk 4-inch (602.0405) | SF | 4,180 | $9.00 | $6.35 | $8.25 | $5.95 | $5.95 |
| 25 | Concrete sidewalk 6-inch (602.0415) | SF | 690 | $9.50 | $12.40 | $8.80 | $8.50 | $8.50 |
| 26 | Curb ramp detectable warning field yellow (602.0505) | SF | 258 | $58.00 | $78.00 | $55.00 | $52.80 | $52.80 |
| 27 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 92.52 | $73.00 | $78.00 | $70.00 | $61.60 | $61.60 |
| 28 | Concrete driveway 6-inch (602.0810) | SY | 379 | $77.00 | $85.00 | $74.00 | $70.60 | $70.60 |
| 29 | Concrete driveway 7-inch (602.0815) | SY | 123 | $79.00 | $99.00 | $75.50 | $90.40 | $90.40 |
| 30 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 47 | $98.00 | $70.00 | $75.00 | $70.85 | $98.00 |
| 31 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 20 | $98.00 | $70.00 | $85.00 | $70.85 | $98.00 |
| 32 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 225 | $84.00 | $78.00 | $75.00 | $75.90 | $103.50 |
| 33 | Manhole covers type J (611.0530) | EACH | 6 | $1,000.00 | $600.00 | $900.00 | $1,020.00 | $1,200.00 |
| 34 | Inlet covers type H (611.0624) | EACH | 11 | $1,250.00 | $825.00 | $900.00 | $1,010.00 | $1,050.00 |
| 35 | Manholes 4-FT diameter (611.2004) | EACH | 3 | $3,200.00 | $3,100.00 | $3,100.00 | $3,115.00 | $3,800.00 |
| 36 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $5,600.00 | $4,800.00 | $5,000.00 | $4,800.00 | $5,400.00 |
| 37 | Manholes 6-FT diameter (611.2006) | EACH | 2 | $13,100 | $7,300.00 | $6,800.00 | $7,100.00 | $7,900.00 |
| 38 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $3,500.00 | $3,100.00 | $3,150.00 | $3,135.00 | $3,800.00 |
| 39 | Inlets 2X3-FT (611.3230) | EACH | 10 | $2,000.00 | $1,860.00 | $2,000.00 | $2,120.00 | $2,700.00 |
| 40 | Adjusting manhole covers (611.8110) | EACH | 6 | $600.00 | $485.00 | $675.00 | $735.00 | $1,250.00 |
| 41 | Adjusting inlet covers (611.8115) | EACH | 5 | $600.00 | $485.00 | $500.00 | $775.00 | $1,250.00 |
| 42 | Insulation board polystyrene (inch) 01. 4-inch (612.0902.S) | SY | 25 | $60.00 | $85.00 | $41.00 | $61.70 | $44.50 |
| 43 | Maintenance and repair of haul roads (project) 01. 8999-00-87 (618.0100) | EACH | 1 | $100.00 | $1,100.00 | $1.00 | $500.00 | $1.00 |
| 44 | Mobilization (619.1000) | EACH | 1 | $112,000 | $115,000 | $115,000 | $99,500 | $251,505 |
| 45 | Water (624.0100) | MGAL | 94.30 | $35.00 | $36.00 | $42.00 | $75.00 | $60.00 |
| 46 | Topsoil (625.0100) | SY | 3,200 | $6.00 | $5.25 | $10.00 | $13.20 | $7.94 |
| 47 | Silt fence (628.1504) | LF | 2,200 | $1.85 | $1.95 | $1.75 | $1.85 | $1.75 |
| 48 | Silt fence maintenance (628.1520) | LF | 2,200 | $0.01 | $0.02 | $0.01 | $0.01 | $0.01 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 6 | $105.00 | $115.00 | $100.00 | $100.00 | $100.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $53.00 | $100.00 | $50.00 | $50.00 | $50.00 |
| 51 | Erosion mat urban class I type B (628.2008) | SY | 2,000 | $1.80 | $1.90 | $1.70 | $1.80 | $1.70 |
| 52 | Soil stabilizer type A (628.6505) | ACRE | 0.35 | $8,000.00 | $8,400.00 | $7,600.00 | $7,975.00 | $7,600.00 |
| 53 | Inlet protection type A (628.7005) | EACH | 29 | $105.00 | $115.00 | $100.00 | $100.00 | $100.00 |
| 54 | Inlet protection type C (628.7015) | EACH | 18 | $46.00 | $50.00 | $43.00 | $45.00 | $43.00 |
| 55 | Tracking pads (628.7560) | EACH | 2 | $100.00 | $1,700.00 | $2,500.00 | $1,400.00 | $500.00 |
| 56 | Fertilizer type B (629.0210) | CWT | 3 | $126.00 | $130.00 | $120.00 | $125.00 | $120.00 |
| 57 | Seeding mixture no. 40 (630.0140) | LB | 55 | $19.00 | $20.00 | $17.50 | $18.40 | $17.50 |
| 58 | Seeding temporary (630.0200) | LB | 80 | $3.00 | $3.30 | $3.00 | $3.00 | $3.00 |
| 59 | Seed water (630.0500) | MGAL | 165 | $0.01 | $0.02 | $0.01 | $0.01 | $0.01 |
| 60 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 14 | $265.00 | $280.00 | $251.00 | $265.00 | $251.00 |
| 61 | Posts tubular steel 2X2-inch X 16- FT (634.0816) | EACH | 13 | $285.00 | $300.00 | $269.00 | $270.00 | $269.00 |
| 62 | Posts tubular steel 2X2-inch X 18- FT (634.0818) | EACH | 4 | $300.00 | $315.00 | $285.00 | $300.00 | $285.00 |
| 63 | Signs type II reflective H (637.2210) | SF | 155.38 | $17.00 | $17.70 | $15.90 | $16.75 | $15.90 |
| 64 | Signs type II reflective F (637.2230) | SF | 103 | $20.00 | $21.10 | $18.95 | $19.85 | $18.95 |
| 65 | Moving signs type II (638.2102) | EACH | 1 | $80.00 | $83.50 | $75.00 | $78.80 | $75.00 |
| 66 | Removing signs type II (638.2602) | EACH | 74 | $16.00 | $16.70 | $15.00 | $15.80 | $15.00 |
| 67 | Removing small sign supports (638.3000) | EACH | 37 | $16.00 | $16.70 | $15.00 | $15.80 | $15.00 |
| 68 | Moving small sign supports (638.4000) | EACH | 1 | $80.00 | $83.50 | $75.00 | $80.00 | $75.00 |
| 69 | Field office type B (642.5001) | EACH | 1 | $9,000.00 | $15,500 | $10,000 | $9,500.00 | $26,800 |
| 70 | Traffic control barricades type II (643.0410) | DAY | 330 | $0.50 | $1.15 | $0.30 | $0.30 | $0.30 |
| 71 | Traffic control barricades type III (643.0420) | DAY | 650 | $0.70 | $1.70 | $0.55 | $0.60 | $0.55 |
| 72 | Traffic control warning lights type A (643.0705) | DAY | 1,620 | $0.10 | $0.30 | $0.08 | $0.10 | $0.08 |
| 73 | Traffic control signs (643.0900) | DAY | 10,860 | $0.50 | $0.55 | $0.43 | $0.45 | $0.43 |
| 74 | Traffic control signs fixed message (643.1000) | SF | 36 | $11.50 | $22.25 | $10.90 | $11.55 | $10.90 |
| 75 | Traffic control (643.5000) | EACH | 1 | $5,500.00 | $4,100.00 | $1,975.00 | $5,000.00 | $4,475.00 |
| 76 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 5,850 | $2.10 | $2.20 | $1.99 | $2.10 | $1.99 |
| 77 | Marking line epoxy 10-inch (646.4020) | LF | 125 | $3.75 | $4.00 | $3.50 | $3.70 | $3.50 |
| 78 | Marking arrow epoxy (646.5020) | EACH | 4 | $375.00 | $390.00 | $350.00 | $370.00 | $350.00 |
| 79 | Marking word epoxy (646.5120) | EACH | 16 | $325.00 | $332.00 | $299.00 | $320.00 | $299.00 |
| 80 | Marking stop line epoxy 18-inch (646.6120) | LF | 62 | $20.00 | $20.00 | $18.00 | $19.10 | $18.00 |
| 81 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 480 | $15.00 | $15.50 | $14.00 | $14.75 | $14.00 |
| 82 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 300 | $20.00 | $21.15 | $19.00 | $20.20 | $19.00 |
| 83 | Marking curb epoxy (646.8120) | LF | 400 | $8.00 | $7.80 | $7.00 | $7.40 | $7.00 |
| 84 | Construction staking storm sewer (650.4000) | EACH | 17 | $205.00 | $225.00 | $200.00 | $210.00 | $200.00 |
| 85 | Construction staking subgrade (650.4500) | LF | 1,790 | $0.01 | $1.00 | $0.01 | $0.75 | $1.50 |
| 86 | Construction staking base (650.5000) | LF | 3,334 | $0.55 | $1.00 | $0.50 | $0.55 | $0.50 |
| 87 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 5,930 | $1.00 | $1.00 | $0.80 | $0.90 | $0.80 |
| 88 | Construction staking resurfacing reference (650.8000) | LF | 1,542 | $0.10 | $0.25 | $0.10 | $0.10 | $0.10 |
| 89 | Construction staking curb ramps (650.9000) | EACH | 25 | $55.00 | $60.00 | $50.00 | $50.00 | $50.00 |
| 90 | Construction staking sidewalk (project) 01. 8999-00-87 (650.9500) | EACH | 1 | $1,100.00 | $3,500.00 | $1,000.00 | $1,050.00 | $1,000.00 |
| 91 | Construction staking supplemental control (project) 01. 8999-00-87 (650.9911) | EACH | 1 | $1,100.00 | $1,100.00 | $1,000.00 | $1,050.00 | $1,000.00 |
| 92 | Construction staking slope stakes (650.9920) | LF | 3,334 | $0.90 | $1.00 | $0.75 | $0.85 | $0.75 |
| 93 | Sawing asphalt (690.0150) | LF | 1,069 | $2.00 | $2.00 | $1.95 | $2.35 | $1.95 |
| 94 | Sawing concrete (690.0250) | LF | 365 | $4.00 | $3.25 | $2.95 | $3.35 | $2.95 |
| 95 | Incentive iri ride (740.0440) | DOL | 1,262.88 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 96 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 97 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 98 | Special 01. adjust frame & ring casting (SPV.0060) | EACH | 12 | $600.00 | $500.00 | $750.00 | $945.00 | $1,000.00 |
| 99 | Special 02. salvaged and install hydrant and valve box (SPV.0060) | EACH | 2 | $3,250.00 | $1,800.00 | $3,100.00 | $2,700.00 | $2,650.00 |
| 100 | Special 03. remove gate valve & box (SPV.0060) | EACH | 4 | $300.00 | $400.00 | $130.00 | $150.00 | $700.00 |
| 101 | Special 04. connect to existing water main (SPV.0060) | EACH | 2 | $2,950.00 | $1,600.00 | $2,250.00 | $2,600.00 | $6,050.00 |
| 102 | Special 05. 45° bend 8-inch (SPV.0060) | EACH | 4 | $1,250.00 | $800.00 | $550.00 | $835.00 | $1,000.00 |
| 103 | Special 06. gate valve 8-inch (SPV.0060) | EACH | 4 | $3,850.00 | $3,800.00 | $3,000.00 | $3,535.00 | $3,850.00 |
| 104 | Special 07. tee 8-inch X 6-inch (SPV.0060) | EACH | 3 | $1,700.00 | $1,200.00 | $850.00 | $1,190.00 | $1,550.00 |
| 105 | Special 08. hydrant (SPV.0060) | EACH | 1 | $6,675.00 | $6,500.00 | $5,850.00 | $6,600.00 | $6,650.00 |
| 106 | Special 09. gate valve 6-inch (SPV.0060) | EACH | 1 | $2,850.00 | $2,800.00 | $2,350.00 | $2,665.00 | $3,000.00 |
| 107 | Special 10. curb stop 1-inch (SPV.0060) | EACH | 33 | $440.00 | $775.00 | $350.00 | $530.00 | $575.00 |
| 108 | Special 11. corp stop 1-inch (SPV.0060) | EACH | 33 | $300.00 | $300.00 | $185.00 | $350.00 | $350.00 |
| 109 | Special 12. watermain testing (SPV.0060) | EACH | 1 | $1,500.00 | $5,500.00 | $4,200.00 | $1,700.00 | $3,000.00 |
| 110 | Special 13. temporary water (SPV.0060) | EACH | 1 | $10,000 | $10,200 | $15,500 | $17,050 | $32,000 |
| 111 | Special 14. adjusting water valve (SPV.0060) | EACH | 12 | $250.00 | $250.00 | $275.00 | $195.00 | $775.00 |
| 112 | Special 15. connect to existing storm sewer (SPV.0060) | EACH | 15 | $1,500.00 | $650.00 | $1,150.00 | $1,010.00 | $725.00 |
| 113 | Special 16. remove, salvage, and reinstall modular block retaining wall (SPV.0060) | EACH | 1 | $1,500.00 | $1,580.00 | $1,420.00 | $1,490.00 | $2,670.00 |
| 114 | Special 17. street name sign (SPV.0060) | EACH | 20 | $140.00 | $150.00 | $133.00 | $140.00 | $133.00 |
| 115 | Special 18. remove block (SPV.0060) | EACH | 1 | $1,500.00 | $830.00 | $750.00 | $785.00 | $750.00 |
| 116 | Special 01. remove watermain (SPV.0090) | LF | 1,321 | $8.00 | $7.00 | $15.00 | $5.70 | $12.00 |
| 117 | Special 02. remove water service (SPV.0090) | LF | 783 | $8.00 | $9.00 | $1.00 | $3.85 | $5.00 |
| 118 | Special 03. ductile iron water main 8-inch (SPV.0090) | LF | 1,299 | $86.00 | $80.00 | $94.00 | $92.50 | $101.00 |
| 119 | Special 04. ductile iron water main 6-inch (SPV.0090) | LF | 44 | $82.00 | $90.00 | $75.00 | $82.00 | $86.00 |
| 120 | Special 05. copper pipe 1-inch (SPV.0090) | LF | 783 | $70.00 | $45.00 | $100.00 | $64.05 | $122.00 |
| 121 | Special 06. concrete valley gutter (SPV.0090) | LF | 96 | $40.00 | $72.00 | $38.00 | $38.40 | $38.40 |
| 122 | Special 01. pulverized base (SPV.0195) | TON | 4,810 | $18.00 | $27.50 | $21.00 | $13.00 | $0.01 |
| 123 | Special 02. pulverized base (SPV.0195) | TON | 1,205 | $18.00 | $27.50 | $27.00 | $18.00 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.