| 1 | Removing concrete pavement butt joints (204.0105) | SY | 6,630 | $20.06 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 5,090 | $25.72 |
| 3 | Removing asphaltic surface milling (204.0120) | SY | 129,647 | $2.65 |
| 4 | Removing asphaltic longitudinal notched wedge joint milling (204.0126.S) | LF | 52,026 | $0.53 |
| 5 | Removing curb & gutter (204.0150) | LF | 75 | $25.73 |
| 6 | Removing guardrail (204.0165) | LF | 23,400 | $2.50 |
| 7 | Excavation common (205.0100) | CY | 20 | $108.11 |
| 8 | Borrow (208.0100) | CY | 20 | $114.17 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 1014-00-75 (211.0101) | EACH | 1 | $6,309.49 |
| 10 | Finishing roadway (project) 01. 1014-00-75 (213.0100) | EACH | 1 | $2,866.69 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 9,580 | $29.87 |
| 12 | Removing pavement for base patching (390.0100) | CY | 2,141 | $90.84 |
| 13 | Base patching concrete shes (390.0405) | CY | 2,141 | $302.60 |
| 14 | Concrete pavement hes 10-inch (415.1100) | SY | 54 | $78.24 |
| 15 | Drilled tie bars (416.0610) | EACH | 917 | $7.30 |
| 16 | Drilled dowel bars (416.0620) | EACH | 8,064 | $12.80 |
| 17 | Tack coat (455.0605) | GAL | 40,700 | $2.19 |
| 18 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $3,415.04 |
| 19 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $2,212.08 |
| 20 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 1 | $6,205.04 |
| 21 | HMA pavement test strip density (460.0120.S) | EACH | 1 | $2,212.08 |
| 22 | Incentive density PWL HMA pavement (460.2005) | DOL | 43,193 | $1.00 |
| 23 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 25,623 | $1.00 |
| 24 | Incentive air voids HMA pavement (460.2010) | DOL | 45,930 | $1.00 |
| 25 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 20,420 | $86.49 |
| 26 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 11,130 | $91.38 |
| 27 | HMA pavement 4 HT 58-28 S (460.7224) | TON | 16,870 | $91.32 |
| 28 | HMA pavement 4 SMA 58-28 V (460.8624) | TON | 17,980 | $113.24 |
| 29 | Material transfer vehicle (460.9000.S) | EACH | 1 | $38,000 |
| 30 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 102,452 | $0.18 |
| 31 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 1 | $1,582.59 |
| 32 | Culvert pipe class III-A non-metal 30-inch (520.3430) | LF | 10 | $314.15 |
| 33 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 32 | $42.00 |
| 34 | Concrete curb pedestrian (601.0600) | LF | 60 | $32.00 |
| 35 | Concrete sidewalk 5-inch (602.0410) | SF | 1,470 | $15.58 |
| 36 | Curb ramp detectable warning field yellow (602.0505) | SF | 50 | $39.00 |
| 37 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 80 | $56.56 |
| 38 | Barrier system grading shaping finishing (614.0010) | EACH | 32 | $5,927.19 |
| 39 | MGS guardrail 3 (614.2300) | LF | 22,090 | $28.50 |
| 40 | MGS thrie beam transition (614.2500) | LF | 280 | $92.00 |
| 41 | MGS guardrail terminal eat (614.2610) | EACH | 32 | $3,250.00 |
| 42 | MGS guardrail terminal type 2 (614.2620) | EACH | 23 | $3,000.00 |
| 43 | Maintenance and repair of haul roads (project) 01. 1014-00-75 (618.0100) | EACH | 1 | $1.00 |
| 44 | Mobilization (619.1000) | EACH | 1 | $745,772 |
| 45 | Water (624.0100) | MGAL | 192 | $76.43 |
| 46 | Salvaged topsoil (625.0500) | SY | 1,000 | $4.42 |
| 47 | Silt fence (628.1504) | LF | 1,200 | $2.50 |
| 48 | Silt fence maintenance (628.1520) | LF | 1,200 | $0.05 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 5 | $250.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $300.00 |
| 51 | Erosion mat class II type C (628.2027) | SY | 1,000 | $3.75 |
| 52 | Fertilizer type B (629.0210) | CWT | 0.63 | $200.00 |
| 53 | Seeding mixture no. 20 (630.0120) | LB | 28 | $30.00 |
| 54 | Seeding temporary (630.0200) | LB | 18 | $5.00 |
| 55 | Sod lawn (631.1000) | SY | 100 | $15.00 |
| 56 | Moving signs type II (638.2102) | EACH | 19 | $75.00 |
| 57 | Moving small sign supports (638.4000) | EACH | 19 | $75.00 |
| 58 | Field office type C (642.5201) | EACH | 1 | $10,000 |
| 59 | Traffic control drums (643.0300) | DAY | 21,663 | $0.75 |
| 60 | Traffic control barricades type III (643.0420) | DAY | 348 | $2.50 |
| 61 | Traffic control warning lights type A (643.0705) | DAY | 696 | $0.75 |
| 62 | Traffic control warning lights type C (643.0715) | DAY | 522 | $1.00 |
| 63 | Traffic control arrow boards (643.0800) | DAY | 174 | $45.00 |
| 64 | Traffic control signs (643.0900) | DAY | 2,304 | $2.00 |
| 65 | Traffic control signs PCMS with TMC communications (643.1051) | DAY | 198 | $50.00 |
| 66 | Basic traffic queue warning system (643.1205.S) | DAY | 60 | $275.00 |
| 67 | Temporary marking line paint 6- inch (643.3165) | LF | 256,229 | $0.26 |
| 68 | Traffic control interim lane closure (643.4100) | EACH | 87 | $1,100.00 |
| 69 | Traffic control (643.5000) | EACH | 1 | $40,000 |
| 70 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 25,623 | $0.77 |
| 71 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 194,598 | $1.28 |
| 72 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 715 | $2.63 |
| 73 | Marking removal plowable raised pavement markers (646.9400) | EACH | 1,025 | $21.85 |
| 74 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 60 | $7.07 |
| 75 | Construction staking pipe culverts (650.6000) | EACH | 1 | $101.00 |
| 76 | Construction staking curb ramps (650.9000) | EACH | 10 | $303.00 |
| 77 | Construction staking supplemental control (project) 01. 1014-00-75 (650.9911) | EACH | 1 | $1,010.00 |
| 78 | Sawing concrete (690.0250) | LF | 17,525 | $2.58 |
| 79 | Incentive iri ride (740.0440) | DOL | 19,420 | $1.00 |
| 80 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 200 | $5.00 |
| 81 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 |