WisDOT contract 20250211010 bid tabulation
Moscow - Hollandale (CTH K); Norton Road to STH 39 (CTH K, Iowa County Moscow - Hollandale (CTH K)). Let by Wisconsin DOT on February 11, 2025, Iowa. 3 bids received; low bid $682,286 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 91
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $682,286 | Low |
| 2 | H. James & Sons, Inc | $760,658 | +11% |
| 3 | Rock Road Companies, Inc. | $816,029 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. H. James & Sons, Inc | 3. Rock Road Companies, Inc. |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0220) | ID | 90 | $20.00 | $14.39 | $30.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 6 | $200.00 | $750.00 | $434.57 |
| 3 | Removing structure (structure) 01. sta 21+79 (203.0220) | EACH | 1 | $2,900.00 | $5,190.00 | $3,684.95 |
| 4 | Removing curb & gutter (204.0150) | LF | 161 | $5.00 | $12.20 | $11.13 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 84 | $6.00 | $14.35 | $12.44 |
| 6 | Removing surface drains (204.0190) | EACH | 1 | $175.00 | $700.00 | $921.24 |
| 7 | Excavation common (205.0100) | CY | 2,725 | $9.90 | $15.85 | $21.36 |
| 8 | Borrow (208.0100) | CY | 289 | $0.01 | $23.40 | $0.01 |
| 9 | Finishing roadway (project) 01. 5975-00-70 (213.0100) | EACH | 1 | $150.00 | $1,000.00 | $5,805.33 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 145 | $17.00 | $52.00 | $47.29 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 4,971 | $15.75 | $18.50 | $17.12 |
| 12 | Tack coat (455.0605) | GAL | 278 | $2.00 | $2.75 | $3.50 |
| 13 | Asphaltic surface (465.0105) | TON | 1,395 | $86.50 | $87.65 | $91.94 |
| 14 | Asphaltic surface driveways and field entrances (465.0120) | TON | 12 | $350.00 | $100.40 | $157.01 |
| 15 | Asphaltic flumes (465.0315) | SY | 23 | $80.00 | $40.50 | $66.31 |
| 16 | Apron endwalls for pipe arch steel 77X52-inch (521.1277) | EACH | 4 | $2,900.00 | $2,650.00 | $3,208.81 |
| 17 | Pipe arch corrugated steel 77X52- inch (521.3777) | LF | 124 | $255.00 | $300.00 | $411.60 |
| 18 | Culvert pipe reinforced concrete class IV 12-inch (522.0412) | LF | 40 | $55.00 | $87.00 | $95.44 |
| 19 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 2 | $1,500.00 | $1,360.00 | $1,255.91 |
| 20 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 14X23-inch (522.2414) | LF | 16 | $105.00 | $260.00 | $214.39 |
| 21 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 14X23-inch (522.2614) | EACH | 2 | $1,800.00 | $1,495.00 | $1,406.76 |
| 22 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 2 | $2,000.00 | $1,660.00 | $1,576.47 |
| 23 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 2,315 | $20.00 | $21.00 | $20.00 |
| 24 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 256 | $25.00 | $26.00 | $25.00 |
| 25 | Concrete driveway 6-inch (602.0810) | SY | 63 | $60.00 | $70.00 | $60.00 |
| 26 | Riprap medium (606.0200) | CY | 60 | $55.00 | $125.00 | $85.06 |
| 27 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 260 | $55.00 | $81.00 | $105.79 |
| 28 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 453 | $90.00 | $105.00 | $133.19 |
| 29 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 99 | $135.00 | $158.00 | $189.38 |
| 30 | Reconstructing manholes (611.0420) | EACH | 2 | $2,500.00 | $6,040.00 | $2,593.16 |
| 31 | Manhole covers type J (611.0530) | EACH | 4 | $700.00 | $870.00 | $884.26 |
| 32 | Inlet covers type C (611.0612) | EACH | 1 | $700.00 | $850.00 | $909.78 |
| 33 | Inlet covers type H (611.0624) | EACH | 9 | $850.00 | $1,050.00 | $1,131.43 |
| 34 | Manholes 4-FT diameter (611.2004) | EACH | 2 | $3,575.00 | $3,550.00 | $3,873.95 |
| 35 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $4,500.00 | $4,500.00 | $4,921.12 |
| 36 | Manholes 6-FT diameter (611.2006) | EACH | 1 | $5,800.00 | $5,700.00 | $6,168.35 |
| 37 | Inlets 3-FT diameter (611.3003) | EACH | 1 | $2,100.00 | $2,025.00 | $2,656.64 |
| 38 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $2,600.00 | $2,770.00 | $3,126.56 |
| 39 | Inlets 2X3-FT (611.3230) | EACH | 8 | $2,300.00 | $2,115.00 | $2,804.01 |
| 40 | Adjusting manhole covers (611.8110) | EACH | 2 | $275.00 | $675.00 | $828.14 |
| 41 | Cover plates temporary (611.8120.S) | EACH | 18 | $100.00 | $350.00 | $521.79 |
| 42 | Maintenance and repair of haul roads (project) 01. 5975-00-70 (618.0100) | EACH | 1 | $150.00 | $1,000.00 | $0.01 |
| 43 | Mobilization (619.1000) | EACH | 1 | $87,000 | $62,895 | $77,447 |
| 44 | Water (624.0100) | MGAL | 49.60 | $20.00 | $50.00 | $0.01 |
| 45 | Salvaged topsoil (625.0500) | SY | 5,800 | $2.00 | $3.50 | $2.20 |
| 46 | Mulching (627.0200) | SY | 5,750 | $0.40 | $0.25 | $0.77 |
| 47 | Silt fence (628.1504) | LF | 2,130 | $2.50 | $2.25 | $2.20 |
| 48 | Silt fence maintenance (628.1520) | LF | 5,115 | $0.10 | $0.05 | $0.02 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 6 | $300.00 | $250.00 | $400.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $500.00 | $300.00 | $200.00 |
| 51 | Erosion mat urban class I type B (628.2008) | SY | 100 | $2.50 | $2.50 | $2.65 |
| 52 | Inlet protection type A (628.7005) | EACH | 2 | $150.00 | $150.00 | $120.00 |
| 53 | Inlet protection type C (628.7015) | EACH | 12 | $75.00 | $60.00 | $74.00 |
| 54 | Temporary ditch checks (628.7504) | LF | 381 | $12.50 | $8.50 | $8.00 |
| 55 | Culvert pipe checks (628.7555) | EACH | 18 | $20.00 | $17.50 | $15.00 |
| 56 | Fertilizer type B (629.0210) | CWT | 5.50 | $100.00 | $75.00 | $90.00 |
| 57 | Seeding mixture no. 30 (630.0130) | LB | 200 | $10.00 | $7.50 | $8.80 |
| 58 | Seeding mixture no. 40 (630.0140) | LB | 170 | $10.00 | $8.25 | $12.00 |
| 59 | Seeding temporary (630.0200) | LB | 230 | $8.00 | $3.50 | $4.00 |
| 60 | Seed water (630.0500) | MGAL | 145 | $20.00 | $25.00 | $2.00 |
| 61 | Markers culvert end (633.5200) | EACH | 2 | $75.00 | $75.00 | $58.00 |
| 62 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 5 | $100.00 | $75.00 | $77.00 |
| 63 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 7 | $125.00 | $90.00 | $90.00 |
| 64 | Signs type II reflective H (637.2210) | SF | 54.54 | $35.00 | $28.00 | $22.90 |
| 65 | Signs type II reflective F (637.2230) | SF | 23.75 | $35.00 | $31.00 | $24.80 |
| 66 | Moving signs type II (638.2102) | EACH | 4 | $150.00 | $75.00 | $170.00 |
| 67 | Removing signs type II (638.2602) | EACH | 21 | $50.00 | $35.00 | $32.00 |
| 68 | Removing small sign supports (638.3000) | EACH | 19 | $50.00 | $35.00 | $32.00 |
| 69 | Field office type B (642.5001) | EACH | 1 | $2,500.00 | $7,500.00 | $5,000.00 |
| 70 | Traffic control drums (643.0300) | DAY | 420 | $1.00 | $1.00 | $1.00 |
| 71 | Traffic control barricades type III (643.0420) | DAY | 1,750 | $0.69 | $0.60 | $0.60 |
| 72 | Traffic control warning lights type A (643.0705) | DAY | 3,920 | $0.20 | $0.20 | $0.20 |
| 73 | Traffic control signs (643.0900) | DAY | 12,320 | $0.22 | $0.22 | $0.22 |
| 74 | Traffic control covering signs type II (643.0920) | EACH | 5 | $95.00 | $95.00 | $95.00 |
| 75 | Traffic control signs PCMS (643.1050) | DAY | 14 | $45.00 | $45.00 | $45.00 |
| 76 | Traffic control (643.5000) | EACH | 1 | $8,325.00 | $8,325.00 | $8,325.00 |
| 77 | Geotextile type HR (645.0120) | SY | 172 | $3.00 | $10.00 | $1.96 |
| 78 | Marking line epoxy 4-inch (646.1020) | LF | 3,294 | $1.50 | $1.50 | $1.50 |
| 79 | Marking stop line epoxy 18-inch (646.6120) | LF | 32 | $21.00 | $21.00 | $21.00 |
| 80 | Construction staking storm sewer (650.4000) | EACH | 16 | $200.00 | $200.00 | $200.00 |
| 81 | Construction staking subgrade (650.4500) | LF | 1,710 | $0.01 | $0.01 | $0.01 |
| 82 | Construction staking base (650.5000) | LF | 1,710 | $1.00 | $1.00 | $1.00 |
| 83 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 2,571 | $1.00 | $1.00 | $1.00 |
| 84 | Construction staking pipe culverts (650.6000) | EACH | 4 | $200.00 | $200.00 | $200.00 |
| 85 | Construction staking supplemental control (project) 01. 5975-00-70 (650.9911) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 |
| 86 | Construction staking slope stakes (650.9920) | LF | 1,710 | $1.00 | $1.00 | $1.00 |
| 87 | Sawing asphalt (690.0150) | LF | 310 | $1.74 | $2.25 | $1.20 |
| 88 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 |
| 89 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 |
| 90 | Special 01. adjusting water valves (SPV.0060) | EACH | 7 | $350.00 | $750.00 | $1,043.58 |
| 91 | Special 02. relocate fire hydrants (SPV.0060) | EACH | 3 | $4,500.00 | $4,000.00 | $5,725.66 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.