WisDOT contract 20250211021 bid tabulation
C Whitewater, Innovation Dr; Technology Dr to Howard Rd (LOC STR, Walworth County C Whitewater, Innovation Dr). Let by Wisconsin DOT on February 11, 2025, Walworth. 2 bids received; low bid $232,999 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 45
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $232,999 | Low |
| 2 | Rock Road Companies, Inc. | $297,765 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Rock Road Companies, Inc. |
|---|---|---|---|---|---|
| 1 | Removing asphaltic surface milling (204.0120) | SY | 7,990 | $2.60 | $5.43 |
| 2 | Removing curb & gutter (204.0150) | LF | 390 | $5.00 | $5.00 |
| 3 | Excavation common (205.0100) | CY | 138 | $48.55 | $48.55 |
| 4 | Prepare foundation for asphaltic paving (project) 01. 3835-00-75 (211.0101) | EACH | 1 | $750.00 | $2,010.23 |
| 5 | Finishing roadway (project) 01. 3835-00-75 (213.0100) | EACH | 1 | $500.00 | $1,975.42 |
| 6 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 108 | $24.00 | $33.08 |
| 7 | Base aggregate dense 3-inch (305.0130) | TON | 35 | $33.00 | $25.34 |
| 8 | Tack coat (455.0605) | GAL | 400 | $2.30 | $3.47 |
| 9 | Incentive density HMA pavement (460.2000) | DOL | 1,430 | $1.00 | $1.00 |
| 10 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 1,340 | $65.75 | $78.14 |
| 11 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 895 | $75.75 | $87.85 |
| 12 | Asphaltic surface driveways and field entrances (465.0120) | TON | 2 | $350.00 | $365.75 |
| 13 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 390 | $45.05 | $45.05 |
| 14 | Concrete sidewalk 5-inch (602.0410) | SF | 105 | $12.00 | $12.00 |
| 15 | Curb ramp detectable warning field yellow (602.0505) | SF | 20 | $50.00 | $50.00 |
| 16 | Maintenance and repair of haul roads (project) 01. 3835-00-75 (618.0100) | EACH | 1 | $670.00 | $0.01 |
| 17 | Mobilization (619.1000) | EACH | 1 | $1,550.00 | $6,890.07 |
| 18 | Water (624.0100) | MGAL | 1.10 | $45.45 | $0.01 |
| 19 | Topsoil (625.0100) | SY | 100 | $7.00 | $34.59 |
| 20 | Mulching (627.0200) | SY | 266 | $1.00 | $1.00 |
| 21 | Mobilizations erosion control (628.1905) | EACH | 3 | $350.00 | $250.00 |
| 22 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $350.00 | $250.00 |
| 23 | Inlet protection type B (628.7010) | EACH | 1 | $65.00 | $60.00 |
| 24 | Inlet protection type C (628.7015) | EACH | 23 | $75.00 | $60.00 |
| 25 | Fertilizer type A (629.0205) | CWT | 0.20 | $165.00 | $500.00 |
| 26 | Seeding mixture no. 40 (630.0140) | LB | 4.50 | $12.00 | $100.00 |
| 27 | Seeding borrow pit (630.0300) | LB | 2.20 | $10.00 | $100.00 |
| 28 | Seed water (630.0500) | MGAL | 5.90 | $50.00 | $100.00 |
| 29 | Field office type B (642.5001) | EACH | 1 | $100.00 | $2,500.00 |
| 30 | Traffic control drums (643.0300) | DAY | 585 | $0.30 | $1.00 |
| 31 | Traffic control barricades type III (643.0420) | DAY | 468 | $0.74 | $1.75 |
| 32 | Traffic control warning lights type A (643.0705) | DAY | 936 | $0.18 | $0.25 |
| 33 | Traffic control signs (643.0900) | DAY | 468 | $0.50 | $2.00 |
| 34 | Traffic control signs PCMS (643.1050) | DAY | 14 | $100.00 | $25.00 |
| 35 | Traffic control (643.5000) | EACH | 1 | $1,700.00 | $650.00 |
| 36 | Marking line paint 6-inch (646.2005) | LF | 600 | $4.35 | $5.75 |
| 37 | Marking arrow paint (646.5005) | EACH | 2 | $85.00 | $150.00 |
| 38 | Marking symbol paint (646.5205) | EACH | 4 | $85.00 | $150.00 |
| 39 | Marking stop line paint 18-inch (646.6105) | LF | 22 | $13.00 | $18.00 |
| 40 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 390 | $3.00 | $3.00 |
| 41 | Construction staking curb ramps (650.9000) | EACH | 1 | $300.00 | $300.00 |
| 42 | Construction staking supplemental control (project) 01. 3835-00-75 (650.9911) | EACH | 1 | $1,500.00 | $1,500.00 |
| 43 | Sawing asphalt (690.0150) | LF | 205 | $1.15 | $1.15 |
| 44 | Sawing concrete (690.0250) | LF | 120 | $2.25 | $2.25 |
| 45 | Incentive iri ride (740.0440) | DOL | 1,611 | $1.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.