WisDOT contract 20250211025 bid tabulation
Appleton - De Pere; STH 96 - CTH F (IH 041, Outagamie County Appleton - De Pere). Let by Wisconsin DOT on February 11, 2025, Outagamie. 2 bids received; low bid $2,092,250 by Sir Lines-A-Lot LLC.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 12
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sir Lines-A-Lot LLC | $2,092,250 | Low |
| 2 | Century Traffic, LLC | $2,425,466 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sir Lines-A-Lot LLC | 2. Century Traffic, LLC |
|---|---|---|---|---|---|
| 1 | Mobilization (619.1000) | EACH | 1 | $66,150 | $145,588 |
| 2 | Traffic control drums (643.0300) | DAY | 371,370 | $0.05 | $0.10 |
| 3 | Traffic control signs PCMS with TMC communications (643.1051) | DAY | 18,749 | $20.00 | $18.82 |
| 4 | Traffic control (643.5000) | EACH | 1 | $350,000 | $90,000 |
| 5 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 |
| 6 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 7 | Special 01. combination work zone digital speed limit - speed feedback sign trailer (SPV.0045) | DAY | 8,415 | $16.00 | $12.94 |
| 8 | Special 02. flashing beacon sign (SPV.0045) | DAY | 47,110 | $10.00 | $11.76 |
| 9 | Special 03. portable traffic sensor (SPV.0045) | DAY | 181,428 | $3.25 | $2.35 |
| 10 | Special 01. moving FBS (SPV.0060) | EACH | 568 | $50.00 | $375.00 |
| 11 | Special 02. moving PTS (SPV.0060) | EACH | 1,214 | $30.00 | $375.00 |
| 12 | Special 03. mobilizations emergency traffic control (SPV.0060) | EACH | 89 | $150.00 | $375.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.