WisDOT contract 20250311022 bid tabulation
Ne Region Wide Deck Sealing Fy25; Various Routes/Hwy (VAR HWY, Northeast Wide NE Region Wide Deck Sealing FY25). Let by Wisconsin DOT on March 11, 2025, Northeast Region Wide. 5 bids received; low bid $1,467,953 by Fahrner Asphalt Sealers, LLC.
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 6
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Fahrner Asphalt Sealers, LLC | $1,467,953 | Low |
| 2 | Norcon Corporation | $1,619,145 | +10% |
| 3 | Aad Contracting Inc | $1,649,904 | +12% |
| 4 | Thunder Road LLC | $1,995,924 | +36% |
| 5 | Ram Construction Services of Michigan, I | $2,106,006 | +43% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fahrner Asphalt Sealers, LLC | 2. Norcon Corporation | 3. Aad Contracting Inc | 4. Thunder Road LLC | 5. Ram Construction Services of Michigan, I |
|---|---|---|---|---|---|---|---|---|
| 1 | Protective surface treatment reseal (502.3215) | SY | 63,025 | $2.65 | $4.25 | $3.60 | $4.25 | $7.64 |
| 2 | Mobilization (619.1000) | EACH | 1 | $140,000 | $133,268 | $20,000 | $195,000 | $186,000 |
| 3 | Traffic control signs PCMS (643.1050) | DAY | 502 | $90.00 | $90.00 | $50.00 | $20.00 | $20.00 |
| 4 | Special 01.traffic control 1009-33- 39 (SPV.0060) | EACH | 1 | $138,500 | $168,500 | $170,000 | $110,000 | $451,500 |
| 5 | Special 01. bridge deck crack sealing (SPV.0090) | LF | 53,946 | $1.69 | $0.95 | $3.00 | $3.00 | $1.00 |
| 6 | Special 01. methacrylate flood seal (SPV.0180) | SY | 68,371 | $12.96 | $13.94 | $15.30 | $18.30 | $13.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.