WisDOT contract 20250311028 bid tabulation
C Green Bay, Country Club Road; Mason St Frontage Rd to Indian Hill (LOC STR, Brown County C Green Bay, Country Club Road). Let by Wisconsin DOT on March 11, 2025, Brown. 5 bids received; low bid $3,852,282 by Peters Concrete Company.
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 147
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peters Concrete Company | $3,852,282 | Low |
| 2 | Vinton Construction Company | $3,857,342 | 0.0% |
| 3 | Zignego Company, Inc. | $3,967,677 | +3.0% |
| 4 | Michels Road & Stone, Inc. | $4,198,771 | +9.0% |
| 5 | James Peterson Sons, Inc. | $4,689,646 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peters Concrete Company | 2. Vinton Construction Company | 3. Zignego Company, Inc. | 4. Michels Road & Stone, Inc. | 5. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0220) | ID | 800 | $17.00 | $10.00 | $12.00 | $14.95 | $12.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 20,370 | $0.01 | $1.00 | $0.01 | $4.90 | $5.91 |
| 3 | Removing curb & gutter (204.0150) | LF | 420 | $3.50 | $5.00 | $3.50 | $1.44 | $5.94 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 10 | $10.00 | $20.00 | $10.00 | $22.95 | $25.00 |
| 5 | Removing manholes (204.0210) | EACH | 17 | $250.00 | $485.00 | $250.00 | $425.00 | $500.00 |
| 6 | Removing inlets (204.0220) | EACH | 27 | $150.00 | $335.00 | $150.00 | $325.00 | $400.00 |
| 7 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 1,430 | $6.00 | $13.25 | $6.00 | $23.00 | $10.21 |
| 8 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 135 | $6.00 | $13.25 | $6.00 | $23.00 | $12.77 |
| 9 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 2,375 | $17.80 | $20.40 | $17.80 | $23.00 | $76.31 |
| 10 | Removing storm sewer (size) 04. 24-inch (204.0245) | LF | 44 | $20.00 | $23.30 | $20.00 | $19.00 | $18.42 |
| 11 | Removing storm sewer (size) 05. 24X38-inch (204.0245) | LF | 105 | $5.00 | $27.20 | $5.00 | $19.00 | $21.53 |
| 12 | Removing storm sewer (size) 06. 48-inch (204.0245) | LF | 350 | $5.00 | $34.70 | $5.00 | $22.00 | $30.84 |
| 13 | Removing storm sewer (size) 07. 38X60-inch (204.0245) | LF | 265 | $5.00 | $35.40 | $5.00 | $21.00 | $30.84 |
| 14 | Sealing pipes (204.0280) | EACH | 2 | $250.00 | $488.00 | $250.00 | $395.00 | $750.00 |
| 15 | Removing (item description) 01. brick pillars (204.9060.S) | EACH | 2 | $50.00 | $150.00 | $50.00 | $594.19 | $1,500.00 |
| 16 | Removing (item description) 01. retaining wall planter (204.9090.S) | LF | 50 | $0.01 | $7.00 | $0.01 | $12.36 | $12.00 |
| 17 | Excavation common (205.0100) | CY | 12,700 | $19.25 | $19.50 | $19.25 | $8.45 | $17.44 |
| 18 | Finishing roadway (project) 01. 4987-02-75 (213.0100) | EACH | 1 | $2,500.00 | $3,500.00 | $1,000.00 | $10,000 | $5,000.00 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 12,300 | $15.25 | $12.25 | $15.25 | $18.89 | $19.37 |
| 20 | Concrete pavement 8-inch (415.0080) | SY | 18,880 | $51.36 | $51.36 | $53.12 | $54.63 | $51.36 |
| 21 | Concrete pavement gaps (415.0210) | EACH | 3 | $2,500.00 | $2,500.00 | $1,000.00 | $800.00 | $2,500.00 |
| 22 | Concrete pavement hes 8-inch (415.1080) | SY | 1,480 | $55.36 | $55.36 | $90.00 | $71.38 | $55.36 |
| 23 | Concrete pavement joint filling (415.4100) | SY | 22,430 | $2.00 | $2.00 | $1.50 | $2.45 | $2.00 |
| 24 | Drilled tie bars (416.0610) | EACH | 90 | $10.00 | $10.00 | $20.00 | $10.47 | $10.00 |
| 25 | Drilled dowel bars (416.0620) | EACH | 107 | $16.50 | $16.50 | $20.00 | $12.24 | $16.50 |
| 26 | Tack coat (455.0605) | GAL | 15 | $14.00 | $25.00 | $14.00 | $18.10 | $18.10 |
| 27 | Asphaltic surface (465.0105) | TON | 45 | $150.00 | $250.00 | $150.00 | $238.00 | $238.00 |
| 28 | Asphaltic surface driveways and field entrances (465.0120) | TON | 90 | $185.00 | $250.00 | $185.00 | $238.00 | $238.00 |
| 29 | Concrete collars for pipe (520.8000) | EACH | 6 | $400.00 | $550.00 | $400.00 | $657.00 | $550.00 |
| 30 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 1 | $3,110.00 | $3,041.00 | $3,110.00 | $2,678.00 | $2,494.00 |
| 31 | Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054) | EACH | 1 | $4,865.00 | $4,568.00 | $4,865.00 | $4,171.00 | $4,552.00 |
| 32 | Concrete curb & gutter integral 18- inch (601.0342) | LF | 1,670 | $25.00 | $25.00 | $18.37 | $20.00 | $25.00 |
| 33 | Concrete curb & gutter integral 30- inch type D (601.0452) | LF | 5,980 | $25.00 | $25.00 | $24.50 | $20.00 | $25.00 |
| 34 | Concrete sidewalk 4-inch (602.0405) | SF | 27,000 | $5.06 | $5.06 | $7.00 | $6.30 | $5.06 |
| 35 | Concrete sidewalk 6-inch (602.0415) | SF | 400 | $7.70 | $7.70 | $7.24 | $7.40 | $7.70 |
| 36 | Curb ramp detectable warning field natural patina (602.0515) | SF | 130 | $36.00 | $36.00 | $38.00 | $36.00 | $36.00 |
| 37 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 36 | $55.00 | $55.00 | $63.00 | $55.00 | $55.00 |
| 38 | Concrete driveway 6-inch (602.0810) | SY | 900 | $64.98 | $64.98 | $70.00 | $66.00 | $64.98 |
| 39 | Concrete driveway 8-inch (602.0820) | SY | 110 | $79.00 | $79.00 | $75.00 | $77.70 | $79.00 |
| 40 | Riprap heavy (606.0300) | CY | 360 | $62.50 | $85.06 | $62.50 | $97.07 | $110.00 |
| 41 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 91 | $117.00 | $91.45 | $117.00 | $86.00 | $131.14 |
| 42 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 1,267 | $84.50 | $92.50 | $84.50 | $106.00 | $107.30 |
| 43 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 1,317 | $102.65 | $111.65 | $102.65 | $132.00 | $148.21 |
| 44 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 36 | $180.00 | $172.45 | $180.00 | $179.00 | $241.79 |
| 45 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 212 | $212.00 | $201.90 | $212.00 | $212.00 | $265.87 |
| 46 | Storm sewer pipe reinforced concrete class III 54-inch (608.0354) | LF | 33 | $389.00 | $358.20 | $389.00 | $390.00 | $530.09 |
| 47 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 4 | $300.00 | $87.00 | $300.00 | $77.00 | $150.00 |
| 48 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 276 | $87.50 | $92.30 | $87.50 | $90.00 | $139.35 |
| 49 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 248 | $118.20 | $123.60 | $118.20 | $130.00 | $157.56 |
| 50 | Storm sewer pipe reinforced concrete class IV 48-inch (608.0448) | LF | 404 | $316.30 | $313.80 | $316.30 | $320.00 | $383.42 |
| 51 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (608.2324) | LF | 59 | $255.00 | $215.55 | $255.00 | $208.00 | $272.17 |
| 52 | Manhole covers type K (611.0540) | EACH | 4 | $1,400.00 | $1,295.00 | $1,400.00 | $1,236.00 | $2,281.00 |
| 53 | Adjusting inlet covers (611.8115) | EACH | 1 | $600.00 | $375.00 | $600.00 | $600.00 | $1,925.00 |
| 54 | Pipe grates (size) 01. 36-inch (611.9850.S) | EACH | 1 | $3,745.00 | $3,331.00 | $3,745.00 | $3,456.00 | $3,517.00 |
| 55 | Pipe grates (size) 02. 54-inch (611.9850.S) | EACH | 1 | $7,205.00 | $6,368.00 | $7,205.00 | $6,940.00 | $7,023.00 |
| 56 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 30 | $30.00 | $36.00 | $30.00 | $13.00 | $24.00 |
| 57 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 815 | $26.80 | $16.45 | $26.80 | $18.00 | $24.00 |
| 58 | Insulation board polystyrene (inch) 01. 2-inch (612.0902.S) | SY | 100 | $23.00 | $21.60 | $23.00 | $6.00 | $29.84 |
| 59 | Maintenance and repair of haul roads (project) 01. 4987-02-75 (618.0100) | EACH | 1 | $1.00 | $0.01 | $1.00 | $1.00 | $0.01 |
| 60 | Mobilization (619.1000) | EACH | 1 | $139,176 | $124,000 | $121,000 | $262,332 | $349,535 |
| 61 | Dust control surface treatment (623.0200) | SY | 25,000 | $0.20 | $0.01 | $0.01 | $0.01 | $0.40 |
| 62 | Water (624.0100) | MGAL | 180 | $35.00 | $0.01 | $35.00 | $49.12 | $55.00 |
| 63 | Topsoil (625.0100) | SY | 10,700 | $9.25 | $5.60 | $9.25 | $5.15 | $6.98 |
| 64 | Silt fence (628.1504) | LF | 3,000 | $1.98 | $1.98 | $1.98 | $2.40 | $1.98 |
| 65 | Silt fence maintenance (628.1520) | LF | 6,000 | $0.02 | $0.02 | $0.02 | $0.01 | $0.02 |
| 66 | Mobilizations erosion control (628.1905) | EACH | 12 | $75.00 | $75.00 | $75.00 | $0.01 | $75.00 |
| 67 | Mobilizations emergency erosion control (628.1910) | EACH | 8 | $25.00 | $25.00 | $25.00 | $0.01 | $25.00 |
| 68 | Erosion mat urban class I type B (628.2008) | SY | 600 | $2.80 | $2.80 | $2.80 | $2.11 | $2.80 |
| 69 | Inlet protection type A (628.7005) | EACH | 44 | $25.00 | $25.00 | $25.00 | $122.12 | $25.00 |
| 70 | Inlet protection type C (628.7015) | EACH | 50 | $68.00 | $68.00 | $68.00 | $65.63 | $68.00 |
| 71 | Inlet protection type D (628.7020) | EACH | 10 | $135.00 | $135.00 | $135.00 | $112.08 | $135.00 |
| 72 | Tracking pads (628.7560) | EACH | 3 | $250.00 | $0.01 | $250.00 | $2,053.25 | $1,000.00 |
| 73 | Rock bags (628.7570) | EACH | 55 | $16.00 | $16.00 | $16.00 | $17.15 | $16.00 |
| 74 | Fertilizer type B (629.0210) | CWT | 1 | $250.00 | $250.00 | $250.00 | $142.26 | $250.00 |
| 75 | Seeding mixture no. 20 (630.0120) | LB | 30 | $9.00 | $9.00 | $9.00 | $11.18 | $9.00 |
| 76 | Seeding temporary (630.0200) | LB | 40 | $5.00 | $5.00 | $5.00 | $4.14 | $5.00 |
| 77 | Seed water (630.0500) | MGAL | 245 | $5.00 | $5.00 | $5.00 | $0.01 | $5.00 |
| 78 | Field office type D (642.5401) | EACH | 1 | $9,600.00 | $12,500 | $20,000 | $25,580 | $30,000 |
| 79 | Traffic control drums (643.0300) | DAY | 18,200 | $0.20 | $0.18 | $0.18 | $0.18 | $0.18 |
| 80 | Traffic control barricades type II (643.0410) | DAY | 156 | $0.50 | $1.46 | $1.46 | $1.46 | $1.46 |
| 81 | Traffic control barricades type III (643.0420) | DAY | 4,904 | $0.50 | $0.42 | $0.42 | $0.42 | $0.42 |
| 82 | Traffic control warning lights type A (643.0705) | DAY | 9,808 | $0.10 | $0.13 | $0.13 | $0.13 | $0.13 |
| 83 | Traffic control arrow boards (643.0800) | DAY | 3 | $50.00 | $15.74 | $15.74 | $15.74 | $15.74 |
| 84 | Traffic control signs (643.0900) | DAY | 5,432 | $0.45 | $0.25 | $0.25 | $0.25 | $0.25 |
| 85 | Traffic control signs fixed message (643.1000) | SF | 60 | $23.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 86 | Traffic control signs PCMS (643.1050) | DAY | 35 | $75.00 | $26.71 | $26.71 | $26.71 | $26.71 |
| 87 | Traffic control cones 42-inch (643.1070) | DAY | 860 | $0.50 | $0.59 | $0.59 | $0.59 | $0.59 |
| 88 | Traffic control (643.5000) | EACH | 1 | $2,200.00 | $6,400.00 | $6,400.00 | $6,400.00 | $6,400.00 |
| 89 | Geotextile type HR (645.0120) | SY | 3,320 | $1.85 | $2.00 | $1.85 | $3.30 | $3.00 |
| 90 | Geotextile type R (645.0130) | SY | 300 | $3.00 | $3.50 | $3.00 | $8.00 | $2.00 |
| 91 | Geogrid type SR (645.0220) | SY | 24,600 | $1.15 | $1.33 | $1.15 | $2.06 | $0.76 |
| 92 | Marking line epoxy 4-inch (646.1020) | LF | 15,700 | $0.58 | $0.75 | $0.58 | $1.05 | $1.05 |
| 93 | Marking line epoxy 8-inch (646.3020) | LF | 1,425 | $0.95 | $1.50 | $0.95 | $2.10 | $2.10 |
| 94 | Marking arrow epoxy (646.5020) | EACH | 19 | $310.00 | $225.00 | $310.00 | $330.00 | $330.00 |
| 95 | Marking word epoxy (646.5120) | EACH | 5 | $340.00 | $250.00 | $340.00 | $350.00 | $350.00 |
| 96 | Marking symbol epoxy (646.5220) | EACH | 11 | $275.00 | $375.00 | $275.00 | $199.00 | $199.00 |
| 97 | Marking stop line epoxy 18-inch (646.6120) | LF | 44 | $18.80 | $13.50 | $18.80 | $17.00 | $17.00 |
| 98 | Marking diagonal epoxy 12-inch (646.7120) | LF | 115 | $14.25 | $10.00 | $14.25 | $13.00 | $13.00 |
| 99 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 42 | $22.50 | $20.00 | $22.50 | $27.00 | $27.00 |
| 100 | Marking removal line water blasting wide (646.9210) | LF | 180 | $8.35 | $8.00 | $8.00 | $8.00 | $8.00 |
| 101 | Construction staking storm sewer (650.4000) | EACH | 65 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 |
| 102 | Construction staking subgrade (650.4500) | LF | 4,193 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 103 | Construction staking base (650.5000) | LF | 51 | $0.55 | $0.55 | $0.55 | $0.55 | $0.55 |
| 104 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 410 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 105 | Construction staking concrete pavement (650.7000) | LF | 3,630 | $1.25 | $1.25 | $1.25 | $0.30 | $1.25 |
| 106 | Construction staking curb ramps (650.9000) | EACH | 15 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 107 | Construction staking sidewalk (project) 01. 4987-02-75 (650.9500) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 108 | Construction staking supplemental control (project) 01. 4987-02-75 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 109 | Construction staking slope stakes (650.9920) | LF | 4,193 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 110 | Sawing asphalt (690.0150) | LF | 320 | $1.75 | $3.00 | $1.20 | $1.75 | $1.20 |
| 111 | Sawing concrete (690.0250) | LF | 540 | $2.35 | $3.00 | $2.25 | $2.35 | $2.25 |
| 112 | Incentive compressive strength concrete pavement (715.0720) | DOL | 5,670 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 113 | Incentive iri ride (740.0440) | DOL | 10,975 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 114 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 115 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 116 | Special 01. manhole covers type GB-J-S (SPV.0060) | EACH | 23 | $510.00 | $509.00 | $510.00 | $528.00 | $1,386.35 |
| 117 | Special 02. inlet covers type GB-H (SPV.0060) | EACH | 30 | $680.00 | $678.00 | $680.00 | $763.00 | $1,411.20 |
| 118 | Special 03. inlet covers type GB-H- V (SPV.0060) | EACH | 10 | $680.00 | $678.00 | $680.00 | $763.00 | $1,416.80 |
| 119 | Special 04. catch basin GB 2X3- foot (SPV.0060) | EACH | 40 | $2,965.00 | $2,900.00 | $2,965.00 | $3,123.00 | $2,473.70 |
| 120 | Special 05. manhole GB 4-foot (SPV.0060) | EACH | 13 | $3,735.00 | $3,900.00 | $3,735.00 | $3,828.00 | $3,192.77 |
| 121 | Special 06. manhole GB 5-foot (SPV.0060) | EACH | 4 | $6,000.00 | $6,000.00 | $6,000.00 | $6,293.00 | $5,712.46 |
| 122 | Special 07. manhole GB 6-foot (SPV.0060) | EACH | 1 | $7,250.00 | $7,705.00 | $7,250.00 | $7,859.00 | $7,438.25 |
| 123 | Special 08. manhole GB 7-foot (SPV.0060) | EACH | 4 | $12,300 | $11,202 | $12,300 | $12,557 | $11,767 |
| 124 | Special 09. manhole GB 9-foot (SPV.0060) | EACH | 2 | $22,000 | $19,515 | $22,000 | $22,587 | $25,470 |
| 125 | Special 10. underground detention (SPV.0060) | EACH | 1 | $187,325 | $203,602 | $187,325 | $169,000 | $188,805 |
| 126 | Special 11. adjusting sanitary manhole covers (SPV.0060) | EACH | 13 | $400.00 | $650.00 | $400.00 | $666.00 | $1,060.79 |
| 127 | Special 12. adjusting water valve boxes (SPV.0060) | EACH | 18 | $175.00 | $150.00 | $175.00 | $225.50 | $443.38 |
| 128 | Special 13. preservation of existing monuments project 4987-02-75 (SPV.0060) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 129 | Special 14. verify and restoring of existing monuments project 4987- 02-75 (SPV.0060) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 130 | Special 01. concrete curb & gutter integral hes 30-inch type D (SPV.0090) | LF | 400 | $27.00 | $27.00 | $60.00 | $20.00 | $27.00 |
| 131 | Special 02. concrete curb & gutter 18-inch type D special (SPV.0090) | LF | 140 | $50.00 | $50.00 | $65.00 | $46.75 | $50.00 |
| 132 | Special 03. concrete curb & gutter 24-inch type D (SPV.0090) | LF | 180 | $50.00 | $50.00 | $67.00 | $48.00 | $50.00 |
| 133 | Special 04. concrete curb & gutter rolled 24-inch type A (SPV.0090) | LF | 30 | $50.00 | $50.00 | $67.00 | $48.00 | $50.00 |
| 134 | Special 05. concrete curb & gutter rolled 24-inch type D (SPV.0090) | LF | 40 | $50.00 | $50.00 | $67.00 | $48.00 | $50.00 |
| 135 | Special 06. concrete curb & gutter 36-inch type D special (SPV.0090) | LF | 20 | $55.00 | $55.00 | $73.00 | $52.00 | $55.00 |
| 136 | Special 07. storm sewer pipe inlet lead 12-inch (SPV.0090) | LF | 710 | $90.30 | $73.65 | $90.30 | $83.00 | $139.59 |
| 137 | Special 08. storm sewer pipe inlet lead 15-inch (SPV.0090) | LF | 155 | $93.65 | $77.35 | $93.65 | $86.00 | $142.00 |
| 138 | Special 09. storm sewer pipe inlet lead 18-inch (SPV.0090) | LF | 28 | $105.00 | $94.50 | $105.00 | $91.00 | $167.27 |
| 139 | Special 10. storm sewer pipe PVC 8-inch (SPV.0090) | LF | 7 | $165.00 | $92.90 | $165.00 | $56.00 | $74.65 |
| 140 | Special 11. storm sewer pipe PVC 12-inch (SPV.0090) | LF | 12 | $135.00 | $93.05 | $135.00 | $98.00 | $86.00 |
| 141 | Special 12. storm sewer laterals 6- inch (SPV.0090) | LF | 1,180 | $64.75 | $77.30 | $64.75 | $61.00 | $79.32 |
| 142 | Special 13. sanitary sewer laterals 4-inch (SPV.0090) | LF | 30 | $236.00 | $153.00 | $236.00 | $75.00 | $151.74 |
| 143 | Special 14. marking crosswalk epoxy transverse line 12-inch (SPV.0090) | LF | 820 | $14.25 | $11.00 | $14.25 | $15.50 | $15.50 |
| 144 | Special 01. concrete sidewalk with retaining wall (SPV.0165) | SF | 1,860 | $21.00 | $21.00 | $21.09 | $20.30 | $21.00 |
| 145 | Special 02. concrete sidewalk 8- inch (SPV.0165) | SF | 130 | $10.00 | $10.00 | $8.43 | $8.60 | $10.00 |
| 146 | Special 01. hydroseeding (SPV.0180) | SY | 10,100 | $1.85 | $1.85 | $1.85 | $1.46 | $1.85 |
| 147 | Special 01. 3-inch stone cradle storm sewer (SPV.0195) | TON | 100 | $15.00 | $30.00 | $15.00 | $24.00 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.