| 1 | Grubbing (201.0205) | STA | 1 | $1,250.00 | $1,250.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 5 | $500.00 | $500.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 1,670 | $5.05 | $5.05 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 1,140 | $17.59 | $10.68 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 478,320 | $0.45 | $0.75 |
| 6 | Removing curb & gutter (204.0150) | LF | 565 | $10.00 | $10.00 |
| 7 | Removing guardrail (204.0165) | LF | 3,548 | $1.75 | $2.35 |
| 8 | Removing delineators and markers (204.0180) | EACH | 1,161 | $5.00 | $11.00 |
| 9 | Removing inlets (204.0220) | EACH | 8 | $500.00 | $500.00 |
| 10 | Excavation common (205.0100) | CY | 1,730 | $34.93 | $34.93 |
| 11 | Excavation for structures culverts (structure) 01. C-37-51 (206.2001) | EACH | 1 | $250.00 | $250.00 |
| 12 | Borrow (208.0100) | CY | 269 | $25.00 | $25.00 |
| 13 | Prepare foundation for asphaltic paving (project) 01. 1053-04-84 (211.0101) | EACH | 1 | $25,067 | $0.01 |
| 14 | Finishing roadway (project) 01. 1053-04-84 (213.0100) | EACH | 1 | $5,000.00 | $5,635.39 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,535 | $24.86 | $24.86 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,450 | $15.76 | $15.76 |
| 17 | Rout and seal (415.6000.S) | LF | 22,388 | $1.44 | $1.44 |
| 18 | HMA cold weather paving (450.4000) | TON | 38,265 | $0.01 | $0.01 |
| 19 | Tack coat (455.0605) | GAL | 52,134 | $3.50 | $2.86 |
| 20 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $3,500.00 | $3,500.00 |
| 21 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $3,500.00 | $3,500.00 |
| 22 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 1 | $3,500.00 | $3,500.00 |
| 23 | HMA pavement test strip density (460.0120.S) | EACH | 1 | $3,500.00 | $3,500.00 |
| 24 | Incentive density HMA pavement (460.2000) | DOL | 47,218 | $1.00 | $1.00 |
| 25 | Incentive density PWL HMA pavement (460.2005) | DOL | 29,320 | $1.00 | $1.00 |
| 26 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 19,586 | $1.00 | $1.00 |
| 27 | Incentive air voids HMA pavement (460.2010) | DOL | 29,320 | $1.00 | $1.00 |
| 28 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 12,460 | $72.01 | $80.33 |
| 29 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 6,320 | $86.65 | $105.66 |
| 30 | HMA pavement 4 HT 58-28 S (460.7224) | TON | 29,320 | $77.40 | $80.83 |
| 31 | HMA pavement 4 SMA 58-28 H (460.8424) | TON | 28,430 | $97.04 | $105.93 |
| 32 | Material transfer vehicle (460.9000.S) | EACH | 1 | $20,000 | $0.01 |
| 33 | Asphaltic surface (465.0105) | TON | 710 | $132.40 | $85.91 |
| 34 | Asphaltic surface patching (465.0110) | TON | 90 | $202.03 | $98.25 |
| 35 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 199,368 | $0.23 | $0.14 |
| 36 | Preparation decks type 1 (509.0301) | SY | 22 | $250.00 | $175.00 |
| 37 | Preparation decks type 2 (509.0302) | SY | 9 | $400.00 | $225.00 |
| 38 | Sawing pavement deck preparation areas (509.0310.S) | LF | 220 | $14.01 | $5.00 |
| 39 | Concrete masonry deck repair (509.2100.S) | CY | 3 | $3,500.00 | $1,850.00 |
| 40 | Polymer overlay (509.5100.S) | SY | 1,370 | $37.22 | $30.20 |
| 41 | Temporary shoring (511.1100) | SF | 2,800 | $42.00 | $42.00 |
| 42 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 2 | $415.00 | $415.00 |
| 43 | Culvert pipe class III-A 18-inch (520.3318) | LF | 64 | $61.72 | $61.72 |
| 44 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,012.00 | $1,012.00 |
| 45 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $1,236.00 | $1,236.00 |
| 46 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 1 | $2,242.00 | $2,242.00 |
| 47 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 104 | $32.39 | $32.07 |
| 48 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 458 | $34.61 | $34.27 |
| 49 | Concrete surface drains (602.3010) | CY | 6 | $1,512.03 | $1,497.06 |
| 50 | Concrete barrier temporary precast delivered (603.8000) | LF | 1,110 | $20.00 | $12.04 |
| 51 | Concrete barrier temporary precast installed (603.8125) | LF | 2,220 | $5.00 | $6.08 |
| 52 | Anchoring concrete barrier temporary precast (603.8500) | LF | 1,200 | $6.75 | $11.25 |
| 53 | Riprap medium (606.0200) | CY | 20 | $89.00 | $89.00 |
| 54 | Relaid storm sewer 36-inch (608.0136) | LF | 32 | $254.37 | $254.37 |
| 55 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 112 | $238.82 | $238.82 |
| 56 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 198 | $278.40 | $278.40 |
| 57 | Inlet covers type H (611.0624) | EACH | 8 | $1,437.00 | $1,437.00 |
| 58 | Inlets 2X3-FT (611.3230) | EACH | 8 | $3,095.00 | $3,095.00 |
| 59 | MGS guardrail 3 (614.2300) | LF | 2,875 | $24.13 | $24.00 |
| 60 | MGS guardrail 3 HS (614.2310) | LF | 50 | $30.00 | $50.00 |
| 61 | MGS thrie beam transition (614.2500) | LF | 551 | $85.00 | $92.00 |
| 62 | MGS guardrail terminal eat (614.2610) | EACH | 10 | $3,033.00 | $3,700.00 |
| 63 | MGS guardrail terminal type 2 (614.2620) | EACH | 3 | $2,425.00 | $3,700.00 |
| 64 | Anchor post assembly top mount (614.8010) | EACH | 4 | $873.00 | $925.00 |
| 65 | Maintenance and repair of haul roads (project) 01. 1053-04-84 (618.0100) | EACH | 1 | $0.01 | $0.01 |
| 66 | Mobilization (619.1000) | EACH | 1 | $165,845 | $150,000 |
| 67 | Concrete median sloped nose (620.0300) | SF | 27 | $20.04 | $19.84 |
| 68 | Topsoil (625.0100) | SY | 10,410 | $1.41 | $1.41 |
| 69 | Silt fence (628.1504) | LF | 2,624 | $1.50 | $2.18 |
| 70 | Silt fence maintenance (628.1520) | LF | 2,624 | $0.03 | $0.01 |
| 71 | Mobilizations erosion control (628.1905) | EACH | 7 | $50.00 | $250.00 |
| 72 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $50.00 | $50.00 |
| 73 | Erosion mat urban class I type B (628.2008) | SY | 10,460 | $1.50 | $2.10 |
| 74 | Inlet protection type A (628.7005) | EACH | 11 | $100.00 | $120.00 |
| 75 | Inlet protection type C (628.7015) | EACH | 16 | $50.00 | $65.00 |
| 76 | Inlet protection type D (628.7020) | EACH | 77 | $75.00 | $122.00 |
| 77 | Temporary ditch checks (628.7504) | LF | 110 | $8.00 | $8.00 |
| 78 | Culvert pipe checks (628.7555) | EACH | 1 | $20.00 | $15.00 |
| 79 | Rock bags (628.7570) | EACH | 100 | $5.00 | $13.00 |
| 80 | Fertilizer type B (629.0210) | CWT | 7 | $90.00 | $85.00 |
| 81 | Seeding mixture no. 20 (630.0120) | LB | 468 | $7.03 | $6.25 |
| 82 | Seed water (630.0500) | MGAL | 818 | $1.00 | $0.01 |
| 83 | Delineator posts steel (633.0100) | EACH | 529 | $21.70 | $36.00 |
| 84 | Delineator reflectors (633.0500) | EACH | 1,161 | $4.75 | $8.00 |
| 85 | Field office type B (642.5001) | EACH | 1 | $12,540 | $15,750 |
| 86 | Traffic control drums (643.0300) | DAY | 16,841 | $0.50 | $0.50 |
| 87 | Traffic control barricades type III (643.0420) | DAY | 2,804 | $0.50 | $0.50 |
| 88 | Traffic control warning lights type A (643.0705) | DAY | 5,608 | $0.10 | $0.10 |
| 89 | Traffic control warning lights type C (643.0715) | DAY | 840 | $0.10 | $0.10 |
| 90 | Traffic control arrow boards (643.0800) | DAY | 40 | $5.00 | $5.00 |
| 91 | Traffic control signs (643.0900) | DAY | 8,816 | $0.50 | $0.50 |
| 92 | Traffic control covering signs type I (643.0910) | EACH | 6 | $450.00 | $450.00 |
| 93 | Traffic control covering signs type II (643.0920) | EACH | 12 | $25.00 | $25.00 |
| 94 | Traffic control signs fixed message (643.1000) | SF | 234 | $6.90 | $6.90 |
| 95 | Traffic control signs PCMS (643.1050) | DAY | 74 | $6.50 | $6.50 |
| 96 | Traffic control cones 42-inch (643.1070) | DAY | 69,633 | $0.50 | $0.50 |
| 97 | Temporary marking line removable tape 6-inch (643.3180) | LF | 6,000 | $1.65 | $1.65 |
| 98 | Temporary marking line removable tape 10-inch (643.3280) | LF | 3,600 | $3.40 | $3.40 |
| 99 | Traffic control (643.5000) | EACH | 1 | $22,373 | $22,373 |
| 100 | Geotextile type HR (645.0120) | SY | 40 | $25.00 | $25.00 |
| 101 | Marking line epoxy 6-inch (646.2020) | LF | 84,424 | $0.75 | $0.53 |
| 102 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 170,304 | $1.40 | $1.29 |
| 103 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 13,858 | $2.50 | $2.62 |
| 104 | Marking arrow epoxy (646.5020) | EACH | 9 | $330.00 | $306.72 |
| 105 | Marking word epoxy (646.5120) | EACH | 4 | $475.00 | $352.41 |
| 106 | Marking stop line epoxy 18-inch (646.6120) | LF | 231 | $26.00 | $13.05 |
| 107 | Cold weather marking epoxy 6-inch (646.6466) | LF | 25,000 | $0.50 | $0.01 |
| 108 | Cold weather marking epoxy 10- inch (646.6470) | LF | 3,000 | $0.60 | $0.01 |
| 109 | Marking chevron epoxy 24-inch (646.7220) | LF | 1,329 | $15.00 | $21.16 |
| 110 | Marking removal line 4-inch (646.9000) | LF | 1,260 | $0.85 | $0.90 |
| 111 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 562 | $2.00 | $0.67 |
| 112 | Construction staking pipe culverts (650.6000) | EACH | 4 | $64.00 | $109.27 |
| 113 | Construction staking resurfacing reference (650.8000) | LF | 122,948 | $0.07 | $0.11 |
| 114 | Construction staking supplemental control (project) 01. 1053-04-84 (650.9911) | EACH | 1 | $10.00 | $433.96 |
| 115 | Sawing asphalt (690.0150) | LF | 1,793 | $4.24 | $2.25 |
| 116 | Incentive iri ride (740.0440) | DOL | 75,517 | $1.00 | $1.00 |
| 117 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 4,800 | $5.00 | $5.00 |
| 118 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,100 | $5.00 | $5.00 |
| 119 | Special 01. digital speed reduction system (SPV.0045) | DAY | 200 | $138.00 | $138.00 |
| 120 | Special 02. connected arrow boards (SPV.0045) | DAY | 200 | $15.60 | $15.60 |
| 121 | Special 03. connected work zone start and end location markers (SPV.0045) | DAY | 200 | $15.00 | $15.00 |
| 122 | Special 01. connect to existing structure (SPV.0060) | EACH | 3 | $2,500.00 | $2,500.00 |
| 123 | Special 02. reconnect storm sewer (SPV.0060) | EACH | 8 | $500.00 | $500.00 |
| 124 | Special 03. locate and clean existing underdrain (SPV.0060) | EACH | 2 | $26,085 | $26,085 |
| 125 | Special 01. grading shaping and finishing drainage ditches (SPV.0090) | LF | 280 | $24.25 | $24.65 |
| 126 | Special 01. resin binder high friction surface treatment (SPV.0180) | SY | 102,940 | $18.44 | $18.75 |
| 127 | Special 02. removing distressed asphaltic surface milling (SPV.0180) | SY | 800 | $4.23 | $11.67 |