| 1 | Grubbing (201.0205) | STA | 1 | $500.00 | $500.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 4 | $200.00 | $200.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 522 | $6.92 | $3.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 105,800 | $0.64 | $0.70 |
| 5 | Removing curb & gutter (204.0150) | LF | 568 | $23.35 | $23.35 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 76 | $10.00 | $10.00 |
| 7 | Removing (item description) 01. removing apron endwalls 24-inch (204.9060.S) | EACH | 3 | $100.00 | $100.00 |
| 8 | Removing (item description) 01. removing culvert pipe 24-inch (204.9090.S) | LF | 6 | $50.00 | $50.00 |
| 9 | Excavation common (205.0100) | CY | 5,948 | $12.56 | $12.56 |
| 10 | Backfill granular grade 2 (209.2100) | CY | 141 | $25.00 | $25.00 |
| 11 | Prepare foundation for asphaltic paving (project) 01. 6991-00-74 (211.0101) | EACH | 1 | $11,095 | $21,150 |
| 12 | Finishing roadway (project) 01. 6991-00-74 (213.0100) | EACH | 1 | $2,325.00 | $1,750.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,190 | $32.66 | $32.66 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 5,285 | $17.53 | $17.53 |
| 15 | Tack coat (455.0605) | GAL | 8,100 | $3.68 | $3.00 |
| 16 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $3,500.00 | $2,590.00 |
| 17 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,500.00 | $3,525.00 |
| 18 | Incentive density HMA pavement (460.2000) | DOL | 820 | $1.00 | $1.00 |
| 19 | Incentive density PWL HMA pavement (460.2005) | DOL | 7,510 | $1.00 | $1.00 |
| 20 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 4,740 | $1.00 | $1.00 |
| 21 | Incentive air voids HMA pavement (460.2010) | DOL | 12,840 | $1.00 | $1.00 |
| 22 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 1,240 | $67.78 | $81.95 |
| 23 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 12,840 | $67.22 | $74.20 |
| 24 | Asphaltic surface patching (465.0110) | TON | 100 | $189.24 | $225.00 |
| 25 | Asphaltic surface driveways and field entrances (465.0120) | TON | 5 | $149.86 | $153.50 |
| 26 | Asphaltic flumes (465.0315) | SY | 166 | $27.08 | $23.10 |
| 27 | Asphaltic rumble strips, centerline (465.0560) | LF | 22,570 | $0.30 | $0.31 |
| 28 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 7 | $392.65 | $392.65 |
| 29 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 118 | $96.71 | $96.71 |
| 30 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 72 | $121.96 | $121.96 |
| 31 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 100 | $163.98 | $163.98 |
| 32 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $2,373.18 | $2,373.18 |
| 33 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $2,636.26 | $2,636.26 |
| 34 | Concrete gutter 24-inch (601.0205) | LF | 30 | $65.00 | $65.00 |
| 35 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 90 | $65.00 | $65.00 |
| 36 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 358 | $28.00 | $28.00 |
| 37 | Concrete sidewalk 4-inch (602.0405) | SF | 217 | $7.45 | $7.45 |
| 38 | Concrete sidewalk 5-inch (602.0410) | SF | 541 | $7.95 | $7.95 |
| 39 | Concrete sidewalk 7-inch (602.0420) | SF | 220 | $8.45 | $8.45 |
| 40 | Curb ramp detectable warning field yellow (602.0505) | SF | 40 | $45.00 | $45.00 |
| 41 | Adjusting manhole covers (611.8110) | EACH | 4 | $500.00 | $500.00 |
| 42 | Adjusting inlet covers (611.8115) | EACH | 4 | $500.00 | $1,250.00 |
| 43 | Maintenance and repair of haul roads (project) 01. 6991-00-74 (618.0100) | EACH | 1 | $50.00 | $100.00 |
| 44 | Mobilization (619.1000) | EACH | 1 | $30,860 | $129,250 |
| 45 | Concrete median sloped nose (620.0300) | SF | 149 | $13.00 | $13.00 |
| 46 | Landmark reference monuments (621.0100) | EACH | 4 | $600.00 | $100.00 |
| 47 | Water (624.0100) | MGAL | 38 | $45.00 | $45.00 |
| 48 | Topsoil (625.0100) | SY | 14,000 | $1.00 | $1.00 |
| 49 | Erosion bales (628.1104) | EACH | 3 | $50.00 | $50.00 |
| 50 | Silt fence (628.1504) | LF | 1,185 | $2.50 | $2.50 |
| 51 | Silt fence maintenance (628.1520) | LF | 1,185 | $0.03 | $0.03 |
| 52 | Mobilizations erosion control (628.1905) | EACH | 4 | $203.00 | $203.00 |
| 53 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $303.00 | $303.00 |
| 54 | Erosion mat urban class I type B (628.2008) | SY | 14,000 | $1.75 | $1.75 |
| 55 | Inlet protection type C (628.7015) | EACH | 14 | $50.00 | $50.00 |
| 56 | Temporary ditch checks (628.7504) | LF | 50 | $10.00 | $10.00 |
| 57 | Culvert pipe checks (628.7555) | EACH | 25 | $25.00 | $25.00 |
| 58 | Rock bags (628.7570) | EACH | 10 | $10.00 | $10.00 |
| 59 | Seeding mixture no. 40 (630.0140) | LB | 629 | $8.13 | $8.13 |
| 60 | Seed water (630.0500) | MGAL | 314.16 | $5.00 | $5.00 |
| 61 | Markers culvert end (633.5200) | EACH | 10 | $75.00 | $75.00 |
| 62 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 17 | $98.00 | $98.00 |
| 63 | Signs type II reflective H (637.2210) | SF | 85.50 | $25.00 | $25.00 |
| 64 | Signs type II reflective F (637.2230) | SF | 43 | $28.00 | $28.00 |
| 65 | Moving signs type II (638.2102) | EACH | 17 | $175.00 | $175.00 |
| 66 | Field office type B (642.5001) | EACH | 1 | $8,100.00 | $9,250.00 |
| 67 | Traffic control drums (643.0300) | DAY | 12,139 | $0.20 | $0.20 |
| 68 | Traffic control barricades type III (643.0420) | DAY | 415 | $0.80 | $0.80 |
| 69 | Traffic control warning lights type A (643.0705) | DAY | 790 | $0.20 | $0.20 |
| 70 | Traffic control warning lights type C (643.0715) | DAY | 85 | $0.50 | $0.50 |
| 71 | Traffic control signs (643.0900) | DAY | 6,450 | $0.25 | $0.25 |
| 72 | Traffic control signs fixed message (643.1000) | SF | 36 | $17.50 | $17.50 |
| 73 | Temporary marking line paint 6- inch (643.3165) | LF | 23,787 | $0.28 | $0.28 |
| 74 | Temporary marking line removable tape 6-inch (643.3180) | LF | 155 | $2.40 | $2.40 |
| 75 | Traffic control (643.5000) | EACH | 1 | $14,450 | $1,450.00 |
| 76 | Temporary pedestrian surface matting (644.1440) | SF | 35 | $5.50 | $5.50 |
| 77 | Temporary pedestrian barricade (644.1810) | LF | 65 | $4.15 | $4.15 |
| 78 | Marking line epoxy 4-inch (646.1020) | LF | 319 | $2.75 | $2.75 |
| 79 | Marking line epoxy 6-inch (646.2020) | LF | 450 | $2.25 | $2.25 |
| 80 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 72,909 | $1.30 | $1.30 |
| 81 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 2,922 | $2.70 | $2.70 |
| 82 | Marking arrow epoxy (646.5020) | EACH | 20 | $312.90 | $312.90 |
| 83 | Marking word epoxy (646.5120) | EACH | 7 | $359.50 | $359.50 |
| 84 | Marking stop line epoxy 18-inch (646.6120) | LF | 30 | $15.00 | $15.00 |
| 85 | Marking diagonal epoxy 12-inch (646.7120) | LF | 277 | $13.00 | $13.00 |
| 86 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 145 | $12.50 | $12.50 |
| 87 | Marking removal line water blasting 6-inch (646.9012) | LF | 1,463 | $0.75 | $0.75 |
| 88 | Marking removal line water blasting wide (646.9210) | LF | 72 | $16.00 | $16.00 |
| 89 | Construction staking subgrade (650.4500) | LF | 1,828 | $1.00 | $1.00 |
| 90 | Construction staking base (650.5000) | LF | 1,828 | $1.00 | $1.25 |
| 91 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 390 | $3.00 | $2.75 |
| 92 | Construction staking pipe culverts (650.6000) | EACH | 2 | $125.00 | $250.00 |
| 93 | Construction staking resurfacing reference (650.8000) | LF | 22,577 | $0.11 | $0.18 |
| 94 | Construction staking curb ramps (650.9000) | EACH | 4 | $200.00 | $225.00 |
| 95 | Construction staking sidewalk (project) 01. 6991-00-74 (650.9500) | EACH | 1 | $100.00 | $800.00 |
| 96 | Construction staking supplemental control (project) 01. 6991-00-74 (650.9911) | EACH | 1 | $2,500.00 | $1,000.00 |
| 97 | Construction staking slope stakes (650.9920) | LF | 1,828 | $0.75 | $1.00 |
| 98 | Sawing asphalt (690.0150) | LF | 4,457 | $2.90 | $1.10 |
| 99 | Sawing concrete (690.0250) | LF | 56 | $9.58 | $2.00 |
| 100 | Incentive iri ride (740.0440) | DOL | 19,729 | $1.00 | $1.00 |
| 101 | Special 01. fertilizer for lawn type turf (SPV.0030) | CWT | 8.82 | $105.00 | $105.00 |
| 102 | Special 01. reestablish section corner monuments (SPV.0060) | EACH | 8 | $500.00 | $700.00 |
| 103 | Special 01. preparing topsoil for lawn type turf (SPV.0180) | SY | 14,000 | $0.73 | $0.73 |