WisDOT contract 20250408013 bid tabulation
3831-00-72. Let by Wisconsin DOT on April 8, 2025, Kenosha. 5 bids received; low bid $3,153,701 by A.W. Oakes & Son, Inc..
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 149
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A.W. Oakes & Son, Inc. | $3,153,701 | Low |
| 2 | Stark Pavement Corporation | $3,245,295 | +3.0% |
| 3 | Lalonde Contractors Incorporated | $3,327,147 | +5.0% |
| 4 | Michels Road & Stone, Inc. | $3,590,630 | +14% |
| 5 | Zignego Company, Inc. | $3,874,820 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A.W. Oakes & Son, Inc. | 2. Stark Pavement Corporation | 3. Lalonde Contractors Incorporated | 4. Michels Road & Stone, Inc. | 5. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 17,890 | $6.00 | $15.05 | $5.50 | $1.00 | $5.90 |
| 2 | Removing concrete sidewalk (204.0155) | SY | 368 | $10.00 | $5.95 | $9.87 | $10.00 | $9.90 |
| 3 | Removing inlets (204.0220) | EACH | 24 | $400.00 | $500.00 | $500.00 | $500.00 | $669.00 |
| 4 | Removing storm sewer (size) 02. 6- inch (204.0245) | LF | 420 | $15.00 | $12.00 | $12.00 | $12.00 | $17.00 |
| 5 | Removing storm sewer (size) 03. 10-inch (204.0245) | LF | 163 | $15.00 | $17.00 | $17.00 | $17.00 | $17.00 |
| 6 | Removing storm sewer (size) 04. 12-inch (204.0245) | LF | 570 | $15.00 | $18.00 | $18.00 | $18.00 | $17.00 |
| 7 | Removing storm sewer (size) 05. 21-inch (204.0245) | LF | 65 | $15.00 | $19.00 | $19.00 | $19.00 | $17.00 |
| 8 | Removing storm sewer (size) 06. 24-inch (204.0245) | LF | 114 | $20.00 | $22.00 | $22.00 | $22.00 | $17.00 |
| 9 | Sealing pipes (204.0280) | EACH | 4 | $400.00 | $40.00 | $40.00 | $40.00 | $1,257.00 |
| 10 | Removing (item description) 01. removing distribution center (204.9060.S) | EACH | 1 | $1,100.00 | $986.55 | $986.55 | $986.55 | $986.55 |
| 11 | Excavation common (205.0100) | CY | 11,337 | $14.80 | $22.38 | $16.28 | $19.20 | $20.00 |
| 12 | Backfill granular grade 1 (209.1100) | CY | 640 | $20.00 | $40.00 | $40.00 | $40.00 | $25.00 |
| 13 | Finishing roadway (project) 01. 3831-00-72 (213.0100) | EACH | 1 | $3,500.00 | $7,500.00 | $3,608.00 | $7,500.00 | $1,000.00 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 6,616 | $13.80 | $0.01 | $27.78 | $16.80 | $25.00 |
| 15 | Base aggregate open-graded (310.0110) | TON | 137 | $39.00 | $38.00 | $38.00 | $82.00 | $54.50 |
| 16 | Select crushed material (312.0110) | TON | 6,105 | $13.80 | $0.01 | $30.88 | $18.20 | $29.00 |
| 17 | Concrete pavement 8-inch (415.0080) | SY | 13,784 | $56.00 | $56.10 | $53.29 | $54.83 | $70.00 |
| 18 | Drilled dowel bars (416.0620) | EACH | 266 | $15.00 | $14.00 | $17.53 | $17.97 | $30.00 |
| 19 | Concrete collars for pipe (520.8000) | EACH | 35 | $50.00 | $250.00 | $250.00 | $250.00 | $771.00 |
| 20 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 5,443 | $23.00 | $21.25 | $27.59 | $25.00 | $21.40 |
| 21 | Concrete sidewalk 6-inch (602.0415) | SF | 4,656 | $8.50 | $8.50 | $8.48 | $8.00 | $9.71 |
| 22 | Curb ramp detectable warning field yellow (602.0505) | SF | 400 | $50.00 | $42.00 | $42.47 | $40.00 | $51.17 |
| 23 | Concrete driveway 6-inch (602.0810) | SY | 742 | $65.00 | $76.00 | $65.86 | $65.00 | $63.04 |
| 24 | Concrete driveway 8-inch (602.0820) | SY | 114 | $70.00 | $82.00 | $79.01 | $68.00 | $80.11 |
| 25 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 1,121 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 26 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 214 | $93.00 | $120.00 | $120.00 | $120.00 | $80.00 |
| 27 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 84 | $137.00 | $140.00 | $140.00 | $140.00 | $121.00 |
| 28 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 8 | $234.00 | $190.00 | $190.00 | $190.00 | $143.00 |
| 29 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 171 | $290.00 | $250.00 | $250.00 | $250.00 | $267.00 |
| 30 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 291 | $89.00 | $100.00 | $100.00 | $100.00 | $81.00 |
| 31 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 43 | $111.00 | $120.00 | $120.00 | $120.00 | $93.00 |
| 32 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 153 | $106.00 | $140.00 | $140.00 | $140.00 | $103.00 |
| 33 | Reconstructing manholes (611.0420) | EACH | 8 | $1,300.00 | $750.00 | $750.00 | $750.00 | $805.00 |
| 34 | Manhole covers type J-special (611.0535) | EACH | 3 | $600.00 | $700.00 | $700.00 | $700.00 | $830.00 |
| 35 | Inlet covers type H (611.0624) | EACH | 40 | $820.00 | $950.00 | $950.00 | $950.00 | $1,042.00 |
| 36 | Inlet covers type H-S (611.0639) | EACH | 19 | $820.00 | $950.00 | $950.00 | $950.00 | $1,042.00 |
| 37 | Manholes 4-FT diameter (611.2004) | EACH | 2 | $3,300.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,413.00 |
| 38 | Manholes 5-FT diameter (611.2005) | EACH | 3 | $9,000.00 | $7,050.00 | $7,050.00 | $7,050.00 | $6,656.00 |
| 39 | Inlets 3-FT diameter (611.3003) | EACH | 1 | $2,900.00 | $2,300.00 | $2,300.00 | $2,300.00 | $2,357.00 |
| 40 | Inlets 4-FT diameter (611.3004) | EACH | 12 | $3,100.00 | $3,350.00 | $3,350.00 | $3,350.00 | $2,789.00 |
| 41 | Inlets 2X3-FT (611.3230) | EACH | 45 | $2,800.00 | $2,700.00 | $2,700.00 | $2,700.00 | $2,355.00 |
| 42 | Pipe underdrain 6-inch (612.0106) | LF | 1,682 | $12.00 | $35.00 | $35.00 | $18.00 | $6.80 |
| 43 | Insulation board polystyrene (inch) 01. 4-inch (612.0902.S) | SY | 10 | $65.00 | $7.00 | $7.00 | $7.00 | $52.00 |
| 44 | Fence safety (616.0700.S) | LF | 500 | $0.01 | $0.01 | $3.35 | $4.45 | $3.35 |
| 45 | Mobilization (619.1000) | EACH | 1 | $156,000 | $124,794 | $72,436 | $517,552 | $378,000 |
| 46 | Dust control surface treatment (623.0200) | SY | 32,478 | $0.01 | $0.02 | $0.01 | $0.01 | $0.01 |
| 47 | Water (624.0100) | MGAL | 64 | $65.00 | $55.50 | $46.50 | $75.00 | $39.00 |
| 48 | Topsoil (625.0100) | SY | 4,476 | $6.25 | $6.10 | $4.95 | $9.00 | $4.95 |
| 49 | Mulching (627.0200) | SY | 4,476 | $0.01 | $0.01 | $0.38 | $0.15 | $0.38 |
| 50 | Mobilizations erosion control (628.1905) | EACH | 2 | $50.00 | $50.00 | $250.00 | $50.00 | $250.00 |
| 51 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $0.01 | $0.01 | $250.00 | $50.00 | $250.00 |
| 52 | Inlet protection type B (628.7010) | EACH | 17 | $75.00 | $70.00 | $50.00 | $65.00 | $50.00 |
| 53 | Inlet protection type C (628.7015) | EACH | 13 | $75.00 | $70.00 | $55.00 | $65.00 | $55.00 |
| 54 | Inlet protection type D (628.7020) | EACH | 75 | $130.00 | $125.00 | $80.00 | $110.00 | $80.00 |
| 55 | Fertilizer type B (629.0210) | CWT | 7 | $80.00 | $80.00 | $85.00 | $80.00 | $85.00 |
| 56 | Seeding temporary (630.0200) | LB | 125 | $0.01 | $0.01 | $3.25 | $8.00 | $3.25 |
| 57 | Sod water (631.0300) | MGAL | 202 | $6.00 | $5.80 | $38.00 | $45.00 | $38.00 |
| 58 | Sod lawn (631.1000) | SY | 4,476 | $8.00 | $7.75 | $6.95 | $8.45 | $6.95 |
| 59 | Posts tubular steel 2X2-inch X 18- FT (634.0818) | EACH | 24 | $300.00 | $250.00 | $225.00 | $275.00 | $225.00 |
| 60 | Signs type II reflective H (637.2210) | SF | 207.35 | $24.00 | $22.10 | $20.00 | $22.15 | $20.00 |
| 61 | Moving signs type II (638.2102) | EACH | 1 | $75.00 | $60.00 | $110.00 | $200.00 | $110.00 |
| 62 | Removing signs type II (638.2602) | EACH | 46 | $20.00 | $15.00 | $28.00 | $30.00 | $28.00 |
| 63 | Removing small sign supports (638.3000) | EACH | 9 | $20.00 | $15.00 | $28.00 | $30.00 | $28.00 |
| 64 | Erecting state owned signs type II (638.3620) | EACH | 15 | $60.00 | $50.00 | $50.00 | $90.00 | $50.00 |
| 65 | Field office type C (642.5201) | EACH | 1 | $17,000 | $15,000 | $16,768 | $10,000 | $20,000 |
| 66 | Traffic control drums (643.0300) | DAY | 13,857 | $0.30 | $0.25 | $0.25 | $0.25 | $0.25 |
| 67 | Traffic control barricades type III (643.0420) | DAY | 10,782 | $0.50 | $0.45 | $0.45 | $0.45 | $0.45 |
| 68 | Traffic control warning lights type A (643.0705) | DAY | 21,563 | $0.15 | $0.15 | $0.15 | $0.15 | $0.15 |
| 69 | Traffic control signs (643.0900) | DAY | 37,536 | $0.20 | $0.15 | $0.15 | $0.15 | $0.15 |
| 70 | Traffic control covering signs type II (643.0920) | EACH | 5 | $10.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 71 | Traffic control signs fixed message (643.1000) | SF | 114 | $25.00 | $24.00 | $24.00 | $24.00 | $24.00 |
| 72 | Traffic control signs PCMS (643.1050) | DAY | 28 | $35.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 73 | Temporary marking line paint 4- inch (643.3105) | LF | 2,539 | $1.35 | $1.25 | $1.25 | $1.25 | $1.25 |
| 74 | Temporary marking line removable tape 4-inch (643.3150) | LF | 2,541 | $1.10 | $1.00 | $1.00 | $1.00 | $1.00 |
| 75 | Temporary marking line removable tape 8-inch (643.3250) | LF | 387 | $2.20 | $2.00 | $2.00 | $2.00 | $2.00 |
| 76 | Temporary marking arrow paint (643.3505) | EACH | 2 | $100.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 77 | Temporary marking arrow removable tape (643.3550) | EACH | 8 | $55.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 78 | Traffic control (643.5000) | EACH | 1 | $18,000 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 |
| 79 | Temporary pedestrian surface asphalt (644.1410) | SF | 100 | $16.00 | $15.00 | $8.00 | $15.00 | $10.00 |
| 80 | Geotextile type DF schedule A (645.0111) | SY | 1,002 | $3.00 | $7.50 | $7.50 | $6.00 | $2.30 |
| 81 | Geogrid type SR (645.0220) | SY | 8,733 | $3.00 | $0.01 | $1.81 | $1.90 | $0.65 |
| 82 | Marking line epoxy 4-inch (646.1020) | LF | 13,988 | $0.50 | $1.45 | $1.45 | $1.45 | $1.45 |
| 83 | Marking line epoxy 8-inch (646.3020) | LF | 610 | $1.50 | $1.80 | $1.80 | $1.80 | $1.80 |
| 84 | Marking arrow epoxy (646.5020) | EACH | 36 | $375.00 | $230.00 | $230.00 | $230.00 | $230.00 |
| 85 | Marking symbol epoxy (646.5220) | EACH | 26 | $350.00 | $245.00 | $245.00 | $245.00 | $245.00 |
| 86 | Marking stop line epoxy 18-inch (646.6120) | LF | 183 | $16.00 | $16.50 | $16.50 | $16.50 | $16.50 |
| 87 | Marking diagonal epoxy 12-inch (646.7120) | LF | 159 | $15.00 | $12.75 | $12.75 | $12.75 | $12.75 |
| 88 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,514 | $15.00 | $8.50 | $8.50 | $8.50 | $8.50 |
| 89 | Construction staking storm sewer (650.4000) | EACH | 62 | $100.00 | $68.00 | $68.00 | $150.00 | $68.00 |
| 90 | Construction staking subgrade (650.4500) | LF | 2,955 | $0.01 | $2.30 | $2.30 | $0.01 | $0.01 |
| 91 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 5,462 | $1.00 | $0.95 | $0.95 | $1.25 | $0.95 |
| 92 | Construction staking concrete pavement (650.7000) | LF | 2,955 | $0.01 | $1.80 | $1.80 | $2.50 | $1.80 |
| 93 | Construction staking electrical installations (project) 01. 3831-00- 72 (650.8501) | EACH | 1 | $3,500.00 | $1,450.00 | $1,450.00 | $5,000.00 | $1,450.00 |
| 94 | Construction staking curb ramps (650.9000) | EACH | 40 | $100.00 | $156.00 | $156.00 | $150.00 | $156.00 |
| 95 | Construction staking supplemental control (project) 01. 3831-00-72 (650.9911) | EACH | 1 | $5,000.00 | $1,550.00 | $1,550.00 | $5,000.00 | $1,550.00 |
| 96 | Construction staking slope stakes (650.9920) | LF | 2,955 | $0.01 | $0.90 | $0.90 | $1.75 | $0.90 |
| 97 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 4,729 | $7.50 | $7.09 | $7.09 | $7.09 | $7.09 |
| 98 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 151 | $10.00 | $8.91 | $8.91 | $8.91 | $8.91 |
| 99 | Pull boxes steel 24X42-inch (653.0140) | EACH | 2 | $1,600.00 | $1,512.71 | $1,512.71 | $1,512.71 | $1,512.71 |
| 100 | Concrete bases type 5 (654.0105) | EACH | 20 | $1,250.00 | $1,133.07 | $1,133.07 | $1,133.07 | $1,133.07 |
| 101 | Concrete control cabinet bases type L30 (654.0230) | EACH | 1 | $1,500.00 | $1,363.95 | $1,363.95 | $1,363.95 | $1,363.95 |
| 102 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,400 | $1.00 | $0.93 | $0.93 | $0.93 | $0.93 |
| 103 | Electrical wire lighting 10 AWG (655.0615) | LF | 100 | $1.40 | $1.16 | $1.16 | $1.16 | $1.16 |
| 104 | Electrical wire lighting 8 AWG (655.0620) | LF | 15,399 | $1.65 | $1.51 | $1.51 | $1.51 | $1.51 |
| 105 | Electrical wire lighting 1 AWG (655.0640) | LF | 18 | $4.00 | $3.80 | $3.80 | $3.80 | $3.80 |
| 106 | Electrical service main lugs only meter pedestal (location) 01. LCC-1 (656.0401) | EACH | 1 | $900.00 | $789.44 | $789.44 | $789.44 | $789.44 |
| 107 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 20 | $800.00 | $756.79 | $756.79 | $756.79 | $756.79 |
| 108 | Poles type 5-aluminum (657.0322) | EACH | 20 | $2,300.00 | $2,103.27 | $2,103.27 | $2,103.27 | $2,103.27 |
| 109 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 20 | $400.00 | $351.38 | $351.38 | $351.38 | $351.38 |
| 110 | Lighting control cabinets 240/480 30-inch (659.2230) | EACH | 1 | $12,000 | $11,455 | $11,455 | $11,455 | $11,455 |
| 111 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 25 | $50.00 | $45.46 | $45.46 | $45.46 | $45.46 |
| 112 | Sawing concrete (690.0250) | LF | 6,296 | $2.00 | $2.25 | $2.25 | $1.75 | $2.25 |
| 113 | Incentive compressive strength concrete pavement (715.0720) | DOL | 4,392 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 114 | Incentive iri ride (740.0440) | DOL | 1,925 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 115 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 116 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 117 | Special 01. adjusting sanitary manhole (SPV.0060) | EACH | 13 | $1,100.00 | $1,750.00 | $1,750.00 | $1,750.00 | $1,148.00 |
| 118 | Special 02. adjusting water valve boxes (SPV.0060) | EACH | 14 | $400.00 | $250.00 | $250.00 | $250.00 | $339.00 |
| 119 | Special 30. inlet covers type 57 (SPV.0060) | EACH | 1 | $760.00 | $850.00 | $850.00 | $850.00 | $991.00 |
| 120 | Special 31. pipe connection to existing structure (SPV.0060) | EACH | 17 | $400.00 | $175.00 | $175.00 | $175.00 | $1,188.00 |
| 121 | Special 32. removing bulkhead (SPV.0060) | EACH | 4 | $150.00 | $175.00 | $175.00 | $175.00 | $1.00 |
| 122 | Special 50. removing lighting units (SPV.0060) | EACH | 25 | $325.00 | $315.91 | $315.91 | $315.91 | $315.91 |
| 123 | Special 51. municipal LED luminaire (SPV.0060) | EACH | 20 | $370.00 | $351.64 | $351.67 | $351.64 | $351.64 |
| 124 | Special 60. 16" 45 degree bend, MJ (SPV.0060) | EACH | 2 | $2,200.00 | $3,100.00 | $3,100.00 | $3,100.00 | $2,213.00 |
| 125 | Special 61. 16" BF valve & box, MJ (SPV.0060) | EACH | 3 | $6,600.00 | $8,080.00 | $8,080.00 | $8,080.00 | $6,346.00 |
| 126 | Special 62. 8" gate valve & box, MJ (SPV.0060) | EACH | 4 | $3,500.00 | $4,750.00 | $4,750.00 | $4,750.00 | $2,922.00 |
| 127 | Special 63. 16" solid sleeve, MJ (SPV.0060) | EACH | 4 | $2,000.00 | $3,600.00 | $3,600.00 | $3,600.00 | $4,457.00 |
| 128 | Special 64. 6" solid sleeve, MJ (SPV.0060) | EACH | 1 | $600.00 | $1,025.00 | $1,025.00 | $1,025.00 | $3,626.00 |
| 129 | Special 65. 8" cap, MJ (SPV.0060) | EACH | 1 | $440.00 | $770.00 | $770.00 | $770.00 | $2,926.00 |
| 130 | Special 66. 6" cap, MJ (SPV.0060) | EACH | 4 | $370.00 | $650.00 | $650.00 | $650.00 | $2,520.00 |
| 131 | Special 67. 16" X 8" anchor tee, MJ (SPV.0060) | EACH | 1 | $2,700.00 | $4,000.00 | $4,000.00 | $4,000.00 | $3,422.00 |
| 132 | Special 68. reconnect service 0.75" with 1" copper (SPV.0060) | EACH | 36 | $2,000.00 | $2,100.00 | $2,100.00 | $2,100.00 | $4,335.00 |
| 133 | Special 69. reconnect service 1" with 1" copper (SPV.0060) | EACH | 1 | $2,000.00 | $2,350.00 | $2,350.00 | $2,350.00 | $3,886.00 |
| 134 | Special 70. reconnect service 1.5" with 1.5" copper (SPV.0060) | EACH | 1 | $2,300.00 | $3,100.00 | $3,100.00 | $3,100.00 | $4,739.00 |
| 135 | Special 71. steamer hydrant, MJ (SPV.0060) | EACH | 3 | $7,000.00 | $8,090.00 | $8,090.00 | $8,090.00 | $9,521.00 |
| 136 | Special 72. 6" gate valve, MJ (SPV.0060) | EACH | 3 | $2,700.00 | $2,075.00 | $2,075.00 | $2,075.00 | $2,087.00 |
| 137 | Special 73. 8" X 6" anchor tee, MJ (SPV.0060) | EACH | 2 | $1,000.00 | $1,415.00 | $1,415.00 | $1,415.00 | $909.00 |
| 138 | Special 74. 6" 45-degree bend, MJ (SPV.0060) | EACH | 2 | $600.00 | $1,025.00 | $1,025.00 | $1,025.00 | $429.00 |
| 139 | Special 75. 6" X 6" anchor tee, MJ (SPV.0060) | EACH | 1 | $800.00 | $1,065.00 | $1,065.00 | $1,065.00 | $3,935.00 |
| 140 | Special 76. 6" plug, MJ (SPV.0060) | EACH | 1 | $300.00 | $525.00 | $525.00 | $525.00 | $1,518.00 |
| 141 | Special 77. 8" X 6" reducer, MJ (SPV.0060) | EACH | 1 | $700.00 | $950.00 | $950.00 | $950.00 | $425.00 |
| 142 | Special 01. pavement cleanup project 3831-00-72 (SPV.0075) | HRS | 40 | $200.00 | $175.00 | $207.00 | $190.00 | $200.00 |
| 143 | Special 01. concrete curb & gutter 42-inch type A (SPV.0090) | LF | 10 | $75.00 | $110.00 | $120.40 | $40.00 | $80.39 |
| 144 | Special 31. pipe underdrain exploration (SPV.0090) | LF | 100 | $10.00 | $12.00 | $12.00 | $12.00 | $37.50 |
| 145 | Special 32. storm sewer lateral exploration (SPV.0090) | LF | 100 | $10.00 | $12.00 | $12.00 | $12.00 | $52.00 |
| 146 | Special 60. 16" PVC C-900 pipe (SPV.0090) | LF | 30 | $600.00 | $250.00 | $250.00 | $250.00 | $197.00 |
| 147 | Special 61. 8" PVC C-900 pipe (SPV.0090) | LF | 1,442 | $140.00 | $152.00 | $152.00 | $152.00 | $145.00 |
| 148 | Special 62. 6" D.I. pipe, class 53 (hydrant lead) poly-encased (SPV.0090) | LF | 60 | $160.00 | $160.00 | $160.00 | $160.00 | $251.00 |
| 149 | Special 63. 6" PVC C-900 pipe (SPV.0090) | LF | 15 | $130.00 | $131.00 | $131.00 | $131.00 | $210.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.