WisDOT contract 20250408015 bid tabulation
T Lawrence, CTH Ee; Mourning Dove Ct to Lawrence Drive (CTH EE, Brown County T Lawrence, CTH EE). Let by Wisconsin DOT on April 8, 2025, Brown. 3 bids received; low bid $1,625,181 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 141
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $1,625,181 | Low |
| 2 | Michels Road & Stone, Inc. | $1,737,002 | +7.0% |
| 3 | Sommers Construction Co., Inc. | $1,930,311 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Michels Road & Stone, Inc. | 3. Sommers Construction Co., Inc. |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 2 | $0.01 | $1,250.00 | $500.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 4,630 | $3.98 | $6.00 | $7.35 |
| 3 | Removing concrete sidewalk (204.0155) | SY | 490 | $5.04 | $7.00 | $8.85 |
| 4 | Removing inlets (204.0220) | EACH | 3 | $325.00 | $325.00 | $355.00 |
| 5 | Removing storm sewer (size) 01. 15-inch (204.0245) | LF | 53 | $20.00 | $20.00 | $15.00 |
| 6 | Removing storm sewer (size) 02. 18-inch (204.0245) | LF | 125 | $20.00 | $20.00 | $15.00 |
| 7 | Removing storm sewer (size) 03. 30-inch (204.0245) | LF | 62 | $27.00 | $27.00 | $20.00 |
| 8 | Excavation common (205.0100) | CY | 2,260 | $25.76 | $24.20 | $19.65 |
| 9 | Excavation marsh (205.0400) | CY | 340 | $15.96 | $19.20 | $37.65 |
| 10 | Borrow (208.0100) | CY | 3,730 | $0.01 | $0.01 | $9.90 |
| 11 | Select borrow (208.1100) | CY | 510 | $30.77 | $39.50 | $38.60 |
| 12 | Finishing roadway (project) 01. 9277-01-71 (213.0100) | EACH | 1 | $2,000.00 | $5,000.00 | $2,500.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 150 | $38.77 | $50.00 | $29.00 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 6,000 | $19.23 | $15.40 | $18.85 |
| 15 | Base aggregate open-graded (310.0115) | CY | 20 | $50.00 | $50.00 | $57.00 |
| 16 | Breaker run (311.0110) | TON | 210 | $19.23 | $15.50 | $18.85 |
| 17 | Coloring concrete wisdot red (405.0100) | CY | 100 | $85.00 | $94.00 | $71.40 |
| 18 | Concrete pavement 9-inch (415.0090) | SY | 3,740 | $68.81 | $83.65 | $74.98 |
| 19 | Concrete truck apron 12-inch (415.2010) | SY | 300 | $85.27 | $86.00 | $83.45 |
| 20 | Concrete pavement joint filling (415.4100) | SY | 4,280 | $2.50 | $3.08 | $1.50 |
| 21 | Tack coat (455.0605) | GAL | 340 | $4.50 | $4.50 | $4.50 |
| 22 | Incentive density HMA pavement (460.2000) | DOL | 580 | $1.00 | $1.00 | $1.00 |
| 23 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 660 | $98.60 | $98.60 | $98.60 |
| 24 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 244 | $123.80 | $123.80 | $123.80 |
| 25 | Asphaltic surface driveways and field entrances (465.0120) | TON | 10 | $198.25 | $198.25 | $198.25 |
| 26 | Temporary shoring (structure) 01. R-05-0116 (511.1200) | SF | 575 | $0.01 | $1.00 | $38.00 |
| 27 | Concrete collars for pipe (520.8000) | EACH | 3 | $550.00 | $550.00 | $1,768.00 |
| 28 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 1 | $1,756.00 | $1,756.00 | $1,800.00 |
| 29 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 1 | $2,280.00 | $2,280.00 | $2,228.00 |
| 30 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 1 | $2,788.00 | $2,788.00 | $2,650.00 |
| 31 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 210 | $16.75 | $22.00 | $23.85 |
| 32 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 1,848 | $18.50 | $24.00 | $21.45 |
| 33 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 697 | $21.35 | $22.50 | $25.40 |
| 34 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 726 | $20.85 | $22.00 | $22.45 |
| 35 | Concrete curb & gutter 4-inch sloped 36-inch type R (601.0580) | LF | 298 | $23.00 | $24.00 | $24.45 |
| 36 | Concrete curb pedestrian (601.0600) | LF | 74 | $45.00 | $38.00 | $54.00 |
| 37 | Concrete sidewalk 4-inch (602.0405) | SF | 10,740 | $6.40 | $6.60 | $6.30 |
| 38 | Concrete sidewalk 6-inch (602.0415) | SF | 1,290 | $7.70 | $7.00 | $7.15 |
| 39 | Curb ramp detectable warning field yellow (602.0505) | SF | 256 | $32.00 | $42.00 | $33.00 |
| 40 | Concrete surface drains (602.3010) | CY | 8 | $650.00 | $686.00 | $990.00 |
| 41 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 224 | $68.00 | $68.00 | $92.00 |
| 42 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 33 | $72.00 | $72.00 | $96.00 |
| 43 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 409 | $79.00 | $79.00 | $101.00 |
| 44 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 244 | $149.00 | $149.00 | $169.00 |
| 45 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 59 | $166.00 | $166.00 | $190.00 |
| 46 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424) | LF | 283 | $199.00 | $199.00 | $215.00 |
| 47 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (608.2429) | LF | 197 | $255.00 | $255.00 | $272.25 |
| 48 | Reconstructing manholes (611.0420) | EACH | 1 | $567.00 | $567.00 | $3,000.00 |
| 49 | Manhole covers type J-special (611.0535) | EACH | 7 | $539.00 | $539.00 | $494.00 |
| 50 | Inlet covers type H (611.0624) | EACH | 2 | $762.00 | $762.00 | $703.50 |
| 51 | Inlet covers type HM (611.0627) | EACH | 1 | $762.00 | $762.00 | $703.50 |
| 52 | Inlet covers type H-S (611.0639) | EACH | 10 | $762.00 | $762.00 | $703.50 |
| 53 | Inlet covers type MS (611.0642) | EACH | 3 | $531.00 | $531.00 | $487.00 |
| 54 | Inlet covers type T (611.0652) | EACH | 2 | $1,035.00 | $1,035.00 | $960.50 |
| 55 | Manholes 4-FT diameter (611.2004) | EACH | 2 | $3,640.00 | $3,640.00 | $4,272.00 |
| 56 | Manholes 6-FT diameter (611.2006) | EACH | 3 | $7,245.00 | $7,245.00 | $7,875.00 |
| 57 | Manholes 7-FT diameter (611.2007) | EACH | 1 | $10,060 | $10,060 | $10,284 |
| 58 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $11,975 | $11,975 | $12,060 |
| 59 | Inlets 4-FT diameter (611.3004) | EACH | 3 | $3,304.00 | $3,304.00 | $4,242.00 |
| 60 | Inlets 2X3-FT (611.3230) | EACH | 7 | $2,736.00 | $2,736.00 | $2,743.00 |
| 61 | Inlets median 2 grate (611.3902) | EACH | 3 | $4,515.00 | $4,515.00 | $4,219.00 |
| 62 | Pipe underdrain 6-inch (612.0106) | LF | 270 | $20.00 | $20.00 | $35.50 |
| 63 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 192 | $14.00 | $14.00 | $36.00 |
| 64 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 90 | $17.00 | $17.00 | $36.00 |
| 65 | Mobilization (619.1000) | EACH | 1 | $146,000 | $185,505 | $194,060 |
| 66 | Concrete median sloped nose (620.0300) | SF | 456 | $13.00 | $18.00 | $12.50 |
| 67 | Water (624.0100) | MGAL | 140 | $0.01 | $45.00 | $15.00 |
| 68 | Topsoil (625.0100) | SY | 6,930 | $4.65 | $5.50 | $8.25 |
| 69 | Topsoil (625.0105) | CY | 60 | $65.50 | $41.00 | $81.00 |
| 70 | Mobilizations erosion control (628.1905) | EACH | 5 | $125.00 | $125.00 | $125.00 |
| 71 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $75.00 | $75.00 | $75.00 |
| 72 | Erosion mat class I type B (628.2004) | SY | 2,150 | $1.50 | $1.50 | $1.50 |
| 73 | Erosion mat urban class I type B (628.2008) | SY | 4,780 | $1.90 | $1.90 | $1.90 |
| 74 | Inlet protection type A (628.7005) | EACH | 23 | $10.00 | $10.00 | $10.00 |
| 75 | Inlet protection type B (628.7010) | EACH | 4 | $62.00 | $62.00 | $62.00 |
| 76 | Inlet protection type C (628.7015) | EACH | 19 | $68.00 | $68.00 | $68.00 |
| 77 | Temporary ditch checks (628.7504) | LF | 195 | $6.90 | $6.90 | $6.90 |
| 78 | Culvert pipe checks (628.7555) | EACH | 7 | $18.00 | $18.00 | $18.00 |
| 79 | Fertilizer type B (629.0210) | CWT | 6 | $100.00 | $100.00 | $100.00 |
| 80 | Seeding mixture no. 40 (630.0140) | LB | 320 | $8.50 | $8.50 | $8.50 |
| 81 | Seed water (630.0500) | MGAL | 160 | $5.00 | $5.00 | $5.00 |
| 82 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 27 | $90.00 | $90.00 | $90.00 |
| 83 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 2 | $96.00 | $96.00 | $96.00 |
| 84 | Signs type II reflective H (637.2210) | SF | 209.04 | $22.00 | $22.00 | $22.00 |
| 85 | Signs type II reflective F (637.2230) | SF | 42.50 | $22.65 | $22.65 | $22.65 |
| 86 | Moving signs type II (638.2102) | EACH | 2 | $80.00 | $80.00 | $80.00 |
| 87 | Removing signs type II (638.2602) | EACH | 7 | $38.00 | $38.00 | $38.00 |
| 88 | Removing small sign supports (638.3000) | EACH | 7 | $38.00 | $38.00 | $38.00 |
| 89 | Moving small sign supports (638.4000) | EACH | 3 | $100.00 | $100.00 | $100.00 |
| 90 | Field office type B (642.5001) | EACH | 1 | $8,500.00 | $10,000 | $12,500 |
| 91 | Traffic control barricades type II (643.0410) | DAY | 164 | $0.50 | $0.50 | $4.58 |
| 92 | Traffic control barricades type III (643.0420) | DAY | 2,296 | $0.55 | $0.55 | $0.69 |
| 93 | Traffic control warning lights type A (643.0705) | DAY | 3,608 | $0.15 | $0.15 | $0.23 |
| 94 | Traffic control signs (643.0900) | DAY | 11,562 | $0.17 | $0.17 | $0.33 |
| 95 | Traffic control signs PCMS (643.1050) | DAY | 28 | $35.00 | $35.00 | $70.58 |
| 96 | Traffic control (643.5000) | EACH | 1 | $6,850.00 | $6,850.00 | $2,248.47 |
| 97 | Geotextile type DF schedule A (645.0111) | SY | 195 | $3.00 | $3.00 | $7.00 |
| 98 | Marking line epoxy 6-inch (646.2020) | LF | 5,346 | $0.59 | $0.59 | $1.50 |
| 99 | Marking line epoxy 10-inch (646.4020) | LF | 182 | $1.28 | $1.28 | $3.00 |
| 100 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 153 | $16.02 | $16.02 | $15.00 |
| 101 | Marking diagonal epoxy 12-inch (646.7120) | LF | 144 | $15.87 | $15.87 | $14.00 |
| 102 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 234 | $15.35 | $15.35 | $13.00 |
| 103 | Marking curb epoxy (646.8120) | LF | 40 | $7.80 | $7.80 | $25.00 |
| 104 | Marking island nose epoxy (646.8220) | EACH | 12 | $306.24 | $306.24 | $175.00 |
| 105 | Construction staking storm sewer (650.4000) | EACH | 29 | $40.11 | $40.11 | $69.00 |
| 106 | Construction staking subgrade (650.4500) | LF | 1,685 | $0.01 | $0.01 | $0.01 |
| 107 | Construction staking base (650.5000) | LF | 622 | $1.17 | $1.17 | $1.00 |
| 108 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 762 | $0.63 | $0.63 | $1.25 |
| 109 | Construction staking structure layout (structure) 01. R-05-0116 (650.6501) | EACH | 1 | $743.21 | $743.21 | $980.00 |
| 110 | Construction staking electrical installations (project) 01. 9277-01- 71 (650.8501) | EACH | 1 | $908.80 | $908.80 | $1,300.00 |
| 111 | Construction staking curb ramps (650.9000) | EACH | 16 | $85.16 | $85.16 | $100.00 |
| 112 | Construction staking sidewalk (project) 01. 9277-01-71 (650.9500) | EACH | 1 | $1,542.24 | $1,542.24 | $100.00 |
| 113 | Construction staking supplemental control (project) 01. 9277-01-71 (650.9911) | EACH | 1 | $412.00 | $412.00 | $10.00 |
| 114 | Construction staking slope stakes (650.9920) | LF | 1,388 | $0.82 | $0.82 | $1.02 |
| 115 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,346 | $10.00 | $10.00 | $10.00 |
| 116 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 48 | $10.00 | $10.00 | $10.00 |
| 117 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 8 | $1,950.00 | $1,950.00 | $1,950.00 |
| 118 | Concrete bases type 5 (654.0105) | EACH | 11 | $1,575.00 | $1,575.00 | $1,575.00 |
| 119 | Concrete control cabinet bases type L24 (654.0224) | EACH | 1 | $2,400.00 | $2,400.00 | $2,400.00 |
| 120 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,122 | $0.80 | $0.80 | $0.80 |
| 121 | Electrical wire lighting 8 AWG (655.0620) | LF | 5,447 | $2.00 | $2.00 | $2.00 |
| 122 | Electrical service meter breaker pedestal (location) 01. LCC A (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $1,950.00 |
| 123 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 11 | $595.00 | $595.00 | $595.00 |
| 124 | Poles type 5-aluminum (657.0322) | EACH | 11 | $1,650.00 | $1,650.00 | $1,650.00 |
| 125 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 11 | $365.00 | $365.00 | $365.00 |
| 126 | Luminaires utility LED A (659.1115) | EACH | 11 | $340.00 | $340.00 | $340.00 |
| 127 | Lighting control cabinets 120/240 24-inch (659.2124) | EACH | 1 | $8,100.00 | $8,100.00 | $8,100.00 |
| 128 | Sawing asphalt (690.0150) | LF | 84 | $3.00 | $1.95 | $5.00 |
| 129 | Sawing concrete (690.0250) | LF | 100 | $3.00 | $2.35 | $6.00 |
| 130 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,122 | $1.00 | $1.00 | $1.00 |
| 131 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 |
| 132 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,200 | $5.00 | $5.00 | $5.00 |
| 133 | Special 01. inlets 5-FT diameter (SPV.0060) | EACH | 1 | $5,200.00 | $5,200.00 | $6,063.00 |
| 134 | Special 02. inlets 6-FT diameter (SPV.0060) | EACH | 2 | $6,801.00 | $6,801.00 | $7,620.00 |
| 135 | Special 03. inlets 7-FT diameter (SPV.0060) | EACH | 1 | $9,302.00 | $9,302.00 | $9,845.00 |
| 136 | Special 04. inlets 8-FT diameter (SPV.0060) | EACH | 1 | $11,511 | $11,511 | $11,837 |
| 137 | Special 01. weed barrier (SPV.0165) | SF | 3,170 | $0.34 | $0.34 | $0.34 |
| 138 | Special 02. colored and stamped concrete sidewalk 4-inch (SPV.0165) | SF | 210 | $15.70 | $20.00 | $12.40 |
| 139 | Special 03. insulation board 2-inch (SPV.0165) | SF | 384 | $4.00 | $4.00 | $4.00 |
| 140 | Special 04. wall modular block mechanically stabilized earth R-05- 0116 (SPV.0165) | SF | 445 | $127.03 | $93.00 | $280.00 |
| 141 | Special 01. double shredded hardwood mulch (SPV.0180) | SY | 360 | $13.00 | $13.00 | $13.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.