| 1 | Removing small pipe culverts (203.0100) | EACH | 6 | $350.00 | $215.00 |
| 2 | Removing structure (structure) 01. 68110006631 (203.0220) | EACH | 1 | $1,825.00 | $950.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 40 | $18.00 | $38.50 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 395 | $8.35 | $9.40 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 67,750 | $0.70 | $0.94 |
| 6 | Removing curb (204.0130) | LF | 70 | $20.00 | $12.50 |
| 7 | Removing guardrail (204.0165) | LF | 136 | $5.00 | $2.50 |
| 8 | Removing fence (204.0170) | LF | 135 | $3.90 | $3.00 |
| 9 | Excavation common (205.0100) | CY | 2,590 | $23.50 | $16.38 |
| 10 | Prepare foundation for asphaltic paving (project) 01. 6590-01-73 (211.0101) | EACH | 1 | $18,250 | $16,365 |
| 11 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 30 | $145.00 | $91.00 |
| 12 | Finishing roadway (project) 01. 6590-01-73 (213.0100) | EACH | 1 | $2,400.00 | $2,200.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,615 | $26.40 | $28.40 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,010 | $17.00 | $26.07 |
| 15 | Select crushed material (312.0115) | CY | 585 | $30.00 | $49.05 |
| 16 | HMA cold weather paving (450.4000) | TON | 770 | $0.01 | $0.01 |
| 17 | Tack coat (455.0605) | GAL | 5,365 | $3.25 | $3.78 |
| 18 | Incentive density HMA pavement (460.2000) | DOL | 4,940 | $1.00 | $1.00 |
| 19 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 7,710 | $61.40 | $69.10 |
| 20 | Asphaltic surface (465.0105) | TON | 1,250 | $85.40 | $94.00 |
| 21 | Asphaltic surface patching (465.0110) | TON | 1,670 | $85.70 | $91.70 |
| 22 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 38 | $143.50 | $136.26 |
| 23 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 150 | $201.00 | $186.50 |
| 24 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $1,580.00 | $1,560.00 |
| 25 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 8 | $1,883.00 | $1,925.00 |
| 26 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 112 | $214.50 | $190.50 |
| 27 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 6 | $1,702.50 | $1,985.50 |
| 28 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 45 | $90.49 | $91.40 |
| 29 | Riprap medium (606.0200) | CY | 4 | $100.00 | $100.00 |
| 30 | MGS guardrail 3 (614.2300) | LF | 75 | $29.00 | $29.60 |
| 31 | MGS guardrail terminal eat (614.2610) | EACH | 2 | $3,900.00 | $3,600.00 |
| 32 | Maintenance and repair of haul roads (project) 01. 6590-01-73 (618.0100) | EACH | 1 | $1.00 | $50.00 |
| 33 | Mobilization (619.1000) | EACH | 1 | $71,400 | $34,990 |
| 34 | Concrete median sloped nose (620.0300) | SF | 21 | $21.48 | $21.70 |
| 35 | Water (624.0100) | MGAL | 115 | $25.00 | $25.00 |
| 36 | Topsoil (625.0100) | SY | 2,420 | $7.50 | $6.58 |
| 37 | Silt fence (628.1504) | LF | 4,735 | $2.22 | $2.68 |
| 38 | Silt fence maintenance (628.1520) | LF | 5,075 | $0.01 | $0.10 |
| 39 | Mobilizations erosion control (628.1905) | EACH | 4 | $400.00 | $250.00 |
| 40 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $125.00 | $250.00 |
| 41 | Erosion mat class I type A (628.2002) | SY | 2,420 | $1.32 | $1.90 |
| 42 | Inlet protection type B (628.7010) | EACH | 2 | $72.00 | $65.00 |
| 43 | Temporary ditch checks (628.7504) | LF | 170 | $9.00 | $12.50 |
| 44 | Culvert pipe checks (628.7555) | EACH | 45 | $15.00 | $20.00 |
| 45 | Rock bags (628.7570) | EACH | 145 | $15.00 | $15.00 |
| 46 | Fertilizer type B (629.0210) | CWT | 1.57 | $90.00 | $100.00 |
| 47 | Seeding mixture no. 30 (630.0130) | LB | 115 | $7.00 | $6.50 |
| 48 | Seed water (630.0500) | MGAL | 60 | $1.00 | $25.00 |
| 49 | Markers culvert end (633.5200) | EACH | 16 | $58.00 | $68.90 |
| 50 | Moving signs type II (638.2102) | EACH | 12 | $125.00 | $25.00 |
| 51 | Moving small sign supports (638.4000) | EACH | 10 | $100.00 | $85.00 |
| 52 | Field office type B (642.5001) | EACH | 1 | $8,250.00 | $7,650.00 |
| 53 | Traffic control drums (643.0300) | DAY | 470 | $1.00 | $0.75 |
| 54 | Traffic control barricades type III (643.0420) | DAY | 672 | $1.65 | $1.00 |
| 55 | Traffic control warning lights type A (643.0705) | DAY | 448 | $0.65 | $0.50 |
| 56 | Traffic control signs (643.0900) | DAY | 5,117 | $0.85 | $0.25 |
| 57 | Traffic control covering signs type I (643.0910) | EACH | 3 | $500.00 | $275.00 |
| 58 | Traffic control covering signs type II (643.0920) | EACH | 5 | $150.00 | $105.00 |
| 59 | Traffic control signs fixed message (643.1000) | SF | 81.20 | $25.00 | $17.25 |
| 60 | Temporary marking line paint 6- inch (643.3165) | LF | 45,950 | $0.21 | $0.21 |
| 61 | Traffic control (643.5000) | EACH | 1 | $4,500.00 | $13,325 |
| 62 | Geotextile type HR (645.0120) | SY | 12 | $6.00 | $8.00 |
| 63 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 66,800 | $1.30 | $1.30 |
| 64 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 240 | $2.62 | $2.62 |
| 65 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $2,981.25 | $2,981.25 |
| 66 | Marking stop line epoxy 18-inch (646.6120) | LF | 35 | $13.00 | $13.00 |
| 67 | Cold weather marking epoxy 6-inch (646.6466) | LF | 7,000 | $0.29 | $0.29 |
| 68 | Marking island nose epoxy (646.8220) | EACH | 3 | $241.40 | $241.40 |
| 69 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 45 | $0.67 | $0.67 |
| 70 | Construction staking pipe culverts (650.6000) | EACH | 8 | $109.27 | $109.27 |
| 71 | Construction staking resurfacing reference (650.8000) | LF | 21,306 | $0.09 | $0.09 |
| 72 | Construction staking supplemental control (project) 01. 6590-01-73 (650.9911) | EACH | 1 | $433.96 | $433.96 |
| 73 | Construction staking slope stakes (650.9920) | LF | 500 | $0.87 | $0.87 |
| 74 | Sawing asphalt (690.0150) | LF | 670 | $1.90 | $5.30 |
| 75 | Incentive iri ride (740.0440) | DOL | 16,140 | $1.00 | $1.00 |
| 76 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 |
| 77 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,260 | $5.00 | $5.00 |
| 78 | Special 01. joint sealing and ties for existing concrete pipes (SPV.0060) | EACH | 1 | $2,145.00 | $8,200.00 |
| 79 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 9,900 | $1.80 | $4.60 |