| 1 | Clearing (201.0105) | STA | 7 | $600.00 | $200.00 |
| 2 | Grubbing (201.0205) | STA | 7 | $600.00 | $1,250.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 1 | $1,500.00 | $370.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 71 | $15.00 | $13.00 |
| 5 | Excavation common (205.0100) | CY | 4,074 | $37.00 | $23.40 |
| 6 | Borrow (208.0100) | CY | 524 | $22.73 | $0.01 |
| 7 | Prepare foundation for asphaltic paving (project) 01. 7864-00-74 (211.0101) | EACH | 1 | $18,000 | $55,703 |
| 8 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 107 | $168.00 | $103.55 |
| 9 | Finishing roadway (project) 01. 7864-00-74 (213.0100) | EACH | 1 | $1.00 | $12,470 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,445 | $18.36 | $25.35 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,293 | $16.36 | $21.65 |
| 12 | Tack coat (455.0605) | GAL | 5,061 | $4.02 | $4.02 |
| 13 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 3,368 | $92.90 | $92.90 |
| 14 | HMA pavement 5 MT 58-34 S (460.6245) | TON | 2,812 | $97.79 | $97.79 |
| 15 | Asphaltic surface (465.0105) | TON | 16 | $187.31 | $187.31 |
| 16 | Asphaltic surface driveways and field entrances (465.0120) | TON | 636 | $140.71 | $140.71 |
| 17 | Culvert pipe class III-A 18-inch (520.3318) | LF | 122 | $69.00 | $52.00 |
| 18 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 6 | $500.00 | $450.00 |
| 19 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 210 | $32.20 | $52.45 |
| 20 | Concrete sidewalk 4-inch (602.0405) | SF | 230 | $6.35 | $10.39 |
| 21 | Curb ramp detectable warning field yellow (602.0505) | SF | 40 | $54.35 | $62.51 |
| 22 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 32 | $60.00 | $67.84 |
| 23 | Concrete driveway 6-inch (602.0810) | SY | 95 | $78.30 | $102.17 |
| 24 | Concrete surface drains (602.3010) | CY | 1 | $345.00 | $1,278.39 |
| 25 | Maintenance and repair of haul roads (project) 01. 7864-00-74 (618.0100) | EACH | 1 | $1.00 | $100.00 |
| 26 | Mobilization (619.1000) | EACH | 1 | $224,245 | $168,500 |
| 27 | Water (624.0100) | MGAL | 473 | $1.00 | $37.45 |
| 28 | Topsoil (625.0100) | SY | 14,215 | $3.56 | $5.60 |
| 29 | Mulching (627.0200) | SY | 10,355 | $0.55 | $0.32 |
| 30 | Silt fence (628.1504) | LF | 545 | $2.40 | $2.00 |
| 31 | Silt fence maintenance (628.1520) | LF | 545 | $0.01 | $0.01 |
| 32 | Mobilizations erosion control (628.1905) | EACH | 2 | $50.00 | $520.00 |
| 33 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $50.00 | $1.00 |
| 34 | Erosion mat urban class I type A (628.2006) | SY | 6,835 | $1.80 | $1.45 |
| 35 | Erosion mat class II type A (628.2021) | SY | 19 | $25.00 | $7.80 |
| 36 | Culvert pipe checks (628.7555) | EACH | 8 | $25.00 | $15.00 |
| 37 | Fertilizer type A (629.0205) | CWT | 10 | $135.00 | $80.00 |
| 38 | Seeding mixture no. 40 (630.0140) | LB | 257 | $18.00 | $20.30 |
| 39 | Seed water (630.0500) | MGAL | 162 | $3.00 | $0.01 |
| 40 | Delineators flexible (633.0200) | EACH | 4 | $100.00 | $62.00 |
| 41 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 21 | $80.00 | $110.00 |
| 42 | Signs type II reflective H (637.2210) | SF | 43.50 | $20.00 | $18.90 |
| 43 | Signs type II reflective F (637.2230) | SF | 22.75 | $22.00 | $22.00 |
| 44 | Moving signs type II (638.2102) | EACH | 11 | $100.00 | $70.00 |
| 45 | Removing signs type II (638.2602) | EACH | 7 | $25.00 | $44.00 |
| 46 | Removing small sign supports (638.3000) | EACH | 5 | $25.00 | $44.00 |
| 47 | Moving small sign supports (638.4000) | EACH | 11 | $150.00 | $70.00 |
| 48 | Field office type C (642.5201) | EACH | 1 | $20,000 | $24,200 |
| 49 | Traffic control drums (643.0300) | DAY | 30,290 | $0.35 | $0.19 |
| 50 | Traffic control barricades type II (643.0410) | DAY | 4,730 | $0.30 | $0.66 |
| 51 | Traffic control barricades type III (643.0420) | DAY | 2,075 | $0.96 | $0.77 |
| 52 | Traffic control warning lights type A (643.0705) | DAY | 7,355 | $0.06 | $0.14 |
| 53 | Traffic control warning lights type C (643.0715) | DAY | 250 | $0.10 | $0.63 |
| 54 | Traffic control signs (643.0900) | DAY | 20,065 | $0.60 | $0.32 |
| 55 | Traffic control covering signs type II (643.0920) | EACH | 2 | $20.00 | $150.05 |
| 56 | Traffic control signs PCMS (643.1050) | DAY | 218 | $30.00 | $25.00 |
| 57 | Traffic control (643.5000) | EACH | 1 | $3,000.00 | $20,416 |
| 58 | Marking line epoxy 4-inch (646.1020) | LF | 32,387 | $0.45 | $0.45 |
| 59 | Marking line epoxy 8-inch (646.3020) | LF | 201 | $2.00 | $2.00 |
| 60 | Marking arrow epoxy (646.5020) | EACH | 1 | $320.00 | $320.00 |
| 61 | Marking stop line epoxy 18-inch (646.6120) | LF | 99 | $14.00 | $14.00 |
| 62 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 101 | $20.00 | $20.00 |
| 63 | Locating no-passing zones (648.0100) | MI | 1.92 | $1,275.00 | $1,275.00 |
| 64 | Construction staking base (650.5000) | LF | 10,130 | $0.75 | $0.10 |
| 65 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 210 | $2.00 | $1.60 |
| 66 | Construction staking resurfacing reference (650.8000) | LF | 880 | $0.05 | $0.25 |
| 67 | Construction staking curb ramps (650.9000) | EACH | 3 | $10.00 | $140.00 |
| 68 | Construction staking supplemental control (project) 01. 7864-00-74 (650.9911) | EACH | 1 | $500.00 | $2,200.00 |
| 69 | Construction staking slope stakes (650.9920) | LF | 10,300 | $0.75 | $0.70 |
| 70 | Sawing asphalt (690.0150) | LF | 1,668 | $1.80 | $1.75 |
| 71 | Sawing concrete (690.0250) | LF | 31 | $2.35 | $9.85 |
| 72 | Incentive iri ride (740.0440) | DOL | 8,115 | $1.00 | $1.00 |
| 73 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 | $5.00 |
| 74 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 75 | Special 01. rectangular rapid flashing beacon (RRFB) system CTH OO NB sta 101+00 (SPV.0060) | EACH | 1 | $7,000.00 | $9,465.00 |
| 76 | Special 02. rectangualr rapid flashing beason (RRFB) system CTH OO SB sta 100+85 (SPV.0060) | EACH | 1 | $7,000.00 | $9,465.00 |
| 77 | Special 03. radar driver feedback sign sta 19+50 (SPV.0060) | EACH | 1 | $5,737.50 | $6,320.00 |
| 78 | Special 04. radar driver feedback sign sta 98+00 (SPV.0060) | EACH | 1 | $5,737.50 | $6,320.00 |
| 79 | Special 01. salvaged asphaltic pavement milling (SPV.0195) | TON | 17,154 | $7.17 | $14.87 |
| 80 | Special 02. salvaged asphaltic pavement base (SPV.0195) | TON | 14,685 | $10.92 | $8.30 |