WisDOT contract 20250513002 bid tabulation
1204-00-60. Let by Wisconsin DOT on May 13, 2025, Iowa. 5 bids received; low bid $3,424,276 by Norcon Corporation.
- Owner
- Wisconsin DOT
- Letting
- 13 MAY 2025
- Pay items
- 36
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Norcon Corporation | $3,424,276 | Low |
| 2 | Fahrner Asphalt Sealers, LLC | $3,564,150 | +4.0% |
| 3 | Ram Construction Services of Michigan, I | $3,707,377 | +8.0% |
| 4 | Truesdell Corporation of Wisconsin, Inc. | $3,727,727 | +9.0% |
| 5 | American Civil Constructors West Coast L | $4,535,000 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Norcon Corporation | 2. Fahrner Asphalt Sealers, LLC | 3. Ram Construction Services of Michigan, I | 4. Truesdell Corporation of Wisconsin, Inc. | 5. American Civil Constructors West Coast L |
|---|---|---|---|---|---|---|---|---|
| 1 | Finishing roadway (project) 01. 1204-00-61 (213.0100) | EACH | 1 | $4,000.00 | $2,000.00 | $2,500.00 | $100.00 | $16,026 |
| 2 | Preparation decks type 1 (509.0301) | SY | 11 | $225.00 | $384.70 | $450.00 | $375.00 | $1,200.00 |
| 3 | Preparation decks type 2 (509.0302) | SY | 6 | $265.00 | $705.28 | $750.00 | $1,200.00 | $1,800.00 |
| 4 | Sawing pavement deck preparation areas (509.0310.S) | LF | 110 | $6.00 | $1.00 | $5.00 | $10.00 | $30.00 |
| 5 | Concrete masonry deck repair (509.2100.S) | CY | 1 | $2,400.00 | $2,502.00 | $270.00 | $9,300.00 | $2,500.00 |
| 6 | Mobilization (619.1000) | EACH | 1 | $221,960 | $312,860 | $98,400 | $237,289 | $450,000 |
| 7 | Traffic control drums (643.0300) | DAY | 18,240 | $0.25 | $0.25 | $0.25 | $0.20 | $0.25 |
| 8 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 1,700 | $40.47 | $40.47 | $40.47 | $24.00 | $42.00 |
| 9 | Traffic control barricades type III (643.0420) | DAY | 4,590 | $0.50 | $0.50 | $0.50 | $0.55 | $0.50 |
| 10 | Traffic control warning lights type A (643.0705) | DAY | 9,180 | $0.12 | $0.12 | $0.12 | $0.15 | $0.12 |
| 11 | Traffic control warning lights type C (643.0715) | DAY | 12,000 | $0.12 | $0.12 | $0.12 | $0.15 | $0.12 |
| 12 | Connected arrow board (643.0810.S) | DAY | 350 | $20.00 | $20.00 | $20.00 | $7.50 | $20.00 |
| 13 | Traffic control signs (643.0900) | DAY | 5,740 | $0.50 | $0.50 | $0.50 | $0.55 | $0.50 |
| 14 | Traffic control covering signs type I (643.0910) | EACH | 10 | $150.00 | $150.00 | $150.00 | $250.00 | $150.00 |
| 15 | Traffic control covering signs type II (643.0920) | EACH | 29 | $25.00 | $25.00 | $25.00 | $99.00 | $25.00 |
| 16 | Traffic control signs PCMS (643.1050) | DAY | 167 | $35.00 | $35.00 | $35.00 | $14.00 | $35.00 |
| 17 | Traffic control cones 42-inch (643.1070) | DAY | 78,160 | $0.15 | $0.15 | $0.15 | $0.18 | $0.15 |
| 18 | Connected work zone start and end location markers (643.1220.S) | DAY | 700 | $12.00 | $12.00 | $12.00 | $5.00 | $12.00 |
| 19 | Temporary marking line removable tape 6-inch (643.3180) | LF | 170,930 | $1.10 | $1.10 | $1.10 | $1.75 | $1.10 |
| 20 | Temporary marking line removable tape 10-inch (643.3280) | LF | 2,800 | $2.00 | $2.00 | $2.00 | $3.65 | $2.00 |
| 21 | Traffic control interim lane closure (643.4100) | EACH | 21 | $800.00 | $800.00 | $800.00 | $1,200.00 | $1,000.00 |
| 22 | Traffic control (643.5000) | EACH | 1 | $38,000 | $38,000 | $191,598 | $100,000 | $54,000 |
| 23 | Marking line epoxy 6-inch (646.2020) | LF | 1,980 | $1.15 | $1.15 | $1.15 | $0.80 | $1.20 |
| 24 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 20,440 | $0.85 | $0.85 | $0.85 | $2.20 | $0.90 |
| 25 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 162,750 | $1.30 | $1.30 | $1.30 | $1.30 | $1.30 |
| 26 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 20,440 | $7.80 | $7.80 | $7.80 | $8.25 | $7.80 |
| 27 | Marking line epoxy 10-inch (646.4020) | LF | 70 | $3.00 | $3.00 | $3.00 | $4.20 | $3.00 |
| 28 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 10,280 | $12.50 | $12.50 | $12.50 | $14.00 | $12.50 |
| 29 | Marking chevron epoxy 24-inch (646.7220) | LF | 510 | $11.25 | $11.25 | $11.25 | $22.00 | $11.25 |
| 30 | Marking removal line 4-inch (646.9000) | LF | 71,270 | $0.08 | $0.08 | $0.08 | $0.16 | $0.15 |
| 31 | Marking removal line grooved contrast permanent tape 4-inch (646.9055) | LF | 2,800 | $0.33 | $0.33 | $0.33 | $2.30 | $0.40 |
| 32 | Marking removal line grooved contrast permanent tape 8-inch (646.9155) | LF | 5,430 | $0.40 | $0.40 | $0.40 | $3.00 | $0.45 |
| 33 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 34 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,160 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 35 | Special 01. resin binder high friction surface treatment (SPV.0180) | SY | 110,200 | $19.26 | $19.74 | $21.40 | $19.50 | $26.00 |
| 36 | Special 02. high friction surface treatment polymer overlay (SPV.0180) | SY | 3,434 | $42.91 | $41.20 | $47.45 | $48.00 | $65.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.