| 1 | Grubbing (201.0210) | SY | 1,100 | $5.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 7 | $500.00 |
| 3 | Removing structure (structure) 01. 72-inch CMCP, sta. 292+25 (203.0220) | EACH | 1 | $6,000.00 |
| 4 | Removing structure over waterway minimal debris (structure) 01. B-62- 987 (203.0260) | EACH | 1 | $10,000 |
| 5 | Removing structure over waterway minimal debris (structure) 02. B-62- 988 (203.0260) | EACH | 1 | $10,000 |
| 6 | Removing asphaltic surface (204.0110) | SY | 92 | $5.00 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 821 | $9.05 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 101,294 | $2.27 |
| 9 | Removing curb & gutter (204.0150) | LF | 1,128 | $5.00 |
| 10 | Removing guardrail (204.0165) | LF | 9,138 | $2.00 |
| 11 | Removing inlets (204.0220) | EACH | 4 | $400.00 |
| 12 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 60 | $20.00 |
| 13 | Removing storm sewer (size) 02. 24-inch (204.0245) | LF | 20 | $20.00 |
| 14 | Removing storm sewer (size) 03. 30-inch (204.0245) | LF | 6 | $22.00 |
| 15 | Excavation common (205.0100) | CY | 7,209 | $20.00 |
| 16 | Excavation, hauling, and disposal of creosote contaminated soil and management of contaminated groundwater (205.0505.S) | TON | 196 | $100.00 |
| 17 | Excavation for structures bridges (structure) 01. B-62-265 (206.1001) | EACH | 1 | $3,000.00 |
| 18 | Excavation for structures bridges (structure) 02. B-62-266 (206.1001) | EACH | 1 | $3,000.00 |
| 19 | Backfill granular grade 2 (209.2500) | TON | 4,800 | $21.00 |
| 20 | Backfill structure type A (210.1500) | TON | 577 | $25.00 |
| 21 | Prepare foundation for asphaltic paving (project) 01. 5820-01-68 (211.0101) | EACH | 1 | $14,001 |
| 22 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 67 | $103.93 |
| 23 | Finishing roadway (project) 01. 5820-01-68 (213.0100) | EACH | 1 | $6,625.00 |
| 24 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,163 | $27.00 |
| 25 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 11,600 | $20.00 |
| 26 | Select crushed material (312.0110) | TON | 6,600 | $24.00 |
| 27 | Tack coat (455.0605) | GAL | 11,649 | $3.10 |
| 28 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $8,500.00 |
| 29 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $8,500.00 |
| 30 | Incentive density PWL HMA pavement (460.2005) | DOL | 6,470 | $1.00 |
| 31 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 6,490 | $1.00 |
| 32 | Incentive air voids HMA pavement (460.2010) | DOL | 18,951 | $1.00 |
| 33 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 18,951 | $83.79 |
| 34 | Asphaltic surface (465.0105) | TON | 310 | $167.63 |
| 35 | Asphaltic surface patching (465.0110) | TON | 1,200 | $147.70 |
| 36 | Asphaltic surface driveways and field entrances (465.0120) | TON | 20 | $287.31 |
| 37 | Asphaltic flumes (465.0315) | SY | 260 | $57.15 |
| 38 | Concrete masonry bridges (502.0100) | CY | 416 | $1,100.00 |
| 39 | Protective surface treatment (502.3200) | SY | 314 | $8.00 |
| 40 | Pigmented surface sealer (502.3210) | SY | 131 | $12.00 |
| 41 | Bar steel reinforcement HS structures (505.0400) | LB | 7,850 | $1.20 |
| 42 | Bar steel reinforcement HS coated structures (505.0600) | LB | 54,070 | $1.26 |
| 43 | Rubberized membrane waterproofing (516.0500) | SY | 36 | $30.00 |
| 44 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 4 | $1,200.00 |
| 45 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 4 | $700.00 |
| 46 | Apron endwalls for culvert pipe 42- inch (520.1042) | EACH | 1 | $1,900.00 |
| 47 | Apron endwalls for culvert pipe 48- inch (520.1048) | EACH | 2 | $1,900.00 |
| 48 | Culvert pipe class III 48-inch (520.3148) | LF | 60 | $170.00 |
| 49 | Culvert pipe class III-A 18-inch (520.3318) | LF | 72 | $80.00 |
| 50 | Culvert pipe class III-A 24-inch (520.3324) | LF | 94 | $85.00 |
| 51 | Concrete collars for pipe (520.8000) | EACH | 9 | $600.00 |
| 52 | Cleaning culvert pipes (520.8700) | EACH | 1 | $2,250.00 |
| 53 | Culvert pipe liners (size) 01. 60- inch (520.9700.S) | LF | 178 | $451.00 |
| 54 | Cleaning culvert pipes for liner verification (520.9750.S) | EACH | 1 | $2,600.00 |
| 55 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 30 | $76.00 |
| 56 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 22 | $115.00 |
| 57 | Culvert pipe corrugated steel 30- inch (521.3130) | LF | 10 | $115.00 |
| 58 | Culvert pipe corrugated steel 42- inch (521.3142) | LF | 12 | $160.00 |
| 59 | Pre-boring rock or consolidated materials (550.0020) | LF | 84 | $200.00 |
| 60 | Pile points (550.0500) | EACH | 14 | $400.00 |
| 61 | Piling cip concrete 10 3/4 X 0.50- inch (550.2108) | LF | 760 | $60.00 |
| 62 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 13,374 | $21.00 |
| 63 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 102 | $21.00 |
| 64 | Riprap medium (606.0200) | CY | 33 | $100.00 |
| 65 | Riprap heavy (606.0300) | CY | 340 | $85.00 |
| 66 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 56 | $80.00 |
| 67 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 31 | $80.00 |
| 68 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 342 | $80.00 |
| 69 | Storm sewer pipe class III-A 24- inch (608.3024) | LF | 57 | $83.00 |
| 70 | Storm sewer pipe class III-A 30- inch (608.3030) | LF | 48 | $99.00 |
| 71 | Manhole covers type J (611.0530) | EACH | 1 | $500.00 |
| 72 | Inlet covers type F (611.0615) | EACH | 12 | $1,800.00 |
| 73 | Inlet covers type MS (611.0642) | EACH | 14 | $900.00 |
| 74 | Inlet covers type V (611.0654) | EACH | 1 | $1,000.00 |
| 75 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $3,200.00 |
| 76 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $3,200.00 |
| 77 | Inlets 2X2-FT (611.3220) | EACH | 1 | $2,500.00 |
| 78 | Inlets 2.5X3-FT (611.3253) | EACH | 9 | $3,000.00 |
| 79 | Inlets median 1 grate (611.3901) | EACH | 2 | $3,800.00 |
| 80 | Inlets median 2 grate (611.3902) | EACH | 6 | $4,800.00 |
| 81 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 262 | $15.00 |
| 82 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 8 | $200.00 |
| 83 | Steel thrie beam structure approach (614.0200) | LF | 62.10 | $95.00 |
| 84 | Steel plate beam guard class A (614.0305) | LF | 25 | $27.00 |
| 85 | Steel plate beam guard short radius (614.0345) | LF | 87.50 | $27.00 |
| 86 | Steel plate beam guard short radius terminal (614.0390) | EACH | 3 | $2,033.00 |
| 87 | MGS guardrail 3 (614.2300) | LF | 2,350 | $26.93 |
| 88 | MGS guardrail 3 K (614.2330) | LF | 6,262.50 | $37.53 |
| 89 | MGS guardrail 3 L (614.2340) | LF | 225 | $29.00 |
| 90 | MGS guardrail short radius (614.2350) | LF | 100 | $27.00 |
| 91 | MGS thrie beam transition (614.2500) | LF | 197 | $95.00 |
| 92 | MGS guardrail terminal eat (614.2610) | EACH | 21 | $3,433.00 |
| 93 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $3,033.00 |
| 94 | MGS guardrail short radius terminal (614.2630) | EACH | 3 | $2,033.00 |
| 95 | Fence safety (616.0700.S) | LF | 250 | $7.00 |
| 96 | Maintenance and repair of haul roads (project) 01. 5820-01-68 (618.0100) | EACH | 1 | $6,500.00 |
| 97 | Mobilization (619.1000) | EACH | 1 | $363,984 |
| 98 | Water (624.0100) | MGAL | 140 | $30.00 |
| 99 | Salvaged topsoil (625.0500) | SY | 17,900 | $2.00 |
| 100 | Mulching (627.0200) | SY | 6,000 | $0.45 |
| 101 | Silt fence (628.1504) | LF | 3,500 | $2.25 |
| 102 | Silt fence maintenance (628.1520) | LF | 7,000 | $0.01 |
| 103 | Mobilizations erosion control (628.1905) | EACH | 8 | $201.00 |
| 104 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $301.00 |
| 105 | Erosion mat urban class I type A (628.2006) | SY | 3,574 | $1.95 |
| 106 | Erosion mat class II type C (628.2027) | SY | 4,973 | $4.13 |
| 107 | Erosion mat class III type C (628.2037) | SY | 2,401 | $11.50 |
| 108 | Turbidity barriers (628.6005) | SY | 250 | $41.00 |
| 109 | Inlet protection type A (628.7005) | EACH | 21 | $120.00 |
| 110 | Inlet protection type B (628.7010) | EACH | 9 | $65.00 |
| 111 | Inlet protection type C (628.7015) | EACH | 12 | $55.00 |
| 112 | Temporary ditch checks (628.7504) | LF | 800 | $8.00 |
| 113 | Culvert pipe checks (628.7555) | EACH | 41 | $32.00 |
| 114 | Fertilizer type B (629.0210) | CWT | 12 | $125.00 |
| 115 | Seeding mixture no. 30 (630.0130) | LB | 315 | $9.25 |
| 116 | Seeding mixture no. 40 (630.0140) | LB | 8 | $25.00 |
| 117 | Seeding temporary (630.0200) | LB | 473 | $5.15 |
| 118 | Seed water (630.0500) | MGAL | 401 | $1.00 |
| 119 | Markers culvert end (633.5200) | EACH | 26 | $75.00 |
| 120 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 30 | $102.00 |
| 121 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 17 | $115.00 |
| 122 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 6 | $125.00 |
| 123 | Moving signs type II (638.2102) | EACH | 54 | $100.00 |
| 124 | Removing signs type II (638.2602) | EACH | 11 | $32.00 |
| 125 | Removing small sign supports (638.3000) | EACH | 64 | $32.00 |
| 126 | Moving small sign supports (638.4000) | EACH | 1 | $200.00 |
| 127 | Field office type C (642.5201) | EACH | 1 | $10,000 |
| 128 | Traffic control drums (643.0300) | DAY | 39,600 | $0.15 |
| 129 | Traffic control barricades type III (643.0420) | DAY | 2,900 | $1.50 |
| 130 | Traffic control warning lights type A (643.0705) | DAY | 5,800 | $0.50 |
| 131 | Traffic control signs (643.0900) | DAY | 31,960 | $0.16 |
| 132 | Traffic control covering signs type II (643.0920) | EACH | 14 | $105.00 |
| 133 | Traffic control signs PCMS (643.1050) | DAY | 28 | $45.00 |
| 134 | Temporary marking line paint 6- inch (643.3165) | LF | 185,750 | $0.25 |
| 135 | Traffic control (643.5000) | EACH | 1 | $20,650 |
| 136 | Geotextile type DF schedule A (645.0111) | SY | 134 | $8.00 |
| 137 | Geotextile type HR (645.0120) | SY | 815 | $6.00 |
| 138 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 130,050 | $1.40 |
| 139 | Cold weather marking epoxy 6-inch (646.6466) | LF | 65,025 | $0.29 |
| 140 | Locating no-passing zones (648.0100) | MI | 6.20 | $400.00 |
| 141 | Construction staking storm sewer (650.4000) | EACH | 32 | $250.00 |
| 142 | Construction staking subgrade (650.4500) | LF | 550 | $0.01 |
| 143 | Construction staking base (650.5000) | LF | 550 | $0.01 |
| 144 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 13,476 | $0.75 |
| 145 | Construction staking pipe culverts (650.6000) | EACH | 5 | $300.00 |
| 146 | Construction staking structure layout (structure) 01. B-62-265 (650.6501) | EACH | 1 | $3,000.00 |
| 147 | Construction staking structure layout (structure) 02. B-62-266 (650.6501) | EACH | 1 | $3,000.00 |
| 148 | Construction staking resurfacing reference (650.8000) | LF | 32,175 | $0.10 |
| 149 | Construction staking supplemental control (project) 01. 5820-01-68 (650.9911) | EACH | 1 | $4,500.00 |
| 150 | Construction staking slope stakes (650.9920) | LF | 11,770 | $0.75 |
| 151 | Sawing asphalt (690.0150) | LF | 16,155 | $1.29 |
| 152 | Sawing concrete (690.0250) | LF | 24 | $4.00 |
| 153 | Incentive strength concrete structures (715.0502) | DOL | 2,496 | $1.00 |
| 154 | Incentive iri ride (740.0440) | DOL | 21,730 | $1.00 |
| 155 | Maintaining bird deterrent system (station) 01. 31+13 (999.2005.S) | EACH | 1 | $1.00 |
| 156 | Maintaining bird deterrent system (station) 02. 45+88 (999.2005.S) | EACH | 1 | $1.00 |
| 157 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 |
| 158 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 |
| 159 | Special 01. incentive density PWL HMA pavement (SPV.0055) | DOL | 5,530 | $1.00 |
| 160 | Special 02. incentive density HMA pavement longitudinal joints (SPV.0055) | DOL | 5,680 | $1.00 |
| 161 | Special 01. verify landmark reference monuments (SPV.0060) | EACH | 2 | $500.00 |
| 162 | Special 02. inlets 5-FT diameter (SPV.0060) | EACH | 2 | $5,000.00 |
| 163 | Special 01. remove existing timber piling (SPV.0090) | LF | 48 | $50.00 |
| 164 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 2,700 | $3.77 |
| 165 | Special 01. reclaimed asphalt (SPV.0195) | TON | 1,700 | $27.00 |