WisDOT contract 20250513008 bid tabulation
IH 94 East West Freeway; Bluemound Rd to Moreland Blvd (IH 094, Waukesha County IH 94, East West Freeway). Let by Wisconsin DOT on May 13, 2025, Waukesha. 3 bids received.
- Owner
- Wisconsin DOT
- Letting
- 13 MAY 2025
- Pay items
- 24
- Data through
- 10 NOV 2026
2 of the 3 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 2 | Truesdell Corporation of Wisconsin, Inc. | $439,439 | 0.0% |
| 3 | Fahrner Asphalt Sealers, LLC | $468,248 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Truesdell Corporation of Wisconsin, Inc. | 2. Fahrner Asphalt Sealers, LLC |
|---|---|---|---|---|---|
| 1 | Mobilization (619.1000) | EACH | 1 | $38,141 | $44,000 |
| 2 | Inlet protection type D (628.7020) | EACH | 10 | $300.00 | $100.00 |
| 3 | Traffic control drums (643.0300) | DAY | 1,894 | $0.55 | $0.50 |
| 4 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 24 | $250.00 | $235.00 |
| 5 | Traffic control barricades type III (643.0420) | DAY | 88 | $2.15 | $2.00 |
| 6 | Traffic control warning lights type A (643.0705) | DAY | 176 | $0.55 | $0.50 |
| 7 | Traffic control warning lights type C (643.0715) | DAY | 539 | $0.55 | $0.50 |
| 8 | Connected arrow board (643.0810.S) | DAY | 29 | $20.50 | $19.30 |
| 9 | Traffic control signs (643.0900) | DAY | 309 | $1.60 | $1.50 |
| 10 | Traffic control covering signs type II (643.0920) | EACH | 14 | $69.00 | $65.00 |
| 11 | Traffic control signs PCMS (643.1050) | DAY | 66 | $24.00 | $22.50 |
| 12 | Connected work zone start and end location markers (643.1220.S) | DAY | 15 | $34.00 | $32.00 |
| 13 | Temporary marking line paint 6- inch (643.3165) | LF | 9,270 | $0.65 | $0.60 |
| 14 | Temporary marking line paint 10- inch (643.3265) | LF | 1,330 | $0.85 | $0.80 |
| 15 | Traffic control interim lane closure (643.4100) | EACH | 24 | $690.00 | $650.00 |
| 16 | Traffic control (643.5000) | EACH | 1 | $12,280 | $11,550 |
| 17 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 1,375 | $2.40 | $2.27 |
| 18 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 9,295 | $2.55 | $2.40 |
| 19 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 310 | $4.15 | $3.90 |
| 20 | Marking replace line wet reflective epoxy 10-inch (646.4041.S) | LF | 860 | $4.25 | $4.00 |
| 21 | Marking chevron epoxy 24-inch (646.7220) | LF | 50 | $15.50 | $14.60 |
| 22 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 40 | $48.00 | $45.00 |
| 23 | Special 01. traffic control close- open freeway entrance ramp (SPV.0060) | EACH | 3 | $430.00 | $405.00 |
| 24 | Special 01. resin binder high friction surface treatment (SPV.0180) | SY | 14,300 | $22.00 | $24.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.