WisDOT contract 20250513014 bid tabulation

V Raymond - 76th St; Intersection With CTH G (CTH U, Racine County V Raymond - 76th ST). Let by Wisconsin DOT on May 13, 2025, Racine. 5 bids received; low bid $1,699,119 by Michels Road & Stone, Inc..

Owner
Wisconsin DOT
Letting
13 MAY 2025
Pay items
110
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Michels Road & Stone, Inc.$1,699,119Low
2James Peterson Sons, Inc.$1,791,304+5.0%
3Wanasek, the Corp.$1,819,360+7.0%
4Willkomm Excav. & Grading$1,881,996+11%
5A.W. Oakes & Son, Inc.$1,947,531+15%
WisDOT contract 20250513014: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Michels Road & Stone, Inc.2. James Peterson Sons, Inc.3. Wanasek, the Corp.4. Willkomm Excav. & Grading5. A.W. Oakes & Son, Inc.
1Removing small pipe culverts (203.0100)EACH3$200.00$740.00$685.00$647.08$1,250.00
2Removing (item description) 001. removing rumble strips (204.9180.S)SY77$12.00$12.00$13.00$12.49$15.00
3Excavation common (205.0100)CY17,900$10.90$15.26$10.00$11.09$12.00
4Finishing roadway (project) 001. 2803-03-71 (213.0100)EACH1$2,500.00$2,500.00$3,800.00$3,284.83$5,000.00
5Base aggregate dense 3/4-inch (305.0110)TON340$45.00$43.29$38.00$59.27$39.75
6Base aggregate dense 1 1/4-inch (305.0120)TON9,660$18.00$18.48$19.50$26.04$17.00
7Base aggregate dense 3-inch (305.0130)TON10,170$18.00$22.93$17.50$25.65$0.01
8Select crushed material (312.0110)TON11,200$22.60$23.88$25.00$26.37$26.00
9Coloring concrete wisdot red (405.0100)CY117$120.00$120.00$127.00$125.85$300.00
10Concrete truck apron 12-inch (415.2010)SY352$98.47$98.47$104.00$103.27$110.00
11Tack coat (455.0605)GAL650$2.00$2.00$3.00$2.10$2.00
12Incentive density HMA pavement (460.2000)DOL1,800$1.00$1.00$1.00$1.00$1.00
13HMA pavement 3 LT 58-28 S (460.5223)TON1,780$67.20$67.20$71.00$70.48$70.00
14HMA pavement 4 LT 58-28 S (460.5224)TON1,030$75.90$75.90$80.00$79.60$80.00
15Asphaltic surface driveways and field entrances (465.0120)TON20$115.00$115.00$121.00$120.61$120.00
16Asphaltic flumes (465.0315)SY112$35.00$35.00$37.00$36.71$40.00
17Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH4$150.00$425.00$215.00$146.83$300.00
18Culvert pipe corrugated steel 12- inch (521.3112)LF18$200.00$100.00$75.00$130.05$100.00
19Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF76$150.00$182.00$160.00$131.09$155.00
20Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH2$350.00$1,250.00$750.00$1,223.90$1,400.00
21Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH2$650.00$1,550.00$1,445.00$1,665.42$2,100.00
22Concrete curb & gutter 18-inch type A (601.0405)LF170$30.00$30.00$32.00$31.46$39.00
23Concrete curb & gutter 30-inch type D (601.0411)LF2,165$22.52$22.52$24.00$23.62$29.50
24Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF1,267$27.95$27.95$30.00$29.31$27.00
25Concrete sidewalk 4-inch (602.0405)SF9,880$4.50$4.50$4.75$5.00$4.75
26Riprap medium (606.0200)CY6$235.00$285.00$150.00$234.92$150.00
27Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF70$150.00$112.00$122.00$127.95$135.00
28Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF136$125.00$80.00$72.00$97.53$105.00
29Manhole covers type J (611.0530)EACH1$850.00$500.00$465.00$434.19$800.00
30Inlet covers type H (611.0624)EACH1$880.00$750.00$710.00$668.06$1,050.00
31Inlet covers type MS (611.0642)EACH1$550.00$500.00$475.00$467.74$800.00
32Inlet covers type T (611.0652)EACH2$1,000.00$1,025.00$990.00$978.49$1,300.00
33Manholes 3-FT diameter (611.2003)EACH1$3,800.00$3,650.00$4,150.00$3,494.45$3,900.00
34Inlets 2X2.5-FT (611.3225)EACH2$3,500.00$2,150.00$2,280.00$2,014.66$3,200.00
35Inlets 2X3-FT (611.3230)EACH1$3,200.00$2,450.00$2,630.00$2,228.60$3,500.00
36Inlets median 1 grate (611.3901)EACH1$4,000.00$2,650.00$3,190.00$3,126.34$3,700.00
37Pipe underdrain 6-inch (612.0106)LF1,050$5.00$15.00$18.00$26.22$10.00
38Drain tile exploration (612.0700)LF400$8.00$20.00$14.00$28.32$5.00
39Maintenance and repair of haul roads (project) 001. 2803-03-71 (618.0100)EACH1$1.00$100.00$1,480.00$741.03$0.01
40Mobilization (619.1000)EACH1$115,385$58,365$165,000$44,169$431,550
41Concrete median sloped nose (620.0300)SF156$26.00$26.00$28.00$27.27$17.00
42Water (624.0100)MGAL240$60.00$44.00$18.00$35.03$41.00
43Salvaged topsoil (625.0500)SY11,820$3.30$2.28$1.85$2.37$2.00
44Silt fence (628.1504)LF3,140$1.60$1.60$2.70$2.15$2.00
45Silt fence maintenance (628.1520)LF3,140$0.05$0.05$0.10$0.01$0.10
46Mobilizations erosion control (628.1905)EACH5$10.00$10.00$265.00$262.19$15.00
47Mobilizations emergency erosion control (628.1910)EACH4$10.00$10.00$320.00$262.19$15.00
48Erosion mat urban class I type A (628.2006)SY11,700$1.68$1.68$1.85$1.89$2.00
49Inlet protection type A (628.7005)EACH4$50.00$50.00$160.00$110.12$75.00
50Inlet protection type D (628.7020)EACH3$115.00$115.00$130.00$104.87$125.00
51Temporary ditch checks (628.7504)LF114$6.00$6.00$10.00$7.29$10.00
52Culvert pipe checks (628.7555)EACH4$45.00$45.00$26.00$20.98$50.00
53Tracking pads (628.7560)EACH4$100.00$45.00$3,000.00$2,480.22$0.01
54Rock bags (628.7570)EACH7$45.00$45.00$27.00$16.78$50.00
55Fertilizer type B (629.0210)CWT6$100.00$100.00$83.00$94.39$110.00
56Seeding mixture no. 30 (630.0130)LB220$10.00$10.00$9.00$9.39$15.00
57Seeding temporary (630.0200)LB320$4.00$4.00$6.00$3.93$5.00
58Seed water (630.0500)MGAL260$10.00$10.00$80.00$15.73$15.00
59Posts wood 4X6-inch X 14-FT (634.0614)EACH8$140.00$140.00$80.00$99.63$150.00
60Posts wood 4X6-inch X 16-FT (634.0616)EACH25$140.00$140.00$95.00$104.88$150.00
61Posts wood 4X6-inch X 18-FT (634.0618)EACH13$140.00$140.00$115.00$115.36$150.00
62Posts wood 4X6-inch X 22-FT (634.0622)EACH12$185.00$185.00$160.00$131.09$200.00
63Signs type II reflective H (637.2210)SF527$19.00$19.00$23.00$22.02$20.00
64Signs type II reflective F (637.2230)SF150$19.00$19.00$24.00$23.07$20.00
65Moving signs type II (638.2102)EACH3$100.00$100.00$80.00$115.36$110.00
66Removing signs type II (638.2602)EACH27$25.00$25.00$37.00$30.41$30.00
67Removing small sign supports (638.3000)EACH21$25.00$25.00$37.00$30.41$30.00
68Field office type B (642.5001)EACH1$7,750.00$18,000$11,200$9,229.04$20,000
69Traffic control drums (643.0300)DAY990$0.50$0.50$1.00$1.05$1.00
70Traffic control barricades type III (643.0420)DAY1,386$0.70$0.70$0.50$0.52$0.50
71Traffic control warning lights type A (643.0705)DAY2,772$0.15$0.15$0.25$0.10$0.20
72Traffic control signs (643.0900)DAY18,414$0.17$0.17$0.25$0.16$0.20
73Traffic control covering signs type I (643.0910)EACH4$245.00$245.00$320.00$314.63$350.00
74Traffic control covering signs type II (643.0920)EACH4$110.00$110.00$27.00$26.22$30.00
75Traffic control signs PCMS (643.1050)DAY28$32.50$32.50$85.00$83.89$90.00
76Traffic control (643.5000)EACH1$10,025$10,025$1,060.00$1,048.75$1,500.00
77Geotextile type HR (645.0120)SY28$6.00$15.00$13.00$25.17$15.00
78Marking line epoxy 4-inch (646.1020)LF6,700$0.40$0.40$0.65$0.63$1.00
79Marking line epoxy 8-inch (646.3020)LF2,440$1.05$1.05$1.50$1.45$1.50
80Marking dotted extension epoxy 18-inch (646.6320)LF147$14.15$14.15$13.00$12.90$13.00
81Marking diagonal epoxy 12-inch (646.7120)LF273$14.25$14.25$9.00$8.39$10.00
82Marking curb epoxy (646.8120)LF171$7.00$7.00$7.00$7.03$8.00
83Marking island nose epoxy (646.8220)EACH4$272.00$272.00$345.00$340.85$350.00
84Construction staking storm sewer (650.4000)EACH5$120.00$120.00$127.00$125.85$150.00
85Construction staking subgrade (650.4500)LF3,216$0.01$0.01$0.05$0.01$0.01
86Construction staking base (650.5000)LF3,216$2.00$2.00$2.10$2.10$2.00
87Construction staking curb gutter and curb & gutter (650.5500)LF3,860$2.50$2.50$2.70$2.62$1.00
88Construction staking pipe culverts (650.6000)EACH1$150.00$150.00$160.00$157.32$200.00
89Construction staking electrical installations (project) 001. 2801-03- 70 (650.8501)EACH1$1,380.00$1,380.00$1,460.00$1,447.28$1,500.00
90Construction staking sidewalk (project) 001. 2801-03-70 (650.9500)EACH1$1,700.00$1,700.00$1,800.00$1,782.89$2,000.00
91Construction staking supplemental control (project) 001. 2801-03-70 (650.9911)EACH1$1,500.00$1,500.00$1,590.00$1,573.13$2,000.00
92Construction staking slope stakes (650.9920)LF3,216$0.75$0.75$0.80$0.79$1.00
93Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,335$6.77$6.77$7.20$7.10$8.00
94Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF515$8.13$8.13$8.60$8.53$9.50
95Pull boxes steel 24X42-inch (653.0140)EACH6$1,296.47$1,296.47$1,375.00$1,359.68$1,400.00
96Concrete bases type 5 (654.0105)EACH14$972.43$972.43$1,030.00$1,019.84$1,200.00
97Concrete control cabinet bases type L24 (654.0224)EACH1$1,821.06$1,821.06$1,930.60$1,909.84$1,700.00
98Electrical wire lighting 12 AWG (655.0610)LF645$1.03$1.03$1.10$1.08$1.00
99Electrical wire lighting 8 AWG (655.0620)LF2,104$1.93$1.93$2.05$2.02$3.50
100Electrical service meter breaker pedestal (location) 001. 2803-03-71 (656.0201)EACH1$999.37$999.37$1,060.00$1,048.10$1,500.00
101Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH14$702.04$702.04$745.00$736.27$650.00
102Poles type 5-aluminum (657.0322)EACH14$2,086.77$2,086.77$2,210.00$2,188.51$2,000.00
103Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH14$371.10$371.10$395.00$389.19$300.00
104Luminaires utility LED A (659.1115)EACH14$302.61$302.61$320.00$317.36$400.00
105Lighting control cabinets 120/240 24-inch (659.2124)EACH1$8,856.35$8,856.35$9,375.00$9,288.13$9,000.00
106Sawing asphalt (690.0150)LF260$1.95$1.20$5.00$4.28$2.00
107Incentive compressive strength concrete pavement (715.0720)DOL320$1.00$1.00$1.00$1.00$1.00
108On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS350$5.00$5.00$5.00$5.00$5.00
109On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS900$5.00$5.00$5.00$5.00$5.00
110Special 001. concrete curb & gutter 3-inch sloped 36-inch type T (SPV.0090)LF258$35.00$35.00$37.00$36.71$42.00
WisDOT contract 20250513014: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy