WisDOT contract 20250513018 bid tabulation
Appleton- Green Bay; IH 41 Wrightstown Swef 34/Post-Site (IH 041, Outagamie County Appleton - Green Bay). Let by Wisconsin DOT on May 13, 2025, Outagamie. 4 bids received; low bid $8,024,403 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 13 MAY 2025
- Pay items
- 193
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $8,024,403 | Low |
| 2 | Michels Road & Stone, Inc. | $8,038,174 | 0.0% |
| 3 | Zignego Company, Inc. | $8,725,906 | +9.0% |
| 4 | Hoffman Construction Company | $10,286,702 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Michels Road & Stone, Inc. | 3. Zignego Company, Inc. | 4. Hoffman Construction Company |
|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 36 | $200.00 | $499.00 | $200.00 | $474.75 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 3 | $465.00 | $465.00 | $1,250.00 | $1,000.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 1,660 | $4.85 | $6.00 | $5.10 | $10.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 1,280 | $3.00 | $3.00 | $3.00 | $10.00 |
| 5 | Removing fence (204.0170) | LF | 1,750 | $4.00 | $2.00 | $3.00 | $2.00 |
| 6 | Removing delineators and markers (204.0180) | EACH | 16 | $18.00 | $25.00 | $50.00 | $25.00 |
| 7 | Removing concrete bases (204.0195) | EACH | 2 | $200.00 | $200.00 | $200.00 | $200.00 |
| 8 | Removing inlets (204.0220) | EACH | 2 | $415.00 | $415.00 | $533.00 | $500.00 |
| 9 | Site clearance (parcel) 001. 1130- 44-75 (204.0241) | EACH | 1 | $2,000.00 | $3,000.00 | $0.01 | $100.00 |
| 10 | Removing (item description) 002. removing communications vault (204.9060.S) | EACH | 1 | $250.00 | $250.00 | $250.00 | $250.00 |
| 11 | Removing (item description) 001. removing electrical conductors from existing conduit (204.9090.S) | LF | 295 | $2.00 | $2.00 | $2.00 | $2.00 |
| 12 | Excavation common (205.0100) | CY | 10,000 | $5.77 | $9.90 | $7.10 | $10.00 |
| 13 | Borrow (208.0100) | CY | 81,000 | $0.01 | $7.70 | $12.50 | $20.00 |
| 14 | Finishing roadway (project) 001. 1130-44-75 (213.0100) | EACH | 1 | $2,500.00 | $5,000.00 | $1,000.00 | $100.00 |
| 15 | Obliterating old road (214.0100) | STA | 2 | $1,000.00 | $950.00 | $1,090.00 | $500.00 |
| 16 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,500 | $30.31 | $20.10 | $19.65 | $35.17 |
| 17 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 14,630 | $15.00 | $15.00 | $14.76 | $25.17 |
| 18 | Coloring concrete wisdot red (405.0100) | CY | 625 | $78.00 | $60.19 | $150.00 | $78.00 |
| 19 | Concrete pavement 10-inch (415.0100) | SY | 22,210 | $61.48 | $54.40 | $58.12 | $61.48 |
| 20 | Concrete pavement 11-inch (415.0110) | SY | 6,450 | $66.15 | $63.66 | $63.00 | $66.15 |
| 21 | Concrete pavement joint filling (415.4100) | SY | 22,840 | $2.50 | $1.70 | $1.70 | $2.50 |
| 22 | Rout and seal (415.6000.S) | LF | 3,860 | $1.50 | $2.45 | $2.45 | $1.50 |
| 23 | Drilled dowel bars (416.0620) | EACH | 15 | $17.50 | $48.89 | $30.00 | $17.50 |
| 24 | Tack coat (455.0605) | GAL | 350 | $4.95 | $4.95 | $5.50 | $4.95 |
| 25 | Incentive density HMA pavement (460.2000) | DOL | 300 | $1.00 | $1.00 | $1.00 | $1.00 |
| 26 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 190 | $128.50 | $128.50 | $96.00 | $128.50 |
| 27 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 175 | $128.50 | $128.50 | $99.00 | $128.50 |
| 28 | Asphaltic surface temporary (465.0125) | TON | 761 | $128.50 | $128.50 | $87.00 | $128.50 |
| 29 | Asphaltic flumes (465.0315) | SY | 25 | $68.50 | $68.50 | $45.00 | $68.50 |
| 30 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 11 | $1,068.00 | $1,068.00 | $429.00 | $750.00 |
| 31 | Apron endwalls for culvert pipe 36- inch (520.1036) | EACH | 1 | $2,900.00 | $2,900.00 | $1,370.00 | $1,500.00 |
| 32 | Culvert pipe class III-A non-metal 18-inch (520.3418) | LF | 285 | $57.05 | $57.05 | $74.50 | $60.00 |
| 33 | Concrete collars for pipe (520.8000) | EACH | 2 | $518.25 | $518.25 | $949.00 | $1,000.00 |
| 34 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 100 | $79.20 | $79.20 | $138.00 | $100.00 |
| 35 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,322.90 | $1,322.90 | $1,540.00 | $2,500.00 |
| 36 | Culvert pipe corrugated polypropylene 12-inch (530.1112) | LF | 69 | $42.45 | $42.45 | $69.50 | $60.00 |
| 37 | Drilling shaft 30-inch (531.2030) | LF | 26 | $350.00 | $175.00 | $350.00 | $175.00 |
| 38 | Drilling shaft 42-inch (531.2042) | LF | 18 | $450.00 | $250.00 | $350.00 | $250.00 |
| 39 | Drilling shaft 48-inch (531.2048) | LF | 44 | $475.00 | $475.00 | $475.00 | $475.00 |
| 40 | Foundation high mast 100-FT (structure) 001. L-44-001 (531.4500) | EACH | 1 | $24,500 | $24,500 | $24,500 | $24,500 |
| 41 | Foundation high mast 100-FT (structure) 002. L-44-002 (531.4500) | EACH | 1 | $24,500 | $24,500 | $24,500 | $24,500 |
| 42 | Foundation single-shaft type MC-III (structure) 001. S-44-320 (531.5130) | EACH | 1 | $13,250 | $10,500 | $9,000.00 | $10,500 |
| 43 | Foundation single-shaft type MF-II (structure) 001. S-44-321 (531.5220) | EACH | 2 | $5,750.00 | $6,000.00 | $5,650.00 | $6,000.00 |
| 44 | High mast 100-FT (structure) 001. L-44-001 (532.4500) | EACH | 1 | $47,177 | $47,177 | $47,177 | $47,177 |
| 45 | High mast 100-FT (structure) 002. L-44-002 (532.4500) | EACH | 1 | $47,177 | $47,177 | $47,177 | $47,177 |
| 46 | Monotube cantilever type III (structure) 001. S-44-320 (532.5130) | EACH | 1 | $25,750 | $19,500 | $25,540 | $19,500 |
| 47 | Monotube full span type II (structure) 001. S-44-321 (532.5220) | EACH | 1 | $47,250 | $35,500 | $41,565 | $35,500 |
| 48 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 1,270 | $23.50 | $23.00 | $35.00 | $23.50 |
| 49 | Concrete sidewalk 4-inch (602.0405) | SF | 9,850 | $7.10 | $6.75 | $6.28 | $7.10 |
| 50 | Curb ramp detectable warning field yellow (602.0505) | SF | 20 | $32.00 | $50.00 | $100.00 | $32.00 |
| 51 | Concrete surface drains (602.3010) | CY | 7 | $750.00 | $750.00 | $1,000.00 | $750.00 |
| 52 | Concrete barrier type S32 (603.1132) | LF | 180 | $304.00 | $266.12 | $250.00 | $304.00 |
| 53 | Riprap medium (606.0200) | CY | 30 | $95.38 | $120.00 | $141.00 | $200.00 |
| 54 | Storm sewer pipe class III-A 15- inch (608.3015) | LF | 137 | $63.65 | $63.65 | $64.00 | $55.00 |
| 55 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 606 | $60.70 | $60.70 | $69.50 | $60.00 |
| 56 | Storm sewer pipe class III-A 24- inch (608.3024) | LF | 272 | $73.40 | $73.40 | $84.50 | $70.00 |
| 57 | Storm sewer pipe class III-A 36- inch (608.3036) | LF | 555 | $96.95 | $96.95 | $116.00 | $100.00 |
| 58 | Inlet covers type HM (611.0627) | EACH | 1 | $694.00 | $694.00 | $1,170.00 | $1,200.00 |
| 59 | Inlet covers type H-S (611.0639) | EACH | 6 | $694.00 | $694.00 | $1,170.00 | $1,200.00 |
| 60 | Inlet covers type MS (611.0642) | EACH | 4 | $480.00 | $480.00 | $762.00 | $900.00 |
| 61 | Inlet covers type Z (611.0666) | EACH | 1 | $705.00 | $705.00 | $1,190.00 | $1,200.00 |
| 62 | Manholes 5-FT diameter (611.2005) | EACH | 4 | $7,925.00 | $7,925.00 | $7,780.00 | $12,000 |
| 63 | Inlets 4-FT diameter (611.3004) | EACH | 4 | $4,245.00 | $4,245.00 | $3,520.00 | $6,000.00 |
| 64 | Inlets median 1 grate (611.3901) | EACH | 4 | $3,677.00 | $3,677.00 | $3,840.00 | $4,000.00 |
| 65 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 6 | $27.65 | $27.65 | $45.50 | $100.00 |
| 66 | Pipe underdrain unperforated 8- inch (612.0208) | LF | 22 | $30.30 | $30.30 | $44.00 | $100.00 |
| 67 | Crash cushions permanent (614.0800) | EACH | 2 | $25,850 | $25,850 | $23,500 | $25,850 |
| 68 | Fence chain link 6-FT (616.0206) | LF | 1,765 | $24.00 | $24.00 | $24.00 | $24.00 |
| 69 | Maintenance and repair of haul roads (project) 001. 1130-44-75 (618.0100) | EACH | 1 | $0.01 | $0.01 | $1.00 | $100.00 |
| 70 | Mobilization (619.1000) | EACH | 1 | $959,000 | $527,019 | $728,000 | $1,229,878 |
| 71 | Concrete median sloped nose (620.0300) | SF | 150 | $14.00 | $17.00 | $20.00 | $14.00 |
| 72 | Water (624.0100) | MGAL | 250 | $0.01 | $50.00 | $34.00 | $100.00 |
| 73 | Topsoil (625.0100) | SY | 125 | $10.00 | $7.00 | $5.20 | $3.00 |
| 74 | Salvaged topsoil (625.0500) | SY | 22,370 | $2.35 | $2.70 | $0.90 | $3.00 |
| 75 | Mulching (627.0200) | SY | 10,000 | $0.35 | $0.40 | $0.30 | $0.40 |
| 76 | Erosion bales (628.1104) | EACH | 50 | $15.00 | $12.50 | $12.00 | $12.50 |
| 77 | Silt fence (628.1504) | LF | 6,000 | $1.95 | $2.00 | $2.00 | $2.00 |
| 78 | Silt fence maintenance (628.1520) | LF | 48,000 | $0.01 | $0.01 | $0.01 | $0.01 |
| 79 | Mobilizations erosion control (628.1905) | EACH | 8 | $250.00 | $100.00 | $1.00 | $100.00 |
| 80 | Mobilizations emergency erosion control (628.1910) | EACH | 8 | $150.00 | $100.00 | $1.00 | $100.00 |
| 81 | Erosion mat class I type A (628.2002) | SY | 21,060 | $1.35 | $1.05 | $1.10 | $1.05 |
| 82 | Erosion mat class I type B (628.2004) | SY | 5,500 | $1.35 | $1.05 | $1.10 | $1.05 |
| 83 | Erosion mat urban class I type B (628.2008) | SY | 2,200 | $1.85 | $1.75 | $3.00 | $1.75 |
| 84 | Inlet protection type A (628.7005) | EACH | 14 | $25.00 | $75.00 | $150.00 | $75.00 |
| 85 | Inlet protection type B (628.7010) | EACH | 6 | $62.00 | $60.00 | $100.00 | $60.00 |
| 86 | Inlet protection type C (628.7015) | EACH | 8 | $68.00 | $60.00 | $100.00 | $60.00 |
| 87 | Culvert pipe checks (628.7555) | EACH | 30 | $15.00 | $20.00 | $15.00 | $20.00 |
| 88 | Tracking pads (628.7560) | EACH | 2 | $2,500.00 | $1,500.00 | $1,000.00 | $3,000.00 |
| 89 | Fertilizer type B (629.0210) | CWT | 20 | $95.00 | $85.00 | $150.00 | $85.00 |
| 90 | Seeding mixture no. 10 (630.0110) | LB | 200 | $7.65 | $8.75 | $7.00 | $8.75 |
| 91 | Seeding mixture no. 30 (630.0130) | LB | 890 | $7.65 | $8.50 | $7.00 | $8.50 |
| 92 | Seeding mixture no. 40 (630.0140) | LB | 50 | $7.65 | $15.00 | $10.00 | $15.00 |
| 93 | Seeding temporary (630.0200) | LB | 200 | $3.50 | $4.00 | $2.00 | $4.00 |
| 94 | Seeding borrow pit (630.0300) | LB | 500 | $7.65 | $8.25 | $2.00 | $8.25 |
| 95 | Seed water (630.0500) | MGAL | 630 | $5.00 | $20.00 | $0.01 | $20.00 |
| 96 | Shrubs (species, root, size) 001. everlow yew, CG, #5 (632.0201) | EACH | 2 | $135.00 | $175.00 | $20.00 | $175.00 |
| 97 | Shrubs (species, root, size) 002. bush cinquefoil, CG, #5 (632.0201) | EACH | 3 | $135.00 | $125.00 | $20.00 | $125.00 |
| 98 | Shrubs (species, root, size) 003. gro-low sumac, CG, #5 (632.0201) | EACH | 5 | $135.00 | $90.00 | $20.00 | $90.00 |
| 99 | Landscape planting surveillance and care cycles (632.9101) | EACH | 16 | $250.00 | $600.00 | $300.00 | $600.00 |
| 100 | Delineator posts steel (633.0100) | EACH | 49 | $35.00 | $35.00 | $70.00 | $35.00 |
| 101 | Delineator reflectors (633.0500) | EACH | 49 | $8.00 | $6.00 | $15.00 | $6.00 |
| 102 | Delineators barrier wall (633.1000) | EACH | 9 | $59.00 | $45.00 | $100.00 | $45.00 |
| 103 | Markers culvert end (633.5200) | EACH | 12 | $68.00 | $65.00 | $85.00 | $65.00 |
| 104 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 1 | $75.00 | $80.00 | $140.00 | $80.00 |
| 105 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 36 | $78.00 | $85.00 | $150.00 | $85.00 |
| 106 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 17 | $82.00 | $90.00 | $160.00 | $90.00 |
| 107 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 5 | $88.00 | $100.00 | $180.00 | $100.00 |
| 108 | Signs type II reflective H (637.2210) | SF | 339.79 | $21.95 | $20.00 | $30.00 | $20.00 |
| 109 | Signs type II reflective F (637.2230) | SF | 27 | $22.75 | $25.00 | $32.00 | $25.00 |
| 110 | Removing signs type I (638.2601) | EACH | 1 | $350.00 | $375.00 | $250.00 | $375.00 |
| 111 | Removing signs type II (638.2602) | EACH | 8 | $40.00 | $30.00 | $50.00 | $30.00 |
| 112 | Removing small sign supports (638.3000) | EACH | 11 | $40.00 | $35.00 | $50.00 | $35.00 |
| 113 | Removing structural steel sign supports (638.3100) | EACH | 2 | $400.00 | $350.00 | $400.00 | $350.00 |
| 114 | Traffic control drums (643.0300) | DAY | 22,420 | $0.14 | $0.14 | $0.25 | $0.14 |
| 115 | Traffic control barricades type III (643.0420) | DAY | 6,500 | $0.37 | $0.37 | $0.45 | $0.37 |
| 116 | Traffic control warning lights type A (643.0705) | DAY | 4,180 | $0.12 | $0.12 | $0.15 | $0.12 |
| 117 | Traffic control arrow boards (643.0800) | DAY | 1,020 | $6.75 | $6.75 | $10.00 | $6.75 |
| 118 | Traffic control signs (643.0900) | DAY | 7,700 | $0.25 | $0.25 | $0.45 | $0.25 |
| 119 | Traffic control covering signs type I (643.0910) | EACH | 3 | $235.00 | $235.00 | $325.00 | $235.00 |
| 120 | Traffic control signs fixed message (643.1000) | SF | 70 | $25.25 | $25.25 | $25.00 | $25.25 |
| 121 | Traffic control (643.5000) | EACH | 1 | $5,615.00 | $5,615.00 | $12,500 | $5,615.00 |
| 122 | Geotextile type HR (645.0120) | SY | 350 | $5.00 | $5.00 | $10.00 | $5.00 |
| 123 | Marking line epoxy 6-inch (646.2020) | LF | 10,814 | $1.40 | $1.40 | $1.40 | $1.40 |
| 124 | Marking line epoxy 10-inch (646.4020) | LF | 250 | $2.25 | $2.25 | $2.25 | $2.25 |
| 125 | Marking arrow epoxy (646.5020) | EACH | 3 | $360.00 | $360.00 | $360.00 | $360.00 |
| 126 | Marking symbol epoxy (646.5220) | EACH | 3 | $250.00 | $250.00 | $250.00 | $250.00 |
| 127 | Marking stop line epoxy 18-inch (646.6120) | LF | 30 | $13.50 | $13.50 | $13.50 | $13.50 |
| 128 | Marking yield line epoxy 18-inch (646.6220) | EACH | 27 | $130.00 | $130.00 | $130.00 | $130.00 |
| 129 | Marking diagonal epoxy 6-inch (646.7020) | LF | 2,632 | $3.00 | $3.00 | $3.00 | $3.00 |
| 130 | Marking chevron epoxy 24-inch (646.7220) | LF | 176 | $12.00 | $12.00 | $12.00 | $12.00 |
| 131 | Marking island nose epoxy (646.8220) | EACH | 2 | $350.00 | $350.00 | $350.00 | $350.00 |
| 132 | Marking parking stall epoxy (646.8320) | LF | 843 | $4.50 | $4.50 | $4.50 | $4.50 |
| 133 | Construction staking storm sewer (650.4000) | EACH | 20 | $40.11 | $40.11 | $40.11 | $40.11 |
| 134 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 60 | $0.63 | $0.63 | $0.63 | $0.63 |
| 135 | Construction staking pipe culverts (650.6000) | EACH | 3 | $103.00 | $103.00 | $103.00 | $103.00 |
| 136 | Construction staking concrete pavement (650.7000) | LF | 3,299 | $1.17 | $0.01 | $1.17 | $1.17 |
| 137 | Construction staking electrical installations (project) 001. 1130-44- 75 (650.8501) | EACH | 1 | $2,090.24 | $2,090.24 | $2,090.24 | $2,090.24 |
| 138 | Construction staking curb ramps (650.9000) | EACH | 2 | $95.59 | $95.59 | $95.59 | $95.59 |
| 139 | Construction staking sidewalk (project) 001. 1130-44-75 (650.9500) | EACH | 1 | $1,241.10 | $1,241.10 | $1,241.10 | $1,241.10 |
| 140 | Construction staking supplemental control (project) 001. 1130-44-75 (650.9911) | EACH | 1 | $450.00 | $450.00 | $450.00 | $450.00 |
| 141 | Construction staking slope stakes (650.9920) | LF | 6,150 | $0.82 | $0.82 | $0.82 | $0.82 |
| 142 | Conduit rigid nonmetallic schedule 40 1 1/4-inch (652.0215) | LF | 115 | $10.00 | $10.00 | $10.00 | $10.00 |
| 143 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 4,610 | $10.00 | $10.00 | $10.00 | $10.00 |
| 144 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 10 | $16.00 | $16.00 | $16.00 | $16.00 |
| 145 | Install conduit into existing item (652.0700.S) | EACH | 3 | $250.00 | $250.00 | $250.00 | $250.00 |
| 146 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 13 | $2,100.00 | $2,100.00 | $2,100.00 | $2,100.00 |
| 147 | Adjusting pull boxes (653.0900) | EACH | 3 | $250.00 | $250.00 | $250.00 | $250.00 |
| 148 | Concrete bases type 5 (654.0105) | EACH | 13 | $1,575.00 | $1,575.00 | $1,575.00 | $1,575.00 |
| 149 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,206 | $0.80 | $0.80 | $0.80 | $0.80 |
| 150 | Electrical wire lighting 10 AWG (655.0615) | LF | 7,776 | $0.90 | $0.90 | $0.90 | $0.90 |
| 151 | Electrical wire lighting 8 AWG (655.0620) | LF | 14,575 | $1.50 | $1.50 | $1.50 | $1.50 |
| 152 | Electrical wire lighting 6 AWG (655.0625) | LF | 4,289 | $2.75 | $2.75 | $2.75 | $2.75 |
| 153 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 13 | $600.00 | $600.00 | $600.00 | $600.00 |
| 154 | Poles type 2 (657.0305) | EACH | 2 | $1,925.00 | $1,925.00 | $1,925.00 | $1,925.00 |
| 155 | Poles type 5-aluminum (657.0322) | EACH | 11 | $1,665.00 | $1,665.00 | $1,665.00 | $1,665.00 |
| 156 | Luminaire arms truss type 4 1/2- inch clamp 15-FT (657.0715) | EACH | 13 | $700.00 | $700.00 | $700.00 | $700.00 |
| 157 | Luminaires high mast lighting LED (659.0400) | EACH | 6 | $2,078.00 | $2,078.00 | $2,078.00 | $2,078.00 |
| 158 | Luminaires utility LED B (659.1120) | EACH | 13 | $400.00 | $400.00 | $400.00 | $400.00 |
| 159 | High mast lowering assembly (structure) 001. L-44-001 (660.0500) | EACH | 1 | $63,677 | $63,677 | $63,677 | $63,677 |
| 160 | High mast lowering assembly (structure) 002. L-44-002 (660.0500) | EACH | 1 | $63,677 | $63,677 | $63,677 | $63,677 |
| 161 | Fiber optic cable marker (671.0300) | EACH | 2 | $75.00 | $75.00 | $75.00 | $75.00 |
| 162 | Communication vault type 1 (673.0105) | EACH | 1 | $2,250.00 | $2,250.00 | $2,250.00 | $2,250.00 |
| 163 | Tracer wire marker posts (673.0200) | EACH | 2 | $125.00 | $125.00 | $125.00 | $125.00 |
| 164 | Remove cable (674.0300) | LF | 745 | $2.00 | $2.00 | $2.00 | $2.00 |
| 165 | Reinstall cable (674.0400) | LF | 745 | $2.00 | $2.00 | $2.00 | $2.00 |
| 166 | Sawing asphalt (690.0150) | LF | 350 | $3.00 | $1.95 | $1.95 | $1.25 |
| 167 | Sawing concrete (690.0250) | LF | 30 | $3.00 | $2.95 | $2.95 | $2.25 |
| 168 | Incentive strength concrete barrier (715.0603) | DOL | 90 | $1.00 | $1.00 | $1.00 | $1.00 |
| 169 | Incentive compressive strength concrete pavement (715.0720) | DOL | 8,420 | $1.00 | $1.00 | $1.00 | $1.00 |
| 170 | Incentive iri ride (740.0440) | DOL | 1,140 | $1.00 | $1.00 | $1.00 | $1.00 |
| 171 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 172 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 173 | Special 001. granite chips (SPV.0035) | CY | 15 | $425.00 | $220.00 | $500.00 | $350.00 |
| 174 | Special 001. static scale system (SPV.0060) | EACH | 1 | $659,785 | $659,785 | $659,785 | $759,785 |
| 175 | Special 002. static scale system warranty maintenance (SPV.0060) | EACH | 1 | $33,500 | $33,500 | $33,500 | $33,500 |
| 176 | Special 003. pipe bollard (SPV.0060) | EACH | 8 | $1,000.00 | $1,000.00 | $1,000.00 | $980.00 |
| 177 | Special 004. concrete wheel stop (SPV.0060) | EACH | 3 | $750.00 | $245.00 | $1,250.00 | $245.00 |
| 178 | Special 005. oil/water separator system (SPV.0060) | EACH | 1 | $11,725 | $11,725 | $35,400 | $15,500 |
| 179 | Special 006. flag pole (SPV.0060) | EACH | 1 | $6,500.00 | $6,500.00 | $6,500.00 | $4,000.00 |
| 180 | Special 007. outlet structure (SPV.0060) | EACH | 1 | $3,865.00 | $3,865.00 | $10,600 | $4,000.00 |
| 181 | Special 008. weigh-in-motion system (SPV.0060) | EACH | 1 | $2,070,727 | $2,070,727 | $2,070,727 | $2,070,727 |
| 182 | Special 009. weigh-in-motion system warranty maintenance (SPV.0060) | EACH | 1 | $370,565 | $370,565 | $370,565 | $370,565 |
| 183 | Special 010. electrical service, wrightstown swef mainline wim (SPV.0060) | EACH | 1 | $2,250.00 | $2,250.00 | $2,250.00 | $2,250.00 |
| 184 | Special 011. security camera (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 185 | Special 050. install lighted bollard (SPV.0060) | EACH | 5 | $1,975.00 | $1,975.00 | $1,975.00 | $1,975.00 |
| 186 | Special 051. flood light (sign) (SPV.0060) | EACH | 2 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 |
| 187 | Special 052. flood light (flag pole) (SPV.0060) | EACH | 2 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 |
| 188 | Special 053. modify existing lighting controls (SPV.0060) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 189 | Special 001. concrete curb & gutter 24-inch type A (SPV.0090) | LF | 1,600 | $26.35 | $30.00 | $29.00 | $26.35 |
| 190 | Special 002. concrete curb & gutter 24-inch type D (SPV.0090) | LF | 60 | $47.50 | $50.00 | $75.00 | $47.50 |
| 191 | Special 003. construction staking fence (SPV.0090) | LF | 1,765 | $0.82 | $0.82 | $0.82 | $0.82 |
| 192 | Special 001. scale approach pavement reinforcement (SPV.0180) | SY | 270 | $60.00 | $50.00 | $50.00 | $60.00 |
| 193 | Special 002. weed barrier fabric (SPV.0180) | SY | 120 | $5.00 | $10.00 | $8.00 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.