WisDOT contract 20250513028 bid tabulation
Abbotsford - Wausau; Bridge Overlays B-37-0116, 0287 (STH 029, Marathon County Abbotsford - Wausau). Let by Wisconsin DOT on May 13, 2025, Marathon. 2 bids received; low bid $459,329 by Norcon Corporation.
- Owner
- Wisconsin DOT
- Letting
- 13 MAY 2025
- Pay items
- 67
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Norcon Corporation | $459,329 | Low |
| 2 | Fahrner Asphalt Sealers, LLC | $475,369 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Norcon Corporation | 2. Fahrner Asphalt Sealers, LLC |
|---|---|---|---|---|---|
| 1 | Abatement of asbestos containing material (structure) 01. B-37-0116 (203.0211.S) | EACH | 1 | $8,300.00 | $10,000 |
| 2 | Removing concrete pavement (204.0100) | SY | 88 | $12.13 | $22.90 |
| 3 | Removing guardrail (204.0165) | LF | 396 | $3.10 | $4.50 |
| 4 | Removing surface drains (204.0190) | EACH | 1 | $100.00 | $625.00 |
| 5 | Excavation common (205.0100) | CY | 817 | $14.97 | $24.90 |
| 6 | Finishing roadway (project) 1053- 00-71 (213.0100) | EACH | 1 | $500.00 | $3,000.00 |
| 7 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 314 | $26.04 | $28.45 |
| 8 | Concrete pavement 6-inch (415.0060) | SY | 45 | $137.00 | $146.95 |
| 9 | Concrete pavement approach slab (415.0410) | SY | 90 | $345.00 | $340.59 |
| 10 | Drilled dowel bars (416.0620) | EACH | 101 | $21.00 | $20.59 |
| 11 | Pigmented surface sealer reseal (502.3205) | SY | 420 | $13.50 | $9.35 |
| 12 | Preparation decks type 1 (509.0301) | SY | 27 | $227.00 | $250.00 |
| 13 | Preparation decks type 2 (509.0302) | SY | 9 | $245.00 | $400.00 |
| 14 | Sawing pavement deck preparation areas 01. B-37-0116 (509.0310.S) | LF | 220 | $6.25 | $5.00 |
| 15 | Sawing pavement deck preparation areas 02. B-37-0287 (509.0310.S) | LF | 50 | $6.25 | $5.00 |
| 16 | Polymer overlay 01. B-37-0116 (509.5100.S) | SY | 2,030 | $33.23 | $40.25 |
| 17 | Polymer overlay 02. B-37-0287 (509.5100.S) | SY | 1,180 | $33.23 | $40.25 |
| 18 | Removing polymer overlay (structure) 01. B-37-0116 (509.9015.S) | SY | 2,030 | $5.90 | $14.00 |
| 19 | Removing polymer overlay (structure) 02. structure B-37-0287 (509.9015.S) | SY | 1,180 | $10.15 | $14.00 |
| 20 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 10 | $80.00 | $125.57 |
| 21 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 60 | $74.00 | $125.57 |
| 22 | Concrete surface drains (602.3010) | CY | 12 | $1,450.00 | $734.75 |
| 23 | Riprap medium (606.0200) | CY | 2 | $100.00 | $365.00 |
| 24 | Adjusting inlet covers (611.8115) | EACH | 1 | $1,250.00 | $898.50 |
| 25 | MGS guardrail 3 (614.2300) | LF | 25 | $30.10 | $27.90 |
| 26 | MGS thrie beam transition (614.2500) | LF | 156 | $94.50 | $102.90 |
| 27 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,650.00 | $3,819.00 |
| 28 | Maintenance and repair of haul roads (project) 1053-00-71 (618.0100) | EACH | 1 | $1.00 | $2,500.00 |
| 29 | Mobilization (619.1000) | EACH | 1 | $83,491 | $47,500 |
| 30 | Water (624.0100) | MGAL | 6 | $50.00 | $1.00 |
| 31 | Topsoil (625.0100) | SY | 779 | $7.39 | $6.80 |
| 32 | Silt fence (628.1504) | LF | 1,085 | $2.50 | $2.40 |
| 33 | Silt fence maintenance (628.1520) | LF | 1,085 | $0.10 | $0.01 |
| 34 | Mobilizations erosion control (628.1905) | EACH | 4 | $100.00 | $300.00 |
| 35 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $1.00 |
| 36 | Erosion mat class I type A (628.2002) | SY | 779 | $2.10 | $2.00 |
| 37 | Inlet protection type B (628.7010) | EACH | 2 | $60.00 | $75.00 |
| 38 | Fertilizer type B (629.0210) | CWT | 0.50 | $100.00 | $300.00 |
| 39 | Seeding mixture no. 30 (630.0130) | LB | 36 | $7.80 | $29.50 |
| 40 | Seed water (630.0500) | MGAL | 264 | $10.00 | $0.50 |
| 41 | Field office type B (642.5001) | EACH | 1 | $7,200.00 | $10,000 |
| 42 | Traffic control drums (643.0300) | DAY | 12,164 | $0.15 | $0.15 |
| 43 | Traffic control barricades type III (643.0420) | DAY | 363 | $1.00 | $1.00 |
| 44 | Traffic control warning lights type A (643.0705) | DAY | 654 | $0.25 | $0.25 |
| 45 | Traffic control warning lights type C (643.0715) | DAY | 1,432 | $0.25 | $0.25 |
| 46 | Traffic control arrow boards (643.0800) | DAY | 50 | $15.00 | $15.00 |
| 47 | Traffic control signs (643.0900) | DAY | 2,133 | $0.30 | $0.30 |
| 48 | Traffic control covering signs type II (643.0920) | EACH | 4 | $105.00 | $105.00 |
| 49 | Traffic control signs fixed message (643.1000) | SF | 72 | $15.75 | $15.75 |
| 50 | Temporary marking line removable tape 6-inch (643.3180) | LF | 4,920 | $2.05 | $2.05 |
| 51 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 24 | $7.00 | $7.00 |
| 52 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 1,345 | $2.70 | $2.70 |
| 53 | Traffic control (643.5000) | EACH | 1 | $20,800 | $20,800 |
| 54 | Geotextile type HR (645.0120) | SY | 9 | $10.00 | $7.00 |
| 55 | Marking line epoxy 6-inch (646.2020) | LF | 4,876 | $2.00 | $1.75 |
| 56 | Marking line epoxy 10-inch (646.4020) | LF | 501 | $3.00 | $3.35 |
| 57 | Marking removal line 4-inch (646.9000) | LF | 400 | $1.15 | $1.15 |
| 58 | Construction staking base (650.5000) | LF | 741 | $0.20 | $0.45 |
| 59 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 70 | $10.00 | $4.00 |
| 60 | Construction staking concrete pavement (650.7000) | LF | 96 | $2.00 | $4.00 |
| 61 | Construction staking supplemental control (project) 1053-00-71 (650.9911) | EACH | 1 | $10.00 | $2,389.55 |
| 62 | Construction staking slope stakes (650.9920) | LF | 402 | $4.00 | $4.00 |
| 63 | Temporary traffic signals for bridges (structure) B-37-0287 (661.0101) | EACH | 1 | $8,425.00 | $8,425.00 |
| 64 | Sawing asphalt (690.0150) | LF | 167 | $2.00 | $1.50 |
| 65 | Sawing concrete (690.0250) | LF | 131 | $3.25 | $2.50 |
| 66 | Special 01. rapid set deck repair (SPV.0035) | CY | 3 | $3,150.00 | $2,750.00 |
| 67 | Special 01. reinforced concrete pavement approach approach slab repair (SPV.0180) | SY | 4 | $2,365.00 | $700.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.