| 1 | Roadside clearing (202.0110) | SY | 115 | $30.00 | $0.01 |
| 2 | Removing asphaltic surface (204.0110) | SY | 65 | $4.30 | $12.50 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 96 | $18.25 | $12.40 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 156,284 | $0.40 | $1.70 |
| 5 | Removing curb & gutter (204.0150) | LF | 136 | $15.00 | $9.50 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 57 | $10.00 | $17.00 |
| 7 | Prepare foundation for asphaltic paving (project) 01. 6090-14-71 (211.0101) | EACH | 1 | $3,450.00 | $8,350.00 |
| 8 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 738 | $44.90 | $77.00 |
| 9 | Finishing roadway (project) 01. 6090-14-71 (213.0100) | EACH | 1 | $2,150.00 | $3,353.00 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 782 | $38.75 | $23.80 |
| 11 | HMA cold weather paving (450.4000) | TON | 5,260 | $0.01 | $0.50 |
| 12 | Tack coat (455.0605) | GAL | 10,924 | $3.25 | $2.75 |
| 13 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $2,450.00 | $2,318.00 |
| 14 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,950.00 | $3,717.00 |
| 15 | Incentive density PWL HMA pavement (460.2005) | DOL | 14,270 | $1.00 | $1.00 |
| 16 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 8,780 | $1.00 | $1.00 |
| 17 | Incentive air voids HMA pavement (460.2010) | DOL | 21,040 | $1.00 | $1.00 |
| 18 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 21,053 | $60.10 | $68.80 |
| 19 | Asphaltic surface (465.0105) | TON | 2,199 | $68.70 | $112.00 |
| 20 | Asphaltic rumble strips, shoulder (465.0520) | LF | 73,808 | $0.32 | $0.13 |
| 21 | Asphaltic rumble strips, centerline (465.0560) | LF | 36,904 | $0.32 | $0.16 |
| 22 | Asphaltic rumble strips, transverse (465.0580) | SY | 158 | $26.15 | $30.00 |
| 23 | Cleaning culvert pipes (520.8700) | EACH | 1 | $5,000.00 | $2,000.00 |
| 24 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 131 | $125.00 | $55.00 |
| 25 | Concrete sidewalk 5-inch (602.0410) | SF | 225 | $10.00 | $18.20 |
| 26 | Curb ramp detectable warning field yellow (602.0505) | SF | 20 | $50.00 | $33.00 |
| 27 | Reconstructing manholes (611.0420) | EACH | 2 | $1,100.00 | $3,000.00 |
| 28 | Manhole covers type J-special (611.0535) | EACH | 1 | $1,830.00 | $1,500.00 |
| 29 | Adjusting inlet covers (611.8115) | EACH | 1 | $1,850.00 | $1,200.00 |
| 30 | Maintenance and repair of haul roads (project) 01. 6090-14-71 (618.0100) | EACH | 1 | $100.00 | $0.72 |
| 31 | Mobilization (619.1000) | EACH | 1 | $80,000 | $188,166 |
| 32 | Water (624.0100) | MGAL | 16 | $20.00 | $200.00 |
| 33 | Topsoil (625.0100) | SY | 83 | $20.00 | $14.50 |
| 34 | Silt fence (628.1504) | LF | 30 | $5.00 | $20.00 |
| 35 | Silt fence maintenance (628.1520) | LF | 15 | $10.00 | $0.25 |
| 36 | Mobilizations erosion control (628.1905) | EACH | 1 | $250.00 | $250.00 |
| 37 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $250.00 | $200.00 |
| 38 | Erosion mat urban class I type B (628.2008) | SY | 83 | $3.00 | $10.00 |
| 39 | Inlet protection type C (628.7015) | EACH | 3 | $75.00 | $75.00 |
| 40 | Rock bags (628.7570) | EACH | 25 | $20.00 | $18.00 |
| 41 | Fertilizer type B (629.0210) | CWT | 0.04 | $500.00 | $500.00 |
| 42 | Seeding mixture no. 40 (630.0140) | LB | 2 | $50.00 | $100.00 |
| 43 | Seed water (630.0500) | MGAL | 0.50 | $100.00 | $200.00 |
| 44 | Markers culvert end (633.5200) | EACH | 3 | $75.00 | $100.00 |
| 45 | Field office type B (642.5001) | EACH | 1 | $7,450.00 | $10,448 |
| 46 | Traffic control drums (643.0300) | DAY | 542 | $0.80 | $1.00 |
| 47 | Traffic control barricades type III (643.0420) | DAY | 20 | $5.00 | $5.00 |
| 48 | Traffic control warning lights type A (643.0705) | DAY | 40 | $0.65 | $1.00 |
| 49 | Traffic control signs (643.0900) | DAY | 1,834 | $1.25 | $0.50 |
| 50 | Traffic control signs PCMS (643.1050) | DAY | 28 | $85.00 | $50.00 |
| 51 | Truck or trailer mounted attenuator (643.1055.S) | DAY | 8 | $468.74 | $400.00 |
| 52 | Temporary marking line paint 6- inch (643.3165) | LF | 41,500 | $0.50 | $0.50 |
| 53 | Traffic control (643.5000) | EACH | 1 | $11,650 | $1,000.00 |
| 54 | Temporary pedestrian barricade (644.1810) | LF | 6 | $25.00 | $4.00 |
| 55 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 129,059 | $1.20 | $1.20 |
| 56 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 695 | $3.00 | $3.00 |
| 57 | Marking arrow epoxy (646.5020) | EACH | 8 | $245.00 | $245.00 |
| 58 | Marking word epoxy (646.5120) | EACH | 1 | $330.00 | $330.00 |
| 59 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $1,100.00 | $1,100.00 |
| 60 | Marking stop line epoxy 18-inch (646.6120) | LF | 270 | $13.00 | $13.00 |
| 61 | Cold weather marking epoxy 6-inch (646.6466) | LF | 32,265 | $0.40 | $0.40 |
| 62 | Cold weather marking epoxy 10- inch (646.6470) | LF | 59 | $2.00 | $2.00 |
| 63 | Marking diagonal epoxy 12-inch (646.7120) | LF | 95 | $11.00 | $11.00 |
| 64 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 126 | $2.00 | $3.00 |
| 65 | Construction staking resurfacing reference (650.8000) | LF | 43,867 | $0.09 | $0.15 |
| 66 | Construction staking curb ramps (650.9000) | EACH | 2 | $190.34 | $500.00 |
| 67 | Construction staking supplemental control (project) 01. 6090-14-71 (650.9911) | EACH | 1 | $433.96 | $10.00 |
| 68 | Sawing asphalt (690.0150) | LF | 219 | $1.95 | $1.95 |
| 69 | Sawing concrete (690.0250) | LF | 8 | $2.95 | $2.95 |
| 70 | Incentive iri ride (740.0440) | DOL | 66,480 | $1.00 | $1.00 |
| 71 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 |
| 72 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,200 | $5.00 | $5.00 |
| 73 | Special 01. adjust water valve (SPV.0060) | EACH | 1 | $135.00 | $1,200.00 |