| 1 | Grubbing (201.0205) | STA | 2 | $750.00 | $750.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 1 | $1,145.00 | $1,145.00 |
| 3 | Removing structure (structure) 01. corrugated metal horizontal elliptical 53X83 (203.0220) | EACH | 2 | $4,375.00 | $4,375.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 17 | $25.00 | $25.00 |
| 5 | Removing asphaltic surface (204.0110) | SY | 110 | $10.68 | $10.68 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 85 | $27.40 | $27.40 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 18,966 | $3.70 | $3.70 |
| 8 | Removing curb & gutter (204.0150) | LF | 253 | $10.00 | $10.00 |
| 9 | Removing concrete sidewalk (204.0155) | SY | 121 | $18.00 | $18.00 |
| 10 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 14 | $19.75 | $19.75 |
| 11 | Excavation common (205.0100) | CY | 623 | $19.84 | $19.84 |
| 12 | Prepare foundation for asphaltic paving (project) 01. 9160-21-71 (211.0101) | EACH | 1 | $25,870 | $25,870 |
| 13 | Finishing roadway (project) 01. 9160-21-71 (213.0100) | EACH | 1 | $2,000.00 | $1,500.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 306 | $52.30 | $52.30 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 582 | $19.46 | $19.46 |
| 16 | Select crushed material (312.0110) | TON | 131 | $21.26 | $21.26 |
| 17 | Drilled tie bars (416.0610) | EACH | 34 | $8.00 | $10.00 |
| 18 | Tack coat (455.0605) | GAL | 1,350 | $3.90 | $3.90 |
| 19 | Incentive density HMA pavement (460.2000) | DOL | 1,440 | $1.00 | $1.00 |
| 20 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 2,520 | $96.80 | $96.80 |
| 21 | Asphaltic surface (465.0105) | TON | 20 | $243.00 | $243.00 |
| 22 | Asphaltic surface patching (465.0110) | TON | 50 | $243.00 | $243.00 |
| 23 | Asphaltic flumes (465.0315) | SY | 48 | $74.00 | $74.00 |
| 24 | Asphaltic rumble strips, centerline (465.0560) | LF | 144 | $11.00 | $11.00 |
| 25 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,380.00 | $1,380.00 |
| 26 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 29X45-inch (522.2329) | LF | 16 | $247.50 | $247.50 |
| 27 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 2 | $3,252.00 | $3,252.00 |
| 28 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 53X83-inch (522.2653) | EACH | 4 | $6,582.00 | $6,582.00 |
| 29 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 253 | $63.50 | $63.50 |
| 30 | Concrete sidewalk 5-inch (602.0410) | SF | 1,088 | $10.50 | $10.00 |
| 31 | Riprap light (606.0100) | CY | 13 | $140.00 | $140.00 |
| 32 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 8 | $111.00 | $111.00 |
| 33 | Inlet covers type H (611.0624) | EACH | 1 | $741.00 | $741.00 |
| 34 | Adjusting inlet covers (611.8115) | EACH | 7 | $600.00 | $600.00 |
| 35 | Maintenance and repair of haul roads (project) 01. 9160-21-71 (618.0100) | EACH | 1 | $0.01 | $1.00 |
| 36 | Mobilization (619.1000) | EACH | 1 | $123,400 | $121,925 |
| 37 | Concrete corrugated median (620.0100) | SF | 60 | $16.00 | $16.00 |
| 38 | Concrete median sloped nose (620.0300) | SF | 95 | $16.00 | $16.00 |
| 39 | Water (624.0100) | MGAL | 9 | $50.00 | $50.00 |
| 40 | Topsoil (625.0100) | SY | 43 | $19.45 | $19.45 |
| 41 | Salvaged topsoil (625.0500) | SY | 486 | $3.25 | $3.25 |
| 42 | Silt fence (628.1504) | LF | 556 | $3.00 | $3.00 |
| 43 | Silt fence maintenance (628.1520) | LF | 556 | $1.00 | $1.00 |
| 44 | Mobilizations erosion control (628.1905) | EACH | 4 | $200.00 | $200.00 |
| 45 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $200.00 | $200.00 |
| 46 | Erosion mat urban class I type A (628.2006) | SY | 623 | $2.00 | $2.00 |
| 47 | Inlet protection type C (628.7015) | EACH | 9 | $75.00 | $75.00 |
| 48 | Temporary ditch checks (628.7504) | LF | 100 | $10.00 | $10.00 |
| 49 | Fertilizer type B (629.0210) | CWT | 0.50 | $250.00 | $250.00 |
| 50 | Seeding mixture no. 30 (630.0130) | LB | 29 | $10.00 | $10.00 |
| 51 | Seed water (630.0500) | MGAL | 12 | $50.00 | $50.00 |
| 52 | Markers culvert end (633.5200) | EACH | 5 | $75.00 | $75.00 |
| 53 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 1 | $100.00 | $100.00 |
| 54 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 2 | $100.00 | $100.00 |
| 55 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 2 | $100.00 | $100.00 |
| 56 | Signs type II reflective H (637.2210) | SF | 1.50 | $50.00 | $50.00 |
| 57 | Moving signs type II (638.2102) | EACH | 3 | $200.00 | $200.00 |
| 58 | Removing small sign supports (638.3000) | EACH | 3 | $50.00 | $50.00 |
| 59 | Field office type B (642.5001) | EACH | 1 | $8,500.00 | $7,860.00 |
| 60 | Traffic control drums (643.0300) | DAY | 504 | $1.00 | $1.00 |
| 61 | Traffic control barricades type III (643.0420) | DAY | 95 | $2.00 | $3.50 |
| 62 | Traffic control warning lights type A (643.0705) | DAY | 150 | $2.00 | $0.65 |
| 63 | Traffic control signs (643.0900) | DAY | 1,282 | $1.00 | $1.25 |
| 64 | Traffic control covering signs type II (643.0920) | EACH | 2 | $35.00 | $150.00 |
| 65 | Traffic control signs PCMS (643.1050) | DAY | 28 | $75.00 | $85.00 |
| 66 | Temporary marking line paint 6- inch (643.3165) | LF | 11,595 | $0.55 | $0.55 |
| 67 | Temporary marking line paint 10- inch (643.3265) | LF | 1,443 | $1.30 | $1.30 |
| 68 | Traffic control (643.5000) | EACH | 1 | $1,000.00 | $9,500.00 |
| 69 | Geotextile type R (645.0130) | SY | 25 | $5.00 | $5.00 |
| 70 | Marking line epoxy 6-inch (646.2020) | LF | 939 | $0.90 | $0.90 |
| 71 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 13,257 | $1.90 | $1.90 |
| 72 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 481 | $3.75 | $3.75 |
| 73 | Marking arrow epoxy (646.5020) | EACH | 4 | $350.00 | $350.00 |
| 74 | Marking symbol epoxy (646.5220) | EACH | 2 | $345.00 | $345.00 |
| 75 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $1,175.00 | $1,175.00 |
| 76 | Marking stop line epoxy 18-inch (646.6120) | LF | 64 | $17.50 | $17.50 |
| 77 | Marking corrugated median epoxy (646.8020) | SF | 253 | $5.25 | $5.25 |
| 78 | Marking curb epoxy (646.8120) | LF | 132 | $6.50 | $6.50 |
| 79 | Marking island nose epoxy (646.8220) | EACH | 6 | $295.00 | $295.00 |
| 80 | Marking parking stall epoxy (646.8320) | LF | 333 | $5.50 | $5.50 |
| 81 | Construction staking pipe culverts (650.6000) | EACH | 2 | $500.00 | $500.00 |
| 82 | Construction staking resurfacing reference (650.8000) | LF | 3,505 | $0.28 | $0.28 |
| 83 | Construction staking supplemental control (project) 01. 9160-21-71 (650.9911) | EACH | 1 | $10.00 | $10.00 |
| 84 | Sawing asphalt (690.0150) | LF | 486 | $1.95 | $1.95 |
| 85 | Sawing concrete (690.0250) | LF | 134 | $2.75 | $2.75 |
| 86 | Incentive iri ride (740.0440) | DOL | 2,760 | $1.00 | $1.00 |
| 87 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 600 | $5.00 | $5.00 |
| 88 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 |
| 89 | Special 01. foundation backfill (SPV.0035) | CY | 304 | $29.96 | $29.96 |
| 90 | Special 01.culvert pipe reinforced concrete horizontal elliptical class HE-IV 53X83-inch (SPV.0090) | LF | 220 | $739.75 | $753.50 |